| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAdmitted-Finance 1ST FLOOR YMCA CULTURAL CENTER CUM LIBRARY BUILDING 1 JAI SINGH ROAD NEW DELHI 110001 INDIA | NEW DELHI | NEW DELHI | DELHI | 110001 | ₹9.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.5 Cr+₹48.7 L (5.40%)Admitted-Finance | ₹9.5 Cr+₹48.7 L (5.40%) | L2 | Admitted-Finance |
| 3 | L3₹14.1 Cr+₹5.1 Cr (56.6%)Admitted-Finance | ₹14.1 Cr+₹5.1 Cr (56.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bernard Consultants Pvt. Ltd. L2 | RODIC CONSULTANTS PVT. LTD. L1 | Geoconsult India Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00Estimate of Local Currency Costs I. Remuneration for Local Staff (Including per diem allowance) Professional Staff | ||||||
| 1.01 | Team Leader cum Tunnel Expert | 1 | Nos | 5,50,000 ₹55,00,000 | 6,50,000 ₹65,00,000 | 5,00,000 ₹50,00,000 Lowest |
| 1.02 | Tunnel Design Expert | 1 | Nos | 7,00,000 ₹70,00,000 | 5,50,000 ₹55,00,000 | 4,00,000 ₹40,00,000 Lowest |
| 1.03 | Geophysicist | 1 | Nos | 6,00,000 ₹36,00,000 | 2,75,000 ₹16,50,000 Lowest | 4,00,000 ₹24,00,000 |
| 1.04 | Geotechnical Engineer | 1 | Nos | 7,00,000 ₹70,00,000 | 5,10,000 ₹51,00,000 | 4,00,000 ₹40,00,000 Lowest |
| 1.05 | Senir Vntilation cum Fire Safety Expert (E&M Expert) | 1 | Nos | 4,50,000 ₹27,00,000 | 3,10,000 ₹18,60,000 Lowest | 3,40,000 ₹20,40,000 |
| 1.06 | Senior Geologist | 1 | Nos | 3,00,000 ₹30,00,000 | 3,00,000 ₹30,00,000 | 2,20,000 ₹22,00,000 Lowest |
| 1.07 | Senior Survey Engineer | 1 | Nos | 1,20,000 ₹7,20,000 Lowest | 2,20,000 ₹13,20,000 | 2,20,000 ₹13,20,000 |
| 1.08 | Environmental Specialist | 1 | Nos | 2,50,000 ₹10,00,000 Lowest | 2,70,000 ₹10,80,000 | 2,65,000 ₹10,60,000 |
| 1.09 | Material Engineer | 1 | Nos | 1,20,000 ₹7,20,000 Lowest | 2,20,000 ₹13,20,000 | 1,50,000 ₹9,00,000 |
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
4 Jun 2025, 5:00 pmClosed
Chief Engineer Project Sampark
HQ CE (P) Sampark, Kunjwani Chowk, Jammu 180010
Consultancy Services for preparation of DPR for construction Lapri tunnel approximate length 2.63 Km on Budhal Mahore Gul road including approach road 1.00 Km in project Sampark
2025_BRO_704074_1
CE(P)SPK/EPC/01/2025-26
Open Tender
Consultancy Services
Lump-sum
300 days
Budhal Mahore Gul Road
As per RFP
3 documents required · 3 mandatory
₹5,900
Yes
Chief Engineer Project Sampark Border Roads Organ
₹3.8 L
Yes
HQ Chief Engineer Project Sampark
30 Jan 2026
9 Apr 2025
5 Jun 2025
9 Apr 2025
4 Jun 2025
21 Apr 2025
11 Apr 2025 - 15 Apr 2025
17 Apr 2025
Amount
Estimate of Local Currency Costs I. Remuneration for Local Staff (Including per diem allowance) Professional Staff
Team Leader cum Tunnel Expert
Tunnel Design Expert
Geophysicist
Geotechnical Engineer
Senir Vntilation cum Fire Safety Expert (E&M Expert)
Senior Geologist
Senior Survey Engineer
Environmental Specialist
Material Engineer
Highway cum Pavement Engineer
Quantity Surveyor/Documentation Expert
Sub-Total-1
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Professional-8
Sub-Professional-9
Sub-Professional-10
Sub-Total-2
Total(Sub Total 1 + Sub Total 2)
SUPPORT STAFF
Office Manager
Typist
Office Boy
Night Watch ment
Total:
Transportation (Fixed Costs) Rate/Month
The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Total:
Duty Travel to Site(Fixed Costs): Note: Rate quoted includes Hotel charges, travel cost etc. complete.
Duty Travel to Site (LS)
Total:
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
Office Rent (Fixed Costs)
Total:
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) Rate/Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
REPORTS & DOCUMENTS PRINTING
Monthly report (3 copies per Month)
Inception report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
AEM Survey & Report
Any other Investigations/Surveys
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (Verticle) (other than hard rock)
(i) Not Exceeding 100 mtr in length
(ii) Exceeding 100 mtr in length
b) Boring in hard rock
(i) Not Exceeding 100 mtr in length
(ii) Exceeding 100 mtr in length but not exceeding 200 mtr length in rock
(iii) Exceeding 200 mtr in length in rock
Total:
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
Land Acquisition and Clearances Team including support staff and logistics/ transportation. A. Land Acquisition and Clearances team Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent (1*8)
Ex-Kanoogo/Girdwar or equivalent (1*8)
Ex-Patwari or Equivalent (1*8)
Typist (2*8)
Team meber for Forest and Environmental clearances (1*8)
Number of Land acquisition Teams (One Only)
Grand Total for All Land acquisition Teams(A)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals (2*8)
Printers (2*8)
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*8)
Number of Land acquisition Teams (One Only)
Grand Total (B)
Grand Total for All Land acquisition Teams and Logistics (A) + (B)
Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each CALA for stretches proposed for DPR preparation. (ii) Details of land acquisition teams including support staff, logistics support for land acquisition teams to be deployed by the consultant for each CALA as detailed above is minimum. However, the consultant has to ensure adequate manpower given to CALA in terms of area under acquisition in the jurisdiction of each CALA in consultation with MORT&H/BRO, to ensure completion of land acquisition proceedings in time frame stipulated in contract agreement. Cost variation in this regard is not admissible.
Estimate of costs for Expatriate consultants (in Indian Rupees) REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Total-I
Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
Sub-Total-II
Total (I+II)
Total cost net of Tax
Taxes and Duties
A. Income Tax (Expatriate)
B. Other Taxes/Duties (if any) Specify clearly
Total
Total cost (inclusive of all the taxes) but net of Goods and service Tax **Total cost net of Goods and Service Tax shall be considered for financial evaluation.
Goods and service Tax
TOTAL COSTS (Including GST)
Bernard Consultants Pvt. Ltd. (BID ID -3293814)
Geoconsult India Private Limited (BID ID -3305120)
stage.html
html • 0.04 MB
technical_788635.pdf
techsummary_788635.pdf
finance_788635.pdf
BOQ Comparative Chart
xlsx
cancelled_1.PDF
pdf • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
RFP.pdf
Tender Documents • 3.96 MB
BOQ_788635.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .