Loading…
Loading…
8,780 live6,074 closing this weekmost from Local Self Government Department and PWD
8,780 results • Latest
1) BREATHABLE IMPERVIOUS SURGICAL GOWN SHOULD BE AN INTELLIGENT AND HIGH- PERFORMANCE GOWNA MADE UP OF 60-GSM LIGHT WEIGHT TRILAMINATE MATERIAL. GOWN SHOULD PROVIDE FULL IMPERVIOUSNESS TO BLOOD-BORNE PATHOGENS AND SHOULD MEET THEA STANDARDS SET BY AAMI PB70, ASTM F1671, AND EN 13795. BREATHABLE MEMBRANE SHOULD REACTSA TO BODY TEMPERATURE CHANGES, TO ENHANCE WATER VAPOR TRANSMISSION FOR WEARER COMFORT.A GOWN SHOULD BE AVAILABLE IN XL (130 CM), XLL (150 CM), AND 2 XLL (150 CM) WITH RAGLAN SLEEVES.A GOWN SHOULD BE USFDA APPROVED AND TO BE CLASSIFIED AS AN AAMI LEVEL 4 GOWN.A THE MANUFACTURING FACILITY SHOULD HOLD BSI CERTIFICATION FOR ISO 13485 COMPLIANCE & 2) C-ARM STERILE POLYTHENE COVER FOR C-ARM FLUROSCOPIC X- RAY MACHINE APPROX SIZE OF 130CM LENGTH AND 160CM BREADTH WITH NYLON TIES.
ANNUAL COMPREHENSIVE MAINTENANCE CONTRACT OF 2 NOs 13 PASSENGER LIFT (MAKE. KONE ELEVATOR INDIA PVT LTD) AT AGs STAFF QUARTERS, KALOOR, KOCHI DURING 2026-27.
1) METHYL PREDNISOLONE SUCCINATE INJ 125 MG VIAL, 2) METHYL PREDNISOLONE SODIUM ACETATE INJ 40 MG VIAL, 3) METHYL PREDNISOLONE SOD.SUCCINATE INJ 1 G VIAL, 4) METHYL PREDNISOLNE ACETATE INJ 80MG VIAL & 5) METHYL PREDNISOLONE SODIUM SUCCINATE INJ 500 MG VIAL
DISPOSABLE THR DRAPES SET MADE UP OF ABSORBENT AND IMPERVIOUS TRI-LAMINATED MATERIAL (POLYETHYLENE + POLYPROPYLENE) HSPP ABSORBENT REINFORCEMENT (POLYPROPYLENE + POLYETHYLENE) WITH FOLLOWING COMPONENTS. (1). HIP DRAPE 217/290X350 CM, 53X170 CM REINFORCEMENT,....., DISPOSABLE THR DRAPES SET MADE UP OF ABSORBENT AND IMPERVIOUS TRI-LAMINATED MATERIAL (POLYETHYLENE + POLYPROPYLENE) HSPP ABSORBENT REINFORCEMENT (POLYPROPYLENE + POLYETHYLENE) WITH FOLLOWING COMPONENTS. (1). HIP DRAPE 217/290X350 CM, 53X170 CM REINFORCEMENT,........
MLA-ADS-2025-26-THRIPPUNITHURA LAC-SITC OF 10 NOS. OF 08 MTR. MINI MAST WITH 5X150W LED FLOOD LIGHTS 14 NO OF 10 MTR HIGHT MAST WITH 200W X 6 LED FLOOD LIGHTS AT VARIOUS LOCATIONS IN MARADU MUNICIPALITY, KUMBALAM GP, UDAYAMPEROOR GP, THRIPUNITHURA
INTUBATING CATHETER/BOUGIE 14 FRENCH 70 CM LONG - (1) IT SHOULD FACILITATE ENDOTRACHEAL INTUBATION IN PATIENTS WHEN VISUALISATION OF THE GLOTTIS IS INADEQUATE. (2). INTRODUCER SHOULD BE A 14 FRENCH 70 CM LONG RADIO OPAQUE CATHETER FOR ADULTS (3). THE TIP SHOULD BE BLUNT AND ANGLED TO ASSIST IN PROPER PLACEMENT BEYOND THE VOCAL CORDS AND TO MINIMISE TRAUMA TO INTERNAL STRUCTURES. (4). SHOULD HAVE 2 REMOVABLE ADAPTERS TO PERMIT VENTILATION. ONE WITH A 15MM ADAPTER TO CONNECT TO VENTILATING CIRCUIT AND THE OTHER WITH LUER LOCK FOR JET VENTILATION. (5). SHOULD HAVE A THROUGH LUMEN TO ENSURE ADEQUATE AIRFLOW TO THE PATIENT AND TO AVOID HYPOXEMIA. (6). SHOULD HAVE A STIFFENING CANNULA TO ADD RIGIDITY TO THE CATHETER. (7)SUITABILITY AS PER ISO OR BIS OR FDA OR CE OR CDSCO APPROVAL.]
