Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹5.0 L
EMD Value
₹14,915
Closing Date
30 May 2026, 1:30 pmClosed
municipal commissioner
NAGAR NIGAM ROORKEE
work for installing 20 single arm pole ,ward no-37 in nagar nigam Roorkee
2026_MCNNR_92647_2
178/STREETLIGHT/2025-26
Open Tender
Miscellaneous Services
Percentage
15 days
NAGAR NIGAM ROORKEE
AS PER TENDER CONDUCTION
2 documents required · 2 mandatory
₹590
Yes
Municipal Commissioner Nagar Nigam
₹14,915
Yes
NAGAR NIGAM ROORKEE
14 Oct 2026
16 May 2026
30 May 2026
17 May 2026
30 May 2026
20 May 2026
18 May 2026 - 18 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Demolishing cement concrete manually/ by mechanical means including
disposal of material within 50 metres lead as per direction of Engineer -
in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent
design mix) | 0.9 | Nos | 2,434.25 | ₹2,190.83 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)
I manual means in foundation trenches or drains (not exceeding 1 . 5 m
in width or 1 0 sqm on plan), including dressing of sides and ramming of
bottoms, for all lift, including getting out the excavated soil and disposal
of surplus excavated soil as directed, within a lead of 50 m. | 260.3 | Nos | 260.3 | ₹67,756.09 |
| 1.03 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level:1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from
natural sources : 8 graded stone aggregate 40 mm nominal
size derived from natural sources) | 1.08 | Nos | 6,812 | ₹7,356.96 |
| 1.04 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 4.54 | Nos | 11,505.5 | ₹52,234.97 |
| 2Laying and Jointing PVC Pipe. Heading | |||||
| 2.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars. | 267.29 | Nos | 107.1 | ₹28,626.76 |
| 2.02 | Structural steel work riveted, bolted or welded in built up sections, trusses
and framed work, including cutting, hoisting, fixing in position and applying
a priming coat of approved steel primer all complete. | 221.2 | Nos | 133.3 | ₹29,485.96 |
| 2.03 | Supplying and Fixing of 90Watt LED Light for a pole with skilled labour complete all | 20 | Nos | 2,800 | ₹56,000 |
| 2.04 | Supplying and Fixing of 10 mm Wire Role For a pole light with skilled labour complete all | 5 | Nos | 7,000 | ₹35,000 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
TECH.pdf
Tender Documents • 2.61 MB
BOQ_112969.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .