Loading…
Loading…
4,999 results • Latest
VH Facade (G plus7 Storey) Repair of window glazing joints by replacing gaskets and filling sealant in windows
Construction of Labour Shed at Lobour Union Dhuri District Sangrur.
SW.I- Ia) MAS-AJJ section- TTR(TWS+WCMSC)- 1 in 8.5- 2 sets. Ib)MAS-AJJ section- TTR(FS+TWS+WCMSC)- 1 in 12- 11 sets MAS AJJ section- TTR(TWS+WCMSC)- 1 in 12- 13 sets . Ic) MAS-AJJ: TTR- DS (60 kg/ PSC) 1 in 8.5.-4 sets. Id(i&ii)MAS-AJJ section- TTR (Switch & Xing sleepers-30 sets) ( 1 in 12 - 30 sets). Ie (i&ii) MAS-AJJ section- TTR (Switch & Xing sleepers-4 sets) ( 1 in 8.5 - 4 sets). If) TTR Allied works. SW.II- MAS AJJ section: TTR (CS+CMSC) 1 in 8.5 -5sets TTR(CS+CMSC)- 1 in 12- 12 sets; TTR- DS (60 kg/ PSC) 1 in 8.5.-4 sets. SW III- MAS-AJJ section: DEN/C Jurisdiction TFR(Plaintrack)-15.900km, TFR (Turnouts) -10sets,TBR(Plaintrack) - 5.00 km in various yards. SW IV - Sr.DEN/Central/MAS Jurisdiction:-Renewal of TW SEJ -82 sets & Renewal of Glued Joints with 60 kg Glued Joints - 465 sets.
PROVN OF RAIN WATER HARVESTING AT NORTH COLONY, PROVN OF RECHARGE PIT AND DRAIN AT REAR SIDE OF BLDG NO. NP-08 AND ADDN/ALTN TO RECHARGE PIT AND DRAIN AT JAGDISH VIHAR IN AOR OF AGE BR-II UNDER GE(WEST)PATHANKOT
ADDN/ALTN TO DRAIN AND RAIN WATER HARVESTING PIT AT MANDIR AREA ANDADDN/ALTN TO RECHARGE PIT AND DRAIN AT MANIKSHOW COLONY IN AOR OF AGE BR-I UNDER GE(WEST)PATHANKOT
S&T work in c/w (1) Repl. of steel girder with RCC slab of Bridge No.102 UP&DN, 111 UP&DN, 119 UP on JUC-ASR sec., B.no.180 on ASR-ATT & br. no.103 on VKA- DBNK section. (ii) Construction of LHS of internal size 5 m X 3.5 m LHS in lieu of LC C-7 at KM 4/13-14 on JUC-NRO section under ADEN-JUC over firozpur division. (iii) Construction of LHS of internal size 5.0 X 5.0m at manned L-xings No.A-5 on VKA- DBNK section by pushing method in the section under ADEN-I/ASR. (iv) Construction of RCC box (2 nos. twin boxes) bridge in lieu of steel trough bridge no.158 in PHR-LNK section.