Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
30 Dec 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Preparation of Detailed Project Report, with BOQ Detailed Estimates Detailed Drawings structural/ Plumbing/ Sanitary/ Electric including detailed soil investigation vetted by NIT/DIQC (Road n Buildings) of RnB Division Tangmarg when required (On Pe
2025_PWDJK_299084_1
Fresh NIT No.115/RnB/Tangmarg of 2025-26
Open Tender
Consultancy
Percentage
Tangmarg
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Executive Engineer RnB Division Tangmarg
₹5,000
24 Dec 2025
24 Dec 2025
31 Dec 2025
24 Dec 2025
30 Dec 2025
24 Dec 2025
Preparing of General Arrangement of Drawings (GAD) /structural details /drawings, Designing and BOQ (including their technical vetting) either from NIT Srinagar / DIQC Srinagar / Jammu. The Scope includes Geo Technical Investigation with the Geo technical report vetted from NIT / DIQC Srinagar, ETS, conceptual Architectural design lay outs duly vetted from NIT / DIQC. Consultancy who have rendered complete services of at least 03 projects of similar nature during last 5 years with consideration for environment may submit their offers.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_969924.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .