Loading…
Loading…
6,059 live3,812 closing this weekmost from Department of Local Government and Department of Water Resources
6,059 results • Latest
AR and MO to GPOA Office Building at Jalandhar during 2026 27. SH Providing Services of Sweeping Scavenging and Watch and Ward for Office Premises of Kendriya Sadan Surya Enclave Jalandhar
EDL medicines
P/L RCC PIPENP 2 NEHRA HOUSE TO BHAGWAN DODHI PREET HOUSE
Roof repair work at Markfed godowns Moonk, Distt. Sangrur.
Repair of Markfed godown at Ghanaur, Distt. Patiala.
Special Repair of Link Road Ablu to Kotli Near Water Works Ablu
New construction of ladies and gents washroom at Mansa Bareta Markfed godowns .
Repair of DM office Nawanshar Distt. SBS Nagar.
Repair work at Markfed godowns, Sherpur Distt. Sangrur.
Repair work at MRM godowns, Goniana Distt. Bathinda.
Development of Play Ground at Village Rattowal Block Sudhar Distt Ludhiana
Repair and renovation of security Hut at D.M. office, Distt. Ludhiana.
Repair of Weavco office building at 100ft road, Distt. Amritsar.
Third Party Audit of the bills produced by Concessionaire E-smart Energy Solution Limited
Estimate for Lining of Watercourse of O/L RD 43410/L of Mamdot Disty by laying underground Pipeline of 505 M Length of Village- Jodhpur, District- Ferozepur
Estimate for Lining of Water Course of O/L RD 30600 L of Nizamwah Disty Branch D1/1/1, D1/1/1/2, D1/1/1/3-D1/1/1 /6 of Village - Mothanwala and Jandwala, Distt- Ferozepur (540 M Length)
THE CONSTRUCTION OF FENCING OF POND NO 1 AT VILLAGE ALAMGIR BLOCK DEHLON DISTRICT LUDHIANA
UPGRADATION WORK OF AROUND FLAG NEAR DUSHERA GROUND
CONSTRUCTION OF HERITAGE GATES 1 NOS IN LIMIT OF MC MACHIWARA
DEVELEOPMENT OF PARK IN FRONT OF LUCKY BEAUTY PARLOUR IN WD NO 10
Development of park baba moti ram mehra park mc machiwara
PL RCC PIPE 10 DIA KHOSLA DOCTOR TO SETHI SHOP MC MACCHIWARA
P/L RCC PIPE NP 2 CHAMAN HOUSE TO MOHAN LAL SHOP KOHARA ROAD
Rubberization at 21 Nos. Level crossing in the section of SSE/P.Way/NRO under ADEN/JRC i.c.w rubberization at 76 Nos. Level Crossing in the section of Sr DEN- III/FZR.
Augmentation of WSS, Salarpur Block Jalandhar East District Jalandhar
Construction of boundary wall at shaheed bhagat singh park
Renovation of dr ambedkar chowk
Provision of Rubberized at 37 level crossing in the Jurisdiction of Sr DEN-I/FZR.
REPAIR OF ROOFS, STAIRCASES AND PAINT WORK IN SEVEN STOREY AND DOUBLE STOREY JUDICIAL COURT COMPLEX IN DAC LUDHIANA
Const. of Rooms at Govt. School village Chak Pandian (Siri Pandian), Block Talwara, Distt. Hoshiarpur. (MP Lad)
THE CONSTRUCTION OF 3 SWM UNITS TO PREVENT PLASTIC BAGS AND BOTTLES FROM BLOCING THE PONDS AT SOILD WASTE UNIT AT VILLAGE ALAMGIR BLOCK DEHLON DISTRICT LUDHIANA
THE RENOVATION OF POND NO 5AT VILLAGE ALAMGIR BLOCK DEHLON DISTRICT LUDHIANA
Estimate for Relining/Reconstruction of Water Courses of outlet RD 27000/R Barkatwah Minor Village bamni wala.
Misc P.way works & Rag picking work in Yards and block section in the section of SSE/P.way/LDH under ADEN/LDH.
Provision of Relay Hut at (6 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) under SSE/W/NRO in the jurisdiction of Sr.DEN-I/FZR as per Type Plan No. HQ/01/02-2017/R-1
COVERED ELECTRODE FOR MANNUAL ARC WELDING SIZE 3.15X350MM,
Estimate for Restoration/Permanent Plugging of breached Lining Portion of Ladhuka Distributory.
Provision of Relay Hut at (7 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) in the section of SSE/W/NRO as per Type Plan No. NRHQ Plan No. 0-97/2017/R1
4. Balance Work of Fatehgarh Sahib Bus Stand
Drilling Installation and commissioning of 150mm i/d 145 mtr Depth MS T/well, Const. of Pump Chamber 2.50 X2.50 mtr with WC, 1 No. RCC OHSR 25000 Itrs capacity, P/f Pumping Machinery Development of W.w and Distribution system Complete in all respect
2. Const. of Anganwadi room and toilet at Talania
3. Renovation of Anganwadi Ramdas Nagar ward no.7