Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.6 LAccepted-Finance | ₹24.6 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹24.6 L−₹4,200 (0.17%)Rejected-Finance | ₹24.6 L−₹4,200 (0.17%) | 2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Tender document tender fee and emd not submitted |
| Sl No | Description | Qty | Unit | M/S Jairaj Khanka L2 | SUPER INDIA ELECTRIC WORKS L1 |
|---|---|---|---|---|---|
| 1.00Anuual Operation of following pumping stations of Ranichouri Pumping w/s scheme | |||||
| 2.00MPS DEV NAGAR NAGNI PUMPING STATION | |||||
| 2.10 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge. From 00 Hrs to 24 Hrs.
(Including Reliever & filter operator).
Pump:- Centrifugal Horizontal Pump (6 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 / 75 HP, 2900 RPM, Crompton,ABB & RKB make (6 No.)
Starter:- -6 No each. | 12 | Month | 80,200 ₹9,62,400 Lowest | 81,850 ₹9,82,200 |
| 3.00IPS Ist CHOPRIYALI PUMPING STATION | |||||
| 3.10 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge From 00 Hrs to 24 Hrs (Including Reliever)
Pump:- Centrifugal Horizontal pump M&P and KSB make (4 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 HP, 2900 RPM, Crompton, ABB and RKB Make (4 No.)
Starter:- - 4 No. | 12 | Month | 62,550 ₹7,50,600 | 61,550 ₹7,38,600 Lowest |
| 4.00IPS 2nd SABLI PUMPING STATION | |||||
| 4.10 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge. From 00 Hrs to 24 Hrs (Including Reliever)
Pump:- Centrifugal Horizontal Pump (5 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 HP, 2900 RPM, Crompton, ABB & RKB make (5 No.)
Starter:- - 5 No | 12 | Month | 62,550 ₹7,50,600 | 61,550 ₹7,38,600 Lowest |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
1 Jun 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Uttarakhand Jal Sansthan New Tehri
OPERATION AND MAINTENANCE OF RANICHAURI PUMPING WATER SUPPLY SCHEME 2026-27.
2026_UKJS_95497_1
423/Enivida/2026-27/33 dated 14-05-2026
Open Tender
Manpower Supply
Item Rate
new tehri
as per bid documents
3 documents required · 3 mandatory
₹2,360
EE Uttarakhand Jal Sansthan New Tehri
₹53,000
new tehri
7 Jul 2026
16 May 2026
2 Jun 2026
16 May 2026
1 Jun 2026
23 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Anuual Operation of following pumping stations of Ranichouri Pumping w/s scheme | |||||
| 2MPS DEV NAGAR NAGNI PUMPING STATION | |||||
| 2.1 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge. From 00 Hrs to 24 Hrs.
(Including Reliever & filter operator).
Pump:- Centrifugal Horizontal Pump (6 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 / 75 HP, 2900 RPM, Crompton,ABB & RKB make (6 No.)
Starter:- -6 No each. | 12 | Month | - | - |
| 3IPS Ist CHOPRIYALI PUMPING STATION | |||||
| 3.1 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge From 00 Hrs to 24 Hrs (Including Reliever)
Pump:- Centrifugal Horizontal pump M&P and KSB make (4 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 HP, 2900 RPM, Crompton, ABB and RKB Make (4 No.)
Starter:- - 4 No. | 12 | Month | - | - |
| 4IPS 2nd SABLI PUMPING STATION | |||||
| 4.1 | Daily operation & routine maintenance of all hydro mechanical & electromechanical components, equipments and machines control panel at Pumping Stations in general duty hours for Proper completion of works as per direction of Engineer- in - charge. From 00 Hrs to 24 Hrs (Including Reliever)
Pump:- Centrifugal Horizontal Pump (5 No.), Discharge:- 660 LPM, 330 Mtr Head
Electric Motor:- 100 HP, 2900 RPM, Crompton, ABB & RKB make (5 No.)
Starter:- - 5 No | 12 | Month | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_112907.xls
BOQ • 0.39 MB
RANICHAURI.pdf
Tender Documents • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .