Loading…
Loading…
4,738 results • Latest
Laying of 110mm dia HDPE pipeline from Durshed old SC Hostel to ZP school road at Durshed in div no.4 of MCK Est. cost of Rs. 1.85 Lakhs under 15th FC (Reserved for SC Societies/Individuals)
Laying of CC road and SWG piped drainage from H.No.3-4-90 to 3-4-96 and 3-3-152 to 3-3-156/2 at Sawaran street in Div No.52 of MCK Est. cost of Rs. 5.00 Lakhs under MGF (Reserved for SC Societies/Individuals)
PROCUREMENT OF THRUST BEARING HOUSING AND PROCUREMENT OF THRUST BEARING HOUSING AND SPARES OF MILL GEARBOX IN ST2 and 3 NTPC RAMAGUNDAM
Laying of RCC drainage pipeline and CC road from H.No.2-6-173/A to Laxmi Towers in Div No.58 of MCK Est. cost of Rs. 34.10 Lakhs under MGF (Reserved for ST Societies/Individuals)
Construction of CC drain and RCC drainage pipeline exist drain to Raw sewage wet well cum pump house in STP premises in Div No.7 of MCK Est. cost of Rs. 4.70 Lakhs under MGF
Laying of 300mm dia RCC NP3 pipe drain and laying of CC road from Advika Paradise to 10-2-388/A, 10-2-387/3/A/1 to 10-2-388/A and 15-4-65/5/1/A/2/A/ to 10-2-389/B Sri Ramnagar road no.5 link road and Laying of CC road from H.No.10-2-553/3 to 10-2-519/A in Div No.21 of MCK Est. cost of Rs. 45.00 Lakhs under MGF
Laying of 300mm dia RCC NP3 pipe from H.No.15-8-1/4/4/A/1 to 9-25/4/A/1 at Eye Hospital road in Div No.20 of MCK Est. cost of Rs. 41.00 Lakhs under MGF
Construction of RCC drain and Slab culvert panchajanya Apartment to Ramanjaneya Saw mill and Timber depot and Transformer No.SS/19 at Theegalaguttapalli (Opp) Kondanda Ramalayam in Div No.3 Est. cost of Rs. 37.00 Lakhs under MGF
Laying of CC road and Constrcution of drainage from Gopu Malla reddy House Mahender House at Alugunur in Div No.8 of MCK Est. cost of Rs. 15.40 Lakhs under MGF
Laying of 300mm dia RCC NP3 pipe and laying of CC road from H.No.15-5-72/1/A to 15-5-638/284 in Div No.20 of MCK Est. cost of Rs. 6.40 Lakhs under MGF (Reserved for SC Societies/Individuals)
Laying of 300mm dia RCC NP3 pipe and laying of CC road from H.No.5-74 to 6-2/2 and 15-5-63/2/4 and 6-20/2 to 7-866/2/A/1 in Div No.20 of MCK Est. cost of Rs. 22.20 Lakhs under MGF
Laying of SWG drain pipeline and CC road from H.No.2-34/A/1 to beside Kashetti Srinivas (H) at Theegalaguttapalli in Div No.2 of MCK Est. cost of Rs. 11.90 Lakhs under MGF
Reconstruction / Renovation of Sri Ramalingeshwara Swamy Temple, Lingagiri (V), Huzurnagar (M), Suryapet District
Construction of RCC slab culvert and drain from existing CC drain to H.No.13-1-96/A/1 at Kodanda Ramalayam in Div No.2 of MCK Est. cost of Rs. 13.20 Lakhs under MGF
Development and Maintenance of Landscape Greenery work at IDOC Kongarakalan, Ranga Reddy District
Laying of CC road from H.No.4-100055 to 4-75/2A, 4-78/9/A/1 to 4-76/11/3/1 and 4-75/1 to 4-78/9/A/1 at Saraswathinagar road no.1/A arepalli in Div No.1 of MCK Est. 27.00 Lakhs under MGF
Construction of CC drain from Siricilla Srinivas House to R and B Culvert and H.No.5-100/47/A/1 to warangal road at Bhavaninagar at Alugunur in Div No.8 of MCK Est. cost of Rs. 19.40 Lakhs under MGF
Laying of RCC pipeline and CC road from Chindam Kanakaiah House to Nampally Anil Kumar at Alugunur in Div No.8 of MCK Est. cost of Rs. 15.20 Lakhs under MGF
