Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
20 Jul 2026, 2:00 pmClosed
Executive Engineer
C.D. P.W.D. Kapkot
Reconstruction work (substructure and superstructure) of the footbridge completely damaged by the disaster at Tok Khaijar in village Paisari under SDRF 2025-26
2026_pwd_97328_1
1517/Nivida dated 06/07/2026
Open Tender
Civil Works - Bridges
Item Rate
60 days
Kapkot(Bageshwar)
2 documents required · 2 mandatory
₹4,720
Yes
Executive Engineer, C.D. P.W.D. Kapkot
₹2.4 L
Yes
9 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means | |||||
| 1.1 | Up to 3.0 M. | 106.61 | Cum | - | - |
| 1.2 | 3.0 to 6.0 M. | 106.61 | Cum | - | - |
| 1.3 | Above 6.0 M. | 17.48 | Cum | - | - |
| 2 | Plain cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M15 | 23.07 | Cum | - | - |
| 3 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC Grade M 25 Using Concrete Mixer | 29.42 | Cum | - | - |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications | 2.63 | Mt | - | - |
| 5 | Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 25 Using Concrete Mixer | 23.62 | Cum | - | - |
| 6 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 2.51 | Mt | - | - |
| 7 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 220 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Technicalbid.pdf
Tender Documents • 4.28 MB
BOQ_114953.xls
BOQ • 0.28 MB
coor.pdf
PDF • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .