Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹12.7 L (12.2%)Admitted-Finance | ₹1.2 Cr+₹12.7 L (12.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹16.1 L (15.5%)Admitted-Finance | ₹1.2 Cr+₹16.1 L (15.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 177 BLOCK R GREATER KAILASH PART 1 NEW DELHI 110048 | NEW DELHI | SOUTH DELHI | DELHI | 110048 | - | - | Rejected-Technical Disqulified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Limit exhausted |
| Sl No | Description | Qty | Unit | RITES Ltd. L1 | Specialized Engineering Services Pvt Ltd L3 | M/s Road Link Consultancy Services L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix II C (a) - Conducting Safety Audit including Remuneration of Experts/Key Personnel & support staff, boarding & lodging, Transportation, Reports & Documents, Deliverables, Cost of Office Space, Equipment, Computer Hardware/ Software, etc. required for the assignment inclusive of all Other Costs inclusive of all taxes and insurance etc. for Development Phase (Six Months) | ||||||
| 1.10Remuneration for Experts / Key Personnel | ||||||
| 1.11 | Sr. Road Safety Auditor / Team Leader – 1 no. (Min 2 Months for Development Period (Office +Site)) | 2 | Man-Month | 1,32,300 ₹2,64,600 Lowest | 1,80,000 ₹3,60,000 | 2,00,000 ₹4,00,000 |
| 1.12 | Traffic Planner – 1 no. ((Min 3 Months for Development Period (Office +Site)) | 3 | Man-Month | 1,12,400 ₹3,37,200 | 1,00,000 ₹3,00,000 Lowest | 1,50,000 ₹4,50,000 |
| 1.20Remuneration for Support Staff | ||||||
| 1.21 | 1 No. | 2 | Man-Month | 57,000 ₹1,14,000 | 45,000 ₹90,000 Lowest | 60,000 ₹1,20,000 |
| 1.22 | 2 No. | 2 | Man-Month | 57,000 ₹1,14,000 | 30,000 ₹60,000 Lowest | 60,000 ₹1,20,000 |
| 1.23Boarding & Lodging and Per Diem for Site Visits | ||||||
| 1.30 | Experts/Key Personnel - person-days @ | 30 | Per Day | 8,000 ₹2,40,000 | 3,000 ₹90,000 Lowest | 10,000 ₹3,00,000 |
| 1.31 | Support Staff - person-days @ | 30 | Per Day | 5,300 ₹1,59,000 | 2,500 ₹75,000 Lowest | 10,000 ₹3,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
1 Nov 2023, 1:00 pmClosed
CEO, UPEIDA
2nd Floor, Paryatan Bhawan. C-13, Vipin Khand, Gomti Nagar, Lucknow 226010
Selection of Safety Consultants for Group_III of Ganga Expressway Project being developed on DBFOT_Toll
2023_UPEID_849092_1
UPEIDA/2023/2725/Safety_III
Open Tender
Consultancy
Item Rate
1095 days
Lucknow
As per RFP Document
2 documents required · 2 mandatory
₹11,800
UPEIDA Through RTGS/NEFT
₹2 L
14 Dec 2023
10 Oct 2023
2 Nov 2023
10 Oct 2023
1 Nov 2023
10 Oct 2023
Amount
Appendix II C (a) - Conducting Safety Audit including Remuneration of Experts/Key Personnel & support staff, boarding & lodging, Transportation, Reports & Documents, Deliverables, Cost of Office Space, Equipment, Computer Hardware/ Software, etc. required for the assignment inclusive of all Other Costs inclusive of all taxes and insurance etc. for Development Phase (Six Months)
Remuneration for Experts / Key Personnel
Sr. Road Safety Auditor / Team Leader – 1 no. (Min 2 Months for Development Period (Office +Site))
Traffic Planner – 1 no. ((Min 3 Months for Development Period (Office +Site))
Remuneration for Support Staff
Boarding & Lodging and Per Diem for Site Visits
Experts/Key Personnel - person-days @
Support Staff - person-days @
Transportation at Site and Head Office
Vechile (not more than 3 years old)
Duty Travel to Site
Experts/Key Personnel - Round-trips @
Support Staff - Round-trips @
Office space & Equipment
Cost of office space, equipment, computer hardware/software etc. required for the assignment. (In Rs.)
Reports and Document Printing (All the reports have to be submitted in 5 sets)
(a) Inception Report covering all safety audit activities including finalisation of methodology, implementing schedule, training requirement as per TOR
(b) Report on Training and Workshop including report of technical gap observed during design audit etc.
Draft Safety Report
Final Safety Report
Appendix II C (b) - Conducting Safety Audit including Remuneration of Experts/Key Personnel & support staff, boarding & lodging, Transportation, Reports & Documents, Deliverables, Cost of Office Space, Equipment, Computer Hardware/ Software, etc. required for the assignment inclusive of all Other Costs inclusive of all taxes and insurance etc. for Construction phase (36 Months).
Remuneration for Experts / Key Personnel
Sr. Road Safety Auditor / Team Leader – 1 no.(Min 3 Months for Construction Period (Office +Site))
Traffic Planner – 1 no. - (Min 4 Months for Construction Period (Office +Site))
Remuneration for Support Staff
Boarding & Lodging and Per Diem for Site Visits
Experts/Key Personnel - person-days @
Support Staff - person-days @
Transportation at Site and Head Office
Innova (AC) or equivalent (not more than 3 years old)
Duty Travel to Site
Experts/Key Personnel - Round-trips @
Support Staff - Round-trips @
Office space & Equipment
Cost of office space, equipment, computer hardware/software etc. required for the assignment. (In Rs.)
Reports and Document Printing (All the reports have to be submitted in 5 sets)
Submission of GAP report
Road Safety Audit Reports on all activities which were planned, actually executed and planned for the next quarter.
Submission of audit report of work zone safety
Workshop report
Final Safety report
Note:- (i) Rate quoted shall include all expenditure required for assignment. (ii) The Financial Proposal shall take into account all types of tax liabilities including cost of insurance, except GST. (iii) The firms / organizations shall take full responsibility for accuracy in assessment of above amounts. (iv) GST will be reimbursed on demand and after the submission of proof of deposition of GST. (v) The payment shall be made as per payment schedule given in ToR. (vi) The payment of the consultant will be made as per deliverable made by them and it will be guided as per timeline of deliverables mentioned in RFP. (vii) Bidder must ensure that the amount in figures and in words is the same.
M/s Road Link Consultancy Services
Specialized Engineering Services Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .