Loading…
Loading…
7,272 results • Latest
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- III (Three). (Road to be repaired from Ch. 3.00 km to 4.50 km..
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- II (Two). (Road to be repaired from Ch. 1.50 km to 3.00 km ..
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- I (One). (Road to be repaired at Ch. from 0.00 km to 1.50 km..
Development of road from Ranirbazar cattle market to PHC chowmuhani (Total length - 0.81 Km) under 10-Majlishpur Assembly Constituency SH Grouting, metalling , re-carpetting, seal coat..(L 0.40 km, from Ch.0.00 km to Ch.0.40 km) (Gr-I)
Development of road from Subalsing to Lewang bazar at ch 3.00 km from massive erosion of local cherra due to flood during the year 2026-2027/SH- Manufacturing and placing of cement concrete block and procurement of flood flighting materials and emer
Providing Installation and commissioning of Split type High wall Air Conditioning Machines and repairing Maintenance of existing AirConditioning Machines at RIPSAT Agartala during the year of 202425
Development of different roads required prior to durga puja during the year 2026-27/SH- Clearing jungle, brick soling, earth filling, brick bats, bamboo palasiding, patch repairing, surface drain, placing of gunny bag etc Gr-I
Providing installation and commissioning of Fire Fighting system in the newly constructed Community Health Centre CHC Jirania under West Tripura District
Development of road from Panchabati to natunbazar (Length-2.0km) during the year 2026-27/SH- Return wall, brick soling, WBM-III, carpeting, drain etc.
Supply of Horizontal Distillation Apparatus for Chemical testing of water sample at Sub-Divisional Laboratory under DWS Sub-Division Kanchanpur during the year 2026-27.(2nd Call).
Construction of Fountain Base of Rabindrakanan Park, Agartala.
Development of different roads required prior to durga puja during the year 2026-27/SH- Clearing Jungle, brick soling, earth filling, brick bats bamboo palasiding, patch repairing, surface drain, placing of gunny bag etc. Gr-II
Sal Ballies post, Gabian structure, flat brick soling, Metalling etc.
Construction of Front gate Bike shed and Car shed for Panisagar Sub Divisional Hospital under RD Panisagar Sub Division during the year 2025 26
SH Patch Soling WBM Carpeting Seal coat pucca drain and other allied works
Repair/Maintenance/ Installation of New Pump Motor at all the Pump Houses at 79 Tilla Qtr. Complex of AGMC and GBP Hospital during the year 2026 -2027(2nd Call).
Construction of 08 (eight) nos. drinking water tanker filling points in identified stress pocket areas under Manu RD Block. (Group-I) (2nd Call)
Custom Bid for Services - Hiring of Services of accredited Consultant for obtaining Environment Clearance for Conversion of 16 Exploratory wells to Development wells falling in 6 PML blocks in Sepahijala, West Tripura, South Tripura and Gomati distri.. Similar Category CSR Project Monitoring, Evaluation and Impact Assessment Service
Development of road from Shalbagan Bazar to CPWD office gate during the year 2026-27/SH- Grouting, Carpeting, Seal Coat etc.(L-0.785km)
SH Patch WBM Grouting Recarpeting and allied works
De-Launching of Baileys Bridge, Dismantling of existing Abutments, Re-Construction of Abutments, Re-launching of Baileys Bridge and Protection and approach works etc
Supply of 7 cm above Major carp fingerlings to the different gram Panchayets/ADC Villages, Nagar Panchayet of Panisagar Sub Division, North Tripura for implementation of different Pisciculture schemes like MMMBY, PMMSY,Others FY 2026-27
Supply of 10 cm above Major carp fingerlings to the different gram Panchayet/ADC villages, Nagar Panchayet of Panisagar Sub Division, North Tripura for implementation of different Pisciculture schemes like MMMBY, PMMSY, others FY 2026-27
SH Patch WBM Grouting Recarpeting and allied works
SH- Additional Works including False Ceiling, ACP Board installation on Grand Stand, Painting, Railing of Gallery, and Approach Road Development etc.
SH- Additional Works including Construction of Toilet Block, Development of Parking Area with Paver Blocks and Allied Works etc.
Beautification of Kgt MC area by constructing of 1 no. entry gate at 91-Mile near Kgt Petrol Pump at ward No 8 and 1 no gate near Holycross school at ward 13 and city corner point at Bhagat Singh Chou. by constructing paver block footpath infront of
SH- Additional Works including Development of the Front Portion of Stadium with Paver Blocks, Construction of Volleyball Ground and Allied Works etc.
Construction of CC road on existing brick soling along with drain and RCC Retaining wall from U/S road to Milan Nag house via Samarendra Dey house at Fulkumari GP under Matabari R.D.Block.
Hiring of one vehicle having commercial registration/ permit for official use at O/o the Superintendent of Fisheries, Bishalgarh Subdivision
Construction of EMRS Building with Unit Boys Hostel, 1 Unit Girls Hostel, 2 Unit Warden residence, 1 No. Principal Residence, Transit Qtrs including internal water supply and sanitary installations, electrical installations, drainage and development of site for EMRS at Kills, Dist- Gomoti, State- Tripura. (Phase-II). (SH: Providing 1 No. skilled staff (DG operator) for CPWD Complex, Usha Bazar)
Construction of open shed near AWC at Kunjaban, Udaipur, Gomati District.
PM-JANMAN works
Installation of CCTV And PA System (20 nos Speakers) at Sonamura English Medium School under RD Sonamura Division during the year 2026-27
Construction of open shed at Kunjaban near Subhas Samajik Sanstha , Udaipur, Gomati District.
Construction of Open shed at Buradighir Par at Matabari GP under Matabari R D Block during the year 2026-27.
Construction of RCC cover drain from Anil Debnath shop to Jagabandhu Das shop under Gamaria VC under Matabari RD Block during the year 2025-26.
Repairs and Maintenance of different units of Type-IV quarter at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Construction of Phase-III project works (Part-I) at Tripura University, Suryamaninagar, Agartala. SH: Construction of 36 Nos. Residential quarters (24 Nos. Type-III (G plus 5) and 12 Nos. T-IV (S plus 6)) including internal water supply, sanitary installation, drainage and internal electrical installation. SW: Providing, installing, testing and commissioning of 10,000 LPH capacity Iron Removal Plant (IRP) at New Campus of Tripura University, Suryamaninagar, Agartala. (2nd Call)
Construction of resting room/MNCU facility at AGMC and GBP Hospital during the FY-2026-2027
Repairs and Maintenance of different units of Type-III quarter at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Supply of Hermetically sealed scroll compressor for Deep Freezer of LHB Hot Buffet car as per schedule of requirements
Repairs and Maintenance of different units of College building in FY 2026-27 under AGMC and GBP Hospital, Agartala
Repairs and Maintenance of different units of Non Teaching Staff Quarter Building and PG Family Quarter Building at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Repair and maintenance of windows and ventilators including fixing of grills at Old Building, Jayanti Block, SS Block and Auditorium within AGMC and GBP Hospital premises, Agartala.
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Repairing of existing Pump House and existing pipe line maintenance of hydrant point, with other allied works in different schemes under DWS Sub-Division, Kalyanpur (Gr.-II).
Please refer to DNIeT