MLA-ADS -2024-25 - THRIPPUNITHURA LAC - SITC OF 2 NOS OF 8 MTR MINI MAST WITH 5 X 150 W LED FLOOD LIGHTS AND 2 NOS OF 10 MTR HIGH MAST WITH 6 X 200 W LED FLOOD LIGHTS AT VARIOUS LOCATIONS IN COCHIN CORPORATION IN THRIPPUNITHURA LAC, ERNAKULAM DISTRIC
Replacement of the damaged Valves and watermeter with rectifying the blockage in the distribution line.maintenance work of OHSR and new pipeline of suitable specification and supply.installation of a new energy-efficent pump set including testing and
Supply of Furniture Items
GENERAL-IIP-Replacement of damaged Karukutty Karayamparambu branch canal shutters and cross regulator shutters at ch.0/000km and Baslahem Shutter at Ch.1/200 km. - General Mechanical Work
Oand MWater Supply SchemesWSSTo N ParavurMunicipality and Adjoining Panchayath Supply of spare parts and rectify oil leak from pushings by changign gaskets and oil seals of 630 KVA 11KV433V outdoor transformer at North Paravur PH General Civil
Fabricating and supplying cylindrical shape , mild steel barrel wi t h FR P l i n i n g of diameter 1250 mm and height 1250mm made of 304 grade mild steel
Project number 252 26 253 26 and 254 23 Mararikulam North Grama Panchayath.-Providing water connection t o W a t e r A T M a t w a r d n o 1 2 3 4 7 8 9 11 12 13 14 15 16 17 Pipeline work
GENERAL- Kodakara Branch Canal- Fabrication, Painting and Erection of new MS shutter at RBMC Ch.31/850Km.-General Mechanical Work
DEPOSIT-Deposit work -Karalam Gramapanchayat-Fabrication of shutter with hoisting arrangement in Vilangan thodu (Pottakkulam) in Ward No.6 of Karalam Gramapanchayat-General Mechanical Work-1
OandM WaterSupply Schemes W S S To N Paravur Municipalityand adjoing panchayath Supply of spare parts and rectify oil leak from bushings by changing gaskets and oil seals of 250 KVA 11KV 433 V outdoor transformer at North Paravur Pump House
Certain repairs to rigid pavement hard standing painting Joint filling etc in tech area under 17 FBSU AF
Supply and Installation of All In One PC
FABRICATION, SUPPLY AND INSTALLATION OF 20MT SULPHURIC ACID STORAGE TANK FOR SKIM COAGULATION SECTION AT PCK LATEX FACTORY, KODUMON
O and M - Water Supply Schemes-CWSS to Kizhakkanmala - Perumkadavila Panchayath, Zone 1 for Marayamuttom and Kodithookkimala-Rectification of Leakages in various pipe line and allied works for one year 2026-27-Pipeline Work
O and M - Water Supply Schemes-UWSS to Neyyattinkara - Central and Amaravila zone-Rectification of leakages of Various pipe lines and allied works for one year 2026-27- Pipeline Work
PROVISION OF IRON GRILL DOORS AND VIEW CUTTER AT BOUNDARY WALL OF 14 ASC AF
Hiring a Taxi jeep or equivalent vehicle (below 1500 CC) less than 15 years old, with experienced driver, fuel etc for the use of Electrical section Manappally for one year (1750 km/month).
E-Tender for the Supply of furniture , Electrical Items at Alappuzha
RETENDER FOR SUPPLY INSTALLATION COMMISSIONING AND VALIDATION OF MICROBIAL AIR SAMPLER
Retender for Supply installation commissioning and validation of integrated ozone system
GENERAL-SR 2025-26 -Reconstruction of culvert at Old NH ch-1/200-General Civil Work
Proj. NO. 265/26-27 Street Light Maintenance
Coating works of Anode meshes (9 Nos.) of AGC Electrolyser
GENERALFDR 2025 26 Reconstruction of culvert and connected drain at ch1300 of old NH Construction of box culvert at ch 1300 at CherthalaGeneral Civil Work Re tende
Construction of Arch Gate Structure using ACP and Structural Steel and allied works at KINFRA Techno Industrial Park, Kakkanchery
Providing Air Conditioning facility for TSB and MSOB canteens at LPSC, Valiamala - Phase I
Titanium alloy flange forgings
Painting works at flow forming facility, MME and providing toughened glass door for Cryo store at LPSC Valiamala
Project No.S0320/26 Karingad Sub Centre Re wiring under Kavilumpara GP-Karingad Sub Centre Re wiring under Kavilumpara GP-General Electrical Work -(224)
Pot hole filling and Patch work of Main roads inside the CUSAT, Thrikkakara Campus
Reconstruction of road using paver blocks from the gate in front of the Photonics Department to the south end of the Electronics Department and the front area of SES Block III, CUSAT, Thrikkakara Campus.
GENERAL-S0329/26 Net Zero Carbon convert fan to BLDC at Kunduthode FHC-S0329/26 Net Zero Carbon convert fan to BLDC at Kunduthode FHC under Kavilumpara GP-General Electrical Work
Project No 324 Ward 14 Revovaion On the Front of Ganesapuram Mariyamman Kovil Road
PROJECT NO 318 WARD 12-Attappallam Ganapathy Temple Road Renovation
Project 311 WARD 12- Uppukuzhi Road Renovation
PROJECT NO 130 WARD 06-K N PUDUR ROAD RE -TARRING
PROJECT NO 117 WARD 10-PAMPUMPARA SIVASAKTHI ROAD RENOVATION
PR NO 116 WARD 11-POOLAMPARA VINAYAKA TEMPLE ROAD RENOVATION
PR NO 115 WARD 08 MALABAR GARDEN ROAD RE CONCRETE
PR NO 109 WARD 06 PUDUR RING ROAD RE TARRING