Laying of SWG 200mm dia drain pipe line and laying of CC road from H.No.3-3-174/2 to thirupathi reddy Hospital and H.No.3-3-179/A to Bharathi Nilayam at Sawaran street in Div No.52 of MCK Est. cost of Rs. 4.99 Lakhs under MGF
Laying of CC road from H.No.11-2-100067 to 11-2-107/9/2/2 and 11-2-111/1 to 11-2-126 at Sai balajinagar, seethrampur in Div no.21 (old) of mck Est. cost of Rs. 36.00 Lakhs under MGF
Balance work of laying of BT Road from Gayatri cold storage to SVM school road in Khammam Municipal Corporation
Layng of CC road from Hanuman temple to railway track near Hanumannagar junction at arepalli in Div No.1 of MCK Est. cost of Rs. 15.00 Lakhs under MGF
Laying of CC road from H.No.15-4-65/3/7/1 to15-4-57/1/1 in Div No.20 of MCK Est. cost of Rs. 27.70 Lakhs under MGF
Laying of SWG drainage pipeline and CC road from H.No.6-6-152 to 6-6-152/1 in Div No.53 of MCK Est. cost of Rs. 1.80 Lakhs under MGF
Laying of 160mm dia HDPE pipeline from H.No.6-2-428 to 6-2-401 and various places in Div No.32 of MCK Est. cost of Rs. 5.85 Lakhs under 15th FC
Hyderabad Division: Improvements to old structures and offices in Mazdoor Union Office Premises under Jurisdiction of SSE/W/GOC - Electrical Arrangements
Construction of VRCC drain and RCC slab culvert and laying of CC road from Opp. H.No.10-4-93/1 to 10-4-90 (near bank colony road no.7) at vavilalapalli in Div No.24 of MCK Est. cost of Rs. 5.85 Lakhs under MGF (Reserved for Waddera/Sagara Societies/Individuals)
Construction of Kalyana Mandapam to Sri Santhana Venugopala Swamy Temple, Kalvacharla (V), Ramagiri (M), Peddapalli District
Supply of 6F, 12F and 24F OFC as per SOR and Technical specifications.
Repairing of damaged RCC Slab culvert from Padmavathi Kalyana Mandapam, Telangana Grameena Bank, Mankamma thota Opp Venkateswarlu temple of MCK Est. cost of Rs. 2.20 Lakhs under MGF
Construction of CC drain and formation road from H.No.7-101/13/1/1/A to Opp. 12-25/5 at Indiramma colony in div no.20 Est. cost of Rs. 7.00 Lakhs under MGF
Hyderabad Division: 1) Construction of Staff Quarters 11 nos. (Type II - 8 Nos, Type III- 2 Nos, Type IV - 1 Nos) for Tr.D at KMC- Electrical Arrangements 2) Construction of Tower Car Shed for Tr.D at UMRI- Electrical Arrangements
Laying of 250mm dia HDPE pipe line from Anarkali Mahemoodiya Masjid to near Godam and laying of 200mm dia HDPE pipe line from near godam to maheboob colony road no.3 and laying of 160mm dia HDPE pipeline (Parrala line) from Anarkali Fashion House (Near Mahemoodiya Masjid (RandB main road)) in Div No.32,33 and 34 of MCK Est. cost of Rs. 45.00 Lakhs under 15th FC
Laying of RCC NP3 300mm dia drain pipeline from Telangana minorities residential Girls-1 school to H.No.4-56/11 (near sairam Kiranam and General store) at rekurthi in div no.19 of MCK Est. cost of Rs. 2.60 Lakhs under MGF
Laying of RCC NP3 300mm dia drain pipeline from Sudhagoni Krishna goud (old) House backside to EP No.G/12/4R at rekurthi in div no.18 (Old) of MCK Est. cost of Rs. 3.50 Lakhs under MGF
Hyderabad Division: 1) Proposed Construction of New RPSF SO's Barrack with 50 Bed Capacity (G+1) at 7/BN/MLY- Electrical arrangements 2) Construction of Running Room 28 Beds Capacity at KRNT- Electrical arrangements
