Loading…
Loading…
9,820 live7,724 closing this weekmost from Local Self Government Department and PWD
9,820 results • Latest
CONSTRUCTION OF BUILDING FOR ANGANAWADI AT BALATHIL AREA
MLA-SDF-Kuthuparamba BP-MLA SDF 2024-25 Smt Shylaja Teacher Honble MLAChittaripramba Jawahar Lal Nehru Library New building Construction Chittariparamba GP
COMPREHENSIVE MAINT REPAIR REPLACEMENT OF INTERNAL WIRING ELECTRICAL FITTINGS AND FIXTURES DBs AND MCBs FANS AND ALLIED WORKS IN C D E AND F AREA AT NAVAL BASE KOCHI UNDER GE NW KOCHI
GENERAL-Dam Safety- Repair and maintenance work of spillway shutter no.1 at Pothundy dam-Rewinding of Hoist motor and associated works of spillway shutter No. 1 at Pothundy dam-General Mechanical Work
CIVIL WORK- ROAD
GENERAL-DAM SAFETY MOOLATHARA REGULATOR-Annunal Mechanical maintenance of Moolathara regulator -General Mechanical Work
REPAIRS TO ROAD POT HOLES PAVER BLOCKS ROAD MARKING AND ROAD FURNITURE AT G AND H AREA AT NAVAL BASE KOCHI UNDER GE NW KOCHI
Supply and Installation of Token Kiosk with CPU and Video Wall
Design Fabrication Supply Erection And Commissioning of 1.5 Lit Capacity Mixer Settlers 09 Nos
Customized human rated climate simulation apparatus with CO2 control
STATE SPORTS MEET 2026 LIGHT AND SOUND
GENERAL Improvement to Uchakkada Payattuvila Nellimoodu Road KM 0000 to 3350 by providing BM BC Balance work and KWA JJM Deposit Urgent Restoration Work in Uchakkada Payattuvila Nellimoodu Road From Ch 0 200 to ch 3300 Improvement to Uchakkada
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 10 METERMINIMAST WITH 06 NOS OF 150W LED FLOOD LIGHT
Retender for for the supply of 8 mm dia continuous cast copper rod (Std) conforming to IS 12444/IEC 28 to our Thalasssery unit
Supply Installation Commissioning and Maintenance of IP based CCTV Surveillance cameras at Alanallur G P
provision for dismantling of existing retaining wall ,Earth work excavation,PCC,DR masonry, GSB ,Provision of interlocking tile on road for 20 m in the curve.
ADDN / ALTN AND REPAIR/ REPLACEMENT, SEPARATION OF EXISTING SEWAGE AND WATER SUPPLY PIPE LINE IN VARIOUS LOCATIONS AT PANGODE MIL STN UNDER GE (ARMY) TRIVANDRUM
PROVN OF HARD STANDING WITH INTERLOCKING TILES FOR VEH PARKING NEAR MT GARAGE OF BLDG NO P-391 AND P-392 OF 91 INF BDE CAMP AND PROVN OF 12 X 1.5 TON AC FOR VARIOUS WARDS AT BLDG NO P-290 OF MH AT PMS UNDER GE (ARMY) TRIVANDRUM
GENERAL-RM 2025-26 Cluster 1-One year running contract for various PWD roads under road section Mavelikkara - Zone 2 in Alappuzha District 3 road stretches for a total length of 9.40 km -General Civil Work
Annual Plan-ATTAPPADY BLOCK PANCHAYAT Pro No. 28/26-27 MELE KARUVAARA UNNATHI RENOVATION -General Civil Work
Annual Plan-ATTAPPADI BLOCK PANCHAYATH- 2026-27-PRO. 24/2026-27 BODICHALA UNNATHI SIDE KETTU-2026-27-AGALI GP-General Civil Work
Annual Plan-ATTAPPADY BLOCK PANCHAYATH 2026-27-PRO.No.115/26-27 NELLIPPATHI LAKSHAM VEEDU PRADESAM KUDIVELLA PADHATHI PIPELINE NEETAL MOTTOR PURA- 2026-27- AGALI -GP-General Civil Work
Annual Plan-ATTAPPADI BLOCK PANCHAYAT-2026-27-KALLAKKARA UNNATHI NAVEEKARANAM-(PRO-N0 -37/26-27)-2026-27-SHOLAYUR-SHOLAYUR -GP-General Civil Work
Annual Plan-ATTAPPADY BLOCK PANCHAYATH- 2026-27-PRO-26-KATHIRAMPATHI UNNATHI INTERLOCK-2026-27 AGALI- GP-General Civil Work
GOURI VILASAM SCHOOL TO THEKKETTIL ROAD RENNOVATION
Annual Plan-ATAPPADI BLOCK PANCHAYATH-2026-27-CHUNDAKKULAM UNNATHI NAVEEKARANAM-(PRO-NO 23/26-27)-SHOLAYUR-GP-General Civil Work
KOTTARATHIL TO METHALE PARAMBATH ROAD RE TARRING
Procurement of Sports Equipments - General Equipments of 6th Students for G V Raja Sports School Kannur Sports School
Installing a fully Digital IPBX Intercom System for City Police Office, Thiruvananthapuram City
MAHATHMA GANDHI ROAD RE TARRING
GENERAL-Electrical lab PolyTechnic-Balance Work -Deposit work-General Civil Work
Annual Plan-PKD BP 70/2026-27- KALLAYAM SC COMMUNITY HALL R E N O V A T I O N I N SREEMOOLANAGARAM
KRISHIBHAVAN ROAD RE TARRING
Fabrication ,Supply ,Installation and Commissioning of 5 m3 SS 316 Tank
Renovation works to Palayad L P Karuvancheri Cheriya Vayaram vally Road Third phase in ward 18 P 291 25-26
Komath mukk - Thayyullathil mukk Road in Ward 13-Project No 310 2026-27
Construction of Thadathil mukk - Puthiya Paramath road ward 12-Project No 304 26-27
(Re-Tender)UPPAMTHODI KULAMULLATHIL MUKKU ROAD IN WARD 22
(Re-Tender)MANTHARATHUR PAZHAYA DISPENSORY PAREMMAL PALLI THAYYULLATHIL MUKKU ROAD IN WARD 5
RENOVATION WORKS TO THADATHIL MEETHAL MUKKU EDANGOOLIL MUKKU ROAD IN WARD 11
(Re-Tender)VAAYANASALAMUKK BAJANAMADAM ROAD IN WARD 4
Puthan nada cheerpp Mandalamgodu road in ward 23-Project No 286 2026-27
(Re-Tender)PALAYADNADA KOTTARATTHIL MUKKU ROAD IN WARD 20
(Re-Tender)KOKKALIDATHIL MUKKU CHEYAKKANDI MUKKU ROAD WARD 8