Loading…
Loading…
11,775 results • Latest
Additional work for construction of Boundary wall including land development and pathway at Khas Kajora OHR site of RCFA Part-II ZONE-12A water supply scheme under RCFA Division -I PHE Dte.
Different types of emergency maintenance work line laying, RCC stand post, Valve chamber and washout Drain construction and other allied works in different places of Ukhra and Sitalpur boosting site under Ukhra water supply scheme (Part-I) under RC
Laying of 90 mm dia HDPE pipe and 25 mm Dia PVC pipes at various areas of Manidanga and Muslimpara of Puchra GP under Barabani Block under RCFA Division-I PHE Dte.
Urgent road restoration work in front of Kanksa block development office quarter (30m x 6m)in T.C.pur GP and interconnection at Kanksa Zone-II C OHR site under Augmentation of Kanksa Zone-IIC within Kanksa Block under RCFA Division-I PHE Dte.
Additional work for construction of lateral supporting arrangement at Ajay Pally solar Krishnapur PWSS under RCFA Division-I PHE Dte.
Balance work of construction of Pedestral for resting DI pipeline along the NH allied works related to river bed tubewell at Ramnagar H/W site under under RCFA Division-I PHE Dte.
Additional pipeline with allied works at Ruidaspara, Majhipara, Muslimpara under Labnapara Durgapur Faridpur Block under Augmentation of Jamgora Jagannathpur under RCFA Division-I PHE Dte.
Emergency restoration of road at Ethora OHR command area including interconnection to Mahishmura village Salanpur Block under RCFA Division-I PHE Dte.
Additional work of urgent road restoration work 1877 meter in Bonkati GP (Banagram, Dakkhin Banpara Adibasipara, Kendanga Adibasi para) under augmentation of Banagram within Kanksa Block under RCFA Division-I PHE Dte
Balance work for restoration of roads at different areas of Itapara Gram Panchyat and adjoining areas under Barabani Block under RCFA Division-I PHE Dte.