Laying of CC road from H.No.2-56/3/A/1 to 13-2-56/2/3/A/1 at (Elite Homes) Theegalaguttapalli in Div No.2 of MCK Est. cost of Rs. 18.40 Lakhs under MGF
Laying of SWG drain and CC road widening from H.No.9-4-247 to 9-4-252 and 9-4-254/2 to 9-4-256 to 9-4-263 and near Sapthagiri Tent House beside lane at Sapthagiri Colony in Div no.44 of MCK Est. cost of Rs. 15.00 Lakhs under MGF
BMD-Availing the services to carry out various Non-destructive examinations (NDE) in 1X500MW boiler during upcoming capital overhauls 2026-27
Laying of 300mm dia RCC NP3 pipe and laying of CC road from H.No.9-6-56/B to 9-6-56 beside Krishnaveni Talent school road and 9-6-62/A/1 to 9-6-56 in Div No.46 of MCK Est. cost of Rs. 13.70 Lakhs under MGF (Reserved for ST Societies/Individuals)
Design, manufacture, supply, installation, testing, commissioning and maintenance of heavy duty elevator of machine room less and gearless type 13 no. passenger capacity with a speed of 1.0 m/s. center opening/telescopic(as per site condition) sliding door double door type with three stops and three openings as per RDSO specification no: RDSO/2013/EM/SPEC/0016 (Rev-2) - 2025 or latest with a warranty of two years and comprehensive annual maintenance contract for a period of 10 years after completion of warranty period of two years(Rate for comprehensive annual maintenance contract shall be quoted separately). The elevator shall be with lift working/failure information through GPRS enabled SMS alert system CCTV inside the lift car connecting to security systems through wireless/wifi and audio announcement features. The elevator shall be suitable to be continued to IR- NIYANTRAC software (Web based lift monitoring system). Warranty- 2 years after successful commissioning and acceptance of the elevators.
MFT_SUR_(PH NO.:305170) LYOPHILISED STOCK CULTURE OF CANDIDA PARAPSILOSIS ATCC NUMBER 22019,PACK OF TWO STICKS
Design, manufacture, supply, installation, testing, commissioning and maintenance of heavy duty elevator of machine room less and gear less type 06 No. passenger capacity SS CABIN AND SS automatic doors lift (G+2) floors with a speed of 1.0 m/s. Telescopic opening door type with Three stops and Three openings
Supply of Butterfly Valve with Limit Switch
Hyderabad Division: 1) Proposed Construction of new GYM with the PEB structure of size 32x25mm at RSC/SC- Electrical arrangements 2) Construction of indoor volleyball court at RSC/SC- Electrical arrangements 3) Repairs to ground floor, renovation of toilets in first floor room, demolition of kitchen area and construction of new hostel building in Annapurna hostel at RSC ground- Electrical arrangements
MFT_SUR_(PH NO.:305163) LYOPHILISED STOCK CULTURE OF ENTEROCOCCUS FAECALIS ATCC NUMBER 29212,PACK OF TWO STICKS
BORING HEAD AND SPARES of Ms D ANDREA
Providing of sweeping services through hiring of compact heavy duty vaccum sweepers with single engine (self-propelled machines) with atleast 5 cum hopper capacity for period of 06 months for the year 2026-27 in Miyapur Circle-48, SLP Zone, CMC
Collection, transportation, Treatment and Safe Disposal of Bio Medical Waste.
Procurement of Medicines