| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹2.0 CrAccepted-Finance | ₹2.0 Cr | H1 | Accepted-Finance Bidder declared as H1 |
| 2 | H2₹1.8 CrRejected-Finance N1 270 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 ODISHA | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹1.8 Cr | H2 | Rejected-Finance Bidder declared as H2 |
| 3 | Rejected-Technical MARC HOUSE PLOT NO 2264 SECTOR 2 BEHIND SECTOR 2 POLICE STATION BAHADURGARH HARYANA 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | - | - | Rejected-Technical Firm did not responded to the shortfall documents |
| Sl No | Description | Qty | Unit | CivilMantra ConsAi Limited L2 | M/S. CADD CONSULTING ENGINEERS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00Key Personnel | |||||
| 1.01 | Team Leader Cum Senior Highway Engineer | 9 | Man-Month | 2,50,000 ₹22.5 L | 1,00,000 ₹9 L |
| 1.02 | Senior Bridge Engineer | 5 | Man-Month | 2,50,000 ₹12.5 L | 90,000 ₹4.5 L |
| 1.03 | Highway cum Pavement Engineer | 5 | Man-Month | 2,00,000 ₹10 L | 90,000 ₹4.5 L |
| 1.04 | Material-cum-Geo-technical Engineer – Geologist | 6 | Man-Month | 2,00,000 ₹12 L | 90,000 ₹5.4 L |
| 1.05 | Senior Survey Engineer | 7 | Man-Month | 2,00,000 ₹14 L | 90,000 ₹6.3 L |
| 2.00Sub Professional Staff | |||||
| 2.01 | Traffic and Safety expert | 4 | Man-Month | 1,00,000 ₹4 L | 42,000 ₹1.7 L |
| 2.02 | Environmental Specialist | 3 | Man-Month | 1,00,000 ₹3 L | 42,000 ₹1.3 L |
| 2.03 | Quantity Surveyor / Documentation Expert | 6 | Man-Month | 70,000 ₹4.2 L | 42,000 ₹2.5 L |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
17 Jan 2026, 6:00 pmClosed
Chief Engineer Project Shivalik
HQ CE (P) Shivalik Lal Tappad, Majrigrant Haridwar Dehradun Road 248140
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION OF WAN-TAPOVAN ROAD BETWEEN KM 60.00 TO KM 99.20 TO NHSL SPECIFICATION USING LIDAR TECHNOLOGY BASED SURVEY IN THE STATE OF UTTARAKHAND (APPROXIMATE LENGTH 39.20 KMS)
2025_BRO_724426_3
NIT-07-2025-26
Open Tender
Consultancy Services
300 days
WAN-TAPOVAN ROAD Distt Chamoli Uttarakhand
As per RFP
6 documents required · 6 mandatory
₹0
₹2.1 L
Yes
HQ CE (P) Shivalik Lal Tappad, Majrigrant
25 Mar 2026
22 Dec 2025
23 Jan 2026
23 Dec 2025
17 Jan 2026
2 Jan 2026
23 Dec 2025 - 30 Dec 2025
30 Dec 2025
Key Personnel
Team Leader Cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geo-technical Engineer – Geologist
Senior Survey Engineer
Sub Professional Staff
Traffic and Safety expert
Environmental Specialist
Quantity Surveyor / Documentation Expert
Land Acquisition Expert
Utility Expert
Support Staff
Office Manager
Typist
Office Boy
Night watchman
Transportation (Fixed Rate on rental basis) The vehicles cost shall include th cost of rental, driver, operation, mintenance, repairs & insurance etc.
Toyota Innova Crysta or equivalent (1 Nos.) (Not more than 06 Months Old) 10*1=10 months
Swift Dzire or equivalent (1Nos.) (Not more than 06 Months Old) 10*1=10 months
Duty Travel to Site (Fixed Costs) Professional and Sub-Professional Staff . The employer may require the Key Personnel to visit the Employer’s head quarter & Site / Employer’s Representative Office /other authorities. The quoted amount should include travel fare for 20 round trip to Employer’s Head Office and 20 round trip to Employer’s Representative Office (including Hotel charges, travel costs etc. Complete).
Office Rent (Fixed Costs) – Minimum 400 sqm area of office shall be rented
Office Rent (Fixed Costs) – Minimum 400 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre- loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Reports and Document Printing
Monthly Report (03 per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report &Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Ss, Updated Drawings etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D)notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey Equipment with Survey Party and Vehicle etc complete
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
*Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock) 1500m (for project of length <110 Km) or 2000 m (for project of length >110 Km) qty in mtr
b)Boring in hard rock, 200 mtr (for project of length <110 Km) or 300 mtr (for Project of length >110 Km) qty in mtr
Net work Survey of the existing Highways as a repositoryfor civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fixboundarypillarsalongtheproposedalignmentontheextreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land acquisition Team including support staff:
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Logistics for Land acquisition Team:
Computer including necessary peripherals (2x8=16)
Printers (2x8=16)
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1x8=8)
Remuneration of exptrite staff including per diem allownces
Staff-1
Staff-2
Staff-3
Staff-4
Staff-5
Staff-6
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
NITandLOI.pdf
Additional Documents • 2.37 MB
RFPandDCA.pdf
Tender Documents • 2.75 MB
BOQ_834953.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid