Loading…
Loading…
7,317 results • Latest
Construction of Retaining Wall (Landslide Protection) around Kalyanpur Bazar and Office Complex under Kalyanpur RD Block, Khowai District (as per PWD SoR 2023).
Providing Internal Electrification work for 04Nos. HSC of Teliamura RD Block under R.D Teliamura Division(as per PWD SoR I/El- 2021) i) Uttar Pulinpur HSC ii) Khasiamangal HSC iii) Hadrai HSC iv) Tuichindrai HSC
Quarter maintenance and paver block road construction
Providing Internal Electrification work thereof (as per PWD SoR I/Electrification- 2021) for 02(two) nos new Panchayat Bhavan of Kalyanpur RD Block under R.D Teliamura Division namely at i. Madhya Kalyanpur GP ii. Amar Colony in Pramodnagar GP
Smooth functioning of Eye Operation Theatre at Teliamura Sub-Divisional Hospital under Khowai District (as per PWD SoR 2023).
PLEASE REFER TO DNIeT
Please REFER TO DNIeT
Please refer to DNIeT
Please refer to DNIeT
Internal electrification for proposed womens college at Nalchar under RD Sonamura Division, FY 2025-26
Annual Maintenance of Street light Internal electrification works at Bodhjungnagar Rk Nagar Badharghat Dukli Industrial Estate
Please refer to DNIeT
Please refer to DNIeT
Setting up of new ITI Nalkata Pecharthal SH Construction and maintenance of Temporary Arrangement at Nalkata High School Pecharthal Unakoti District 2nd Call
Semi Digital Hearing Aid
Repairs and Maintenance of different units of Jayanti Block and Old Building at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027
Construction of 50 seated ST Girls hostel attached to Karbook Panjihum H.S. School under Dharti Aaba Janjatiya Gram Utkarsh AbhiyanDA-JGUA, Gomati District under RD Amarpur Divisionduring the Year F.Y.2026-27
Renovation of Comprehensive Lactation Management Centre at Gplus6 building of IGM Hospital, Agartala during the year 2026-27/ SH Aluminium works, Aluminium Composite Panels work, glass work, plumbing etc (2nd call).
Sinking of 1 No Small Bore Deep Tube Well along with pump set under DWS Sub Division No II Milonsangha Agartala
Flood fighting measure and flood damage protection under W.R. Sub-Division of Kumarghat Block during the year 2026 27 SH Emergency flood control work by sand cement block 1 8 Wire creates and Gunny bags filled with sand at different location 2nd Cal
Flood protection work near PWD Office at right bank of river Deo of Kumarghat Block during the year 2026 27 SH Bank revetment work by sand cement block 1 8 for a length of 80.00 mtr.2nd Call.
FDR Urgent Restoration of Flood damaged Embankment at Hurijala Darga tilla Ward No IV under Hurijala GP of Kakraban RD Block during the year 2026 27 SH Re construction of earthen Embankment in c Palasiding and Turfing with live sods etc L 60 00 m 2nd
Internal electrification for the work Construction of Type III quarter at Panisagar SDM office at Panisagar North Tripura Unit 4
HIRING OF 01 NUMBER VEHICLE, EECO NOT BEFORE THE MANUFATURE OF YEAR-2024 FOR THE USE OF THE S.D.O., IE SUB-DIVISION TELIAMURA, KHOWAI TRIPURA FOR THE YEAR 2026-27
MTC OF IE WORKS AT GONDATWISA PWD DIVISION OFFICE, CHAMBER OF AE(P) AND THE CHAMBER OF THE SDO, PWD (R AND B) GONDATWISA, DHALAI TRIPURA
Renovation of pump house SH Mtc of pump house of different M.I. schemes under Salema RD Block under W.R. Sub Division Kamalpur for the year 2026 27
PROTECTION WORK FOR EXISTING TEMPORARY STRUCTURE (PRESENTLYUSED AS SOS DINING HALL) AT SHQ BSF PANISAGAR UNDER SHQ BSF PANISAGAR
Procurement of Bricks for various works of Panisagar Jubarajnagar Kadamtala and Kalacherra RD Block under RD Dharmanagar Division during the year 2026 27
IMPROVEMENT OF EMERGENCY WARDROOM IN COMBINED HOSPITAL AT BN HQ PANISAGAR UNDER SHQ BSF PANISAGAR
Renovation/ Mtc. of Type-II (Quarter No-3 and 4), Technical Section Room and Other Works of Amarpur Division Office, Amarpur Division, PWD(RandB) at Amarpur, Gomati District during the year 2026-27./SH Dismantling Works, Plastering, Brick works, Roof
IMPROVEMENT OF TUBULAR STRUCTURES BARRACK UNDER OCCUPATION OF 199 BN BSF 9 USED AS SOS MESS ANNEXY) UNDER SHQ BSF PANISAGAR
Supply of Carbon Sliding Strip - Drawing No: SK 50000 as per RDSO Specification No.RDSO/2014/EL/SPEC/0114, Rev-0, dated May 2014. Make: SCHUNK or superior
WIRE ROPE SLING 6MMX2MX0.25M IS 2266, WIRE ROPE SLING 6MMX3MX0.33M IS 2266, WIRE ROPE SLING 8MM X 2 MX 0.25M IS 2266, SLING 8MM X 2.5METER SINGLE WIRE ROPE S*, WIRE ROPE SLING 8MMX8MX0.33M IS 2266, WIRE ROPE SLING 10MM X3MX0.33M IS 2266, SLING 1/2" X 2METER SINGLE WIRE ROPE SO*, SINGLE WIRE ROPE SLING 12MM 3M 6X37, SLING 1/2" X 5METER SINGLE WIRE ROPE SO*, SLING 12MM 6 MTR CHOKER SLING WIRE ROPE*, WIRE ROPE SLING 12 MMX (6X24) CORE 20', W/R SLING 12MMX10'/3T/4WAY/EXTRA 4RING, WIRE ROPE SLING 10 FT LONG 5 TON CAP 4*, FOUR WAY SLING ONE END RING & OTHER END*, WIRE ROPE SLING 14MMX6MX0.50M IS 2266, W/R SLING 14MMX10' WITH HARD EYE, FOUR WAY SLING ONE END RING OTHER END T*, WIRE ROPE SLING 16MMX10FT, SLING 16MM X 10' SINGLE WIRE ROPE HARD*, W/R SLING 16MMX17' WITH HARD EYE, WIRE ROPE SLING 16MMX(6X24) CORE 20 FT, SLING 16MM 7 METER SINGLE WIRE ROPE BOT*, WIRE ROPE SLING 16MM X 9M, 4 WAY SLING 16MM X (6X24) CORE 10 FEET, 4 WAY SLING 18MM X(6X24) CORE 10 FEET, SLING 16MM 5 METER 4 WAY WIRE ROPE MAIN*, FOUR WAY SLING ONE END RING OTHER THIMB*, FOUR WAY SLING WITH ONE END RING OTHER*, 4WAY SLING 20MM X (6X24) CORE 10'FT, SLING 19MM X 1METER SINGLE WIRE ROPE HA*, SLING 3/4" X 2METER SINGLE WIRE ROPE SO*, WIRE ROPE SLING DIA 19 MM X 2*, SLING 19MM X 10' SINGLE WIRE ROPE HARD*, WIRE ROPE SLING 19MM X 25FT, SLING 19MM X 30' SINGLE WIRE ROPE HARD*, WIRE ROPE SLING 19MMX41', W/R SLING 19MMX11M WITH 12" SOFT EYES*, WIRE ROPE SLING 19MMX22 MTR, 19MM TWO LEG SLING 5 TONE CAPACITY 1 ME*, SLING 19MM X 30' 2 WAY WIRE ROPE HARD E*, SLING 19MM X 12METER 2 WAY WIRE ROPE MA*, SLING 19MM 5 METER 4 WAY WIRE ROPE MAIN*, WIRE ROPE SLING 22MM(6X24) 10FT 3.2T SA*, WIRE ROPE SLING 10 FT LONG
HIGH PRESSURE GATE VALVE
Repair and Maintenance of temporary shed opposite Officers mess at Salbagan Campus FTR HQ BSF Tripura
Renovation/Upgradation of 13 Nos Jawan Barrack in AOR of 120 BN BSF (Now 42 Bn BSF) under SHQ BSF Gokulnagar
Construction of partition wall between DIG (Med) Office and Medical branch in ADM block at Salbagan Campus FTR HQ BSF Tripura
Renovation / Upgradation of 10 Nos Jawan Barrack in AOR of 130 BN (now 69 BN ) BSF under SHQ BSF Gokulnagar
Providing of BIS certification marked Alumino Ferriccarrying to SWTP and innovative Scheme including loading,unloading and stacking at site under DWS Sub-Division Damcherra.
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - As per Tender Document; As Per Tender Document; As Per Tender Document, Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant - As Per Tender Document; As Per Tender Document; As Per Tender Document
Entryand Mid Level Desktop Computer (Q2)
Setting up of new Agri. Development Research cum training Centre with IT facilities at Padmabil under Khowai Agri Sub-Division, Khowai Tripura. S.H Providing Internal Electrification.
SH - Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) (3 (3 ))
smart 2 pure water purification system
Custom Bid for Services - Hiring of a Petroleum and Natural Gas Regulatory Board (PNGRB)-empanelled Third-Party Inspection Agency (TPIA) for carrying out conformity assessment/audit of the Emergency Response and Disaster Management Plan (ERDMP) for .. Similar Category Hiring of Third-Party Inspection Agency
Construction Common Facility Centre on Bamboo based craft at Kathalia charra VC under Bokafa RD Block, RD Santirbazar Division (PWD SoR 2023)
Internal electrification for the work Construction of SH 01) Panchayet Bhawan at Algapur GP SH 02) Panchayet Bhawan at Hurua Shibnagar GP and SH 03) Health Sub Centre at Tarakpur under RD Dharmanagar Division