| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 Cr+₹63.1 L (15.2%)Rejected-AOC 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹4.8 Cr+₹63.1 L (15.2%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.0 Cr+₹83.6 L (20.1%)Rejected-AOC A 21 BEHIND LIONS CLUB SCHOOL III PHASE THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600001 | ₹5.0 Cr+₹83.6 L (20.1%) | L3 | Rejected-AOC L3 |
Tender Value
₹3.8 Cr
EMD Value
₹1 L
Closing Date
23 Sept 2023, 5:00 pmClosed
Chief Executive Officer
Chief Executive Officer Park Centre, Technopark Phase I Campus
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANTS AND WATER DISTRIBUTION SYSTEMS IN TECHNOPARK PHASE I CAMPUS AND OPERATION OF WATER DISTRIBUTION SYSTEM IN TECHNOPARK PHASE IV CAMPUS.
2023_ETPK_592301_2
ETPK/PH-I/2023-24/AT-180
Open Tender
AMC/ Maintenance Contracts
Item Rate
1095 days
Technopark Phase I and Phase IV Campuses
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,850
₹1 L
4 Nov 2023
15 Sept 2023
25 Sept 2023
15 Sept 2023
23 Sept 2023
16 Sept 2023
15 Sept 2023 - 21 Sept 2023
Amount
TECHNOPARK PHASE I CAMPUS - SEWAGE TREATMENT PLANTS THREE SHIFT OPERATION & MAINTENANCE OF (500 KLD & 180 KLD) STP PLANTS IN TECHNOPARK PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
For First Year
For Second Year
For Third Year
TECHNOPARK PHASE I CAMPUS - WATER DISTRIBUTION SYSTEM THREE SHIFT OPERATION & MAINTENANCE OF WATER DISTRIBUTION SYSTEM IN TECHNOPARK PHASE I CAMPUS FOR A PERIOD OF THREE YEARS(01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
For First Year
For Second Year
For Three Year
PREVENTIVE MAINTENANCE OF PUMPS IN WATER DISTRIBUTION SYSTEM - PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
1 HP Pumps (6 Nos) in Technopark Phase I Campus
1.5 HP Pump (1 Nos) in Technopark Phase I Campus
3 HP Pumps (3 Nos) in Technopark Phase I Campus
5 HP Pumps (4 Nos) in Technopark Phase I Campus
7.5 HP Pumps (7 Nos) in Technopark Phase I Campus
12 HP Pumps (2 Nos) in Technopark Phase I Campus
12.5 HP Pumps (6 Nos) in Technopark Phase I Campus
15 HP Pumps (2 Nos) in Technopark Phase I Campus
40 HP Pumps (2 Nos) in Technopark Phase I Campus
50 HP Pumps (3 Nos) in Technopark Phase I Campus
75 HP Pumps (2 Nos) in Technopark Phase I Campus
PREVENTIVE MAINTENANCE OF FOLLOWING EQUIPMENTS IN 500 KLD THEJASWINI STP - PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
10 HP Garden Pump (2Nos.) Sl.no- A7ATSA 0482, Make- Kirloskar
5 HP Filter feed pump (2 Nos.) Sl.No- ABALY-B3023, Make- Kirloskar
3 HP Sewage transfer pump (2 Nos.) Sl.No- AS DAN.01239, Make- Kirloskar
1 HP Sludge transfer pump (1 No.) Make- Kirloskar
20 HP Air Blower (2 Nos.) Make-Everest Transmission
PREVENTIVE MAINTENANCE OF FOLLOWING EQUIPMENTS IN 180 KLD NILA STP - PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
3 HP Filter feed pump (2 Nos.) Sl. No- A2C 1100257, Make - Kirloskar
5 HP Garden pump (2 Nos.) Sl.No- A4AMI 000962, Make -Kirloskar
TECHNOPARK PHASE IV CAMPUS - WATER DISTRIBUTION SYSTEM THREE SHIFT OPERATION OF WATER DISTRIBUTION SYSTEM IN TECHNOPARK PHASE IV CAMPUS FOR A PERIOD OF THREE YEARS (01/09/2023 TO 31/08/2026) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
For First Year
For Second Year
For Three Year
TANK CLEANING ACTIVITIES AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2023-24/AT-180
Cleaning of STP Collection Tanks, Process Tanks and Treated Water Over Head Tanks for 500 KLD & 180 KLD STP Plants in Technopark Phase I Campus using mechanized pressure pump technique. The cleaning activity has to done once in a year. A total of three cleaning activity has to done during the contract period of three years.
Cleaning of Water Distribution & Storage Tanks/Treatment tanks using mechanized pressure pump and UV disinfection technique. The cleaning activity has to be done once in every six months. A total of six cleaning activity has to done during the contract period of three years
sterling and wilson ltd
Hubert Enviro Care Systems P Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .