Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC N1 270 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 ODISHA | BHUBANESWAR | KHORDHA | ODISHA | 751015 | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹59.5 L+₹14.2 L (31.3%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | Rejected-Technical GROUND FLOOR 72 BUSINESS PARK CROSS ROAD C MAROL INDUSTRIAL AREA MIDC ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | - | Rejected-Technical Not Qualified in Technical Evaluation | |
| 4 | Rejected-Technical 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | - | Rejected-Technical Not Qualified in Technical Evaluation | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Qualified in Technical Evaluation |
| Sl No | Description | Qty | Unit | M/s. CADD CONSULTING ENGINEERS PRIVATE LIMITED H2 | TRP Ingenieria Consultants Pvt Ltd H1 |
|---|---|---|---|---|---|
| 1.00 | Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory &
checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site /store including site inspection and checking of material and
equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for (A) 2221 Ha. of Baitarani Left Bank Canal (BLBC) from RD 0.00 km to 28.50 km and (B) 1229 Ha of Baitarani Right Bank Canal (BRBC) from RD 0.00 km to 9.00 km including submission of Report. | 1 | Nos | 45,32,000 ₹45,32,000 Lowest | 59,50,000 ₹59,50,000 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
5 Jun 2025, 5:00 pmClosed
CCE, ABP, SALAPADA
CCE, ABP, SALAPADA
Appointment of Third-Party Inspection Agency (TPIA) fo rConstruction of distribution system for (A) 2221 Ha of CCA including Command Area Development (CAD) of (BLBC) from RD 0.00 km to 28.50 km and (B)1229 Ha of CCA including operation and maintenan
2025_CCEAB_113634_1
CCEABP- 09 of 2025-26
National Competitive Bid
Consultancy Services
Lump-sum
540 days
CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹60,000
Yes
1 Sept 2025
21 May 2025
6 Jun 2025
21 May 2025
5 Jun 2025
21 May 2025
21 May 2025 - 28 May 2025
Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site /store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for (A) 2221 Ha. of Baitarani Left Bank Canal (BLBC) from RD 0.00 km to 28.50 km and (B) 1229 Ha of Baitarani Right Bank Canal (BRBC) from RD 0.00 km to 9.00 km including submission of Report.
M/s. CADD CONSULTING ENGINEERS PRIVATE LIMITED (BID ID -2951668)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .