| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.8 LAdmitted-Finance | ₹33.8 L | L1 | Admitted-Finance |
| 2 | L2₹40 LAdmitted-Finance N1 270 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 ODISHA | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹40 L | L2 | Admitted-Finance |
| 3 | L3₹47.6 LAdmitted-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹47.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARKITECHNO Consultants (India) Pvt. Ltd. L3 | ALFRED H KNIGHT INDIA PRIVATE LIMITED L1 | M/s. CADD CONSULTING ENGINEERS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5765.34 Ha. of Salandi Left Main Canal from RD 71.505 km to 73.003 Km including submission of Report. | 1 | Nos | 47,57,425 ₹47.6 L | 33,80,888 ₹33.8 L | 40,00,000 ₹40 L |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
6 Jan 2026, 5:00 pmClosed
CCE, ABP, SALAPADA
CCE, ABP, SALAPADA
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 5765.34 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 71.505 km to 73.003 km through UGPL
2025_CCEAB_123656_1
CCEABP- 19 of 2025-26
National Competitive Bid
Consultancy Services
720 days
CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹70,000
Yes
6 Feb 2026
23 Dec 2025
7 Jan 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
23 Dec 2025 - 27 Dec 2025
Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5765.34 Ha. of Salandi Left Main Canal from RD 71.505 km to 73.003 Km including submission of Report.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TPIA.pdf
Tender Documents • 1.28 MB
BOQ_572836.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid