₹43.5 Cr
EMD Value
₹23.2 L
Closing Date
20 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Construction of ROB No.466 in lieu of closing of Manned level crossing at Km 824/2-4 between Vizianagaram-Korukonda stations. Spans:1x42.0m CG+2X18.0m CG +4x30.0m PSC Girder+RE Walls on East Coast Railway.
DYCEGSUWATENGG202500xxxx~ECOR
DYCEGSUWATENGG202500xxxx
Open
Works - General
24 Months
Vizianagaram, Andhra Pradesh
₹0
₹23.2 L
20 Jan 2026
24 Dec 2025
6 Jan 2026
A-Execution of concrete and its connected works for the ROB Above/
B-Execution of RCC Pile work , MS liner, Pile Load test etc., (items
C-Execution of Structural Steel works and its connected works etc.,
D-Supply,including straightening, cutting, bending, placing in position of
E-Supply and using of cement etc., (items covered under ECoR USSOR -
F-Execution of ROB approach works and its connected works etc., (items
G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-
superstructure, RE walls, Service Roads, drains etc., (items covered under USSOR-2021).
Item- 1 Execution of all items under Schedule-A.
S No. Item No Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment,
guide bunds, around buried type
abutments, bridge gaps, trolley
refuges, platforms etc. with
contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as
applicable, benching in existing banks
wherever required, spreading in layers
with motor grader, bringing the
moisture content to OMC, mechanical
compaction to specified density and
dressing of bank to final profile as per
R D S O Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips.
Note: 1) Foundation preparation,
Benching including additional
earthwork on account of this, wherever
required, shall be paid extra under
relevant schedule item for benching. 2)
Payment for Earthwork under this item
shall be made based on the cross
section measurements calculated (i)
with original ground profile of existing
bank based on initial ground levels
before doing benching and (ii) final
profile of the bank worked out with
final levels as per prevailing guidelines.
ECOR-CONST-HQ-ENGG/ECOR
2 012040 Manufacturing of blanketing material cum 2520.00 915.96 2308219.20
by wet mixing of naturally available
suitable soil including additional
blending with naturally available or
manufactured material as required to
achieve specified gradation, in
designed proportion in Pug mill or wet
mix plant to have uniform gradation
including all incidental transportation,
laying over finished formation in
uniform layer(s) with motor grader,
compaction with suitable vibratory
roller to specified density and finishing
to correct profile, complete as per
RDSO Specification No. RDSO/2020/GE:
IRS-0004 with latest correction slips.
P r o v i d i n g portable fencing along
running track where work is to be done
in close vicinity of track, maintaining
during execution of work and removing
after completion of the work as per
direction of the Engineer. Fencing shall
consist of self supporting steel angles
of size 50mm x 50mm x 6mm, 1.5m
long provided with hooks etc. and
embedded in CC 1:2:4 block of size
0.23m x 0.23m x 0.23m placed at c/c
distance of 2m along track. 12mm dia
rods in three horizontal layers shall be
tack welded with angle posts. Note :
Released material will be property of
the contractor after completion of
work. Cost of cement required for CC
blocks shall be paid separately.
retro-reflective tape in horizontal
direction, duly secured/tight with
vertical posts.
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual
Means for foundations and floors of the
bridges, retaining walls etc. including
setting out, dressing of sides, ramming
of bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation of
the layers by ramming and watering
etc. including all lift, disposal of surplus
soil up to a lead of 300m, all types of
shoring and strutting with all labour
and material complete as per drawing
and technical specification as directed
by Engineer in charge. Note: This item
will be used for excavation work in
connection with other miscellaneous
works also like side drains, foundation
for OHE masts and other
miscellaneous structures in connection
with Gauge Conversion, Doubling, New
Providing and laying in position Plain
cement concrete of specified Nominal
M i x f o r miscellaneous works like side
drains, foundation for OHE masts and
other miscellaneous structures
excluding the cost of Cement,
centering and shuttering - All work up
to plinth level :
ECOR-CONST-HQ-ENGG/ECOR
(zone-III) : 3 graded stone aggregate
20 mm nominal size)
7 022040 P r o v i d i n g and laying in position cum 2111.00 3777.08 7973415.88
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality in RCC
raft foundation & Pile cap including
finishing, using Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength
and durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved citing
reasons for not using plasticiser at the
stage of Mix Design and in that case
deduction shall be made as per
P r o v i d i n g and laying in position
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 9.0
m from foundation top level, including
finishing, using Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength
and durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved citing
reasons for not using plasticiser at the
stage of Mix Design and in that case
deduction shall be made as per
10 022053 Abutment cap, Pier Cap, Inspection cum 967.20 3874.93 3747832.30
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
11 022054 Approach slab at formation level, Dirt cum 463.07 3809.70 1764157.78
wall/ ballast wall at formation level
12 022055 Extra for every increase of 1m or part cum 2550.26 65.23 166353.46
thereof in the height above 9.0 m
ECOR-CONST-HQ-ENGG/ECOR
13 022060 Providing and laying Plain Cement cum 456.90 3513.33 1605240.48
Concrete 1:3:6 with graded stone
aggregate of 40mm nominal size, in
foundation and floors, retaining walls
of bridges including mechanical
mixing, vibrating, pumping and bailing
out water where ever required with all
materials and labour complete but
excluding the cost of cement and
shuttering as per drawings and
technical specifications as directed by
14 022070 Providing and fixing Weep Holes in Metre 924.80 276.80 255984.64
Abutments, Wing walls and Return
walls etc., of new bridges with 110mm
dia UPVC pipe Type A ISI marked with
all contractor's men, material,
transportation, all taxes as per
specifications and as directed by
Engineer-in-Charge.
Centering and shuttering including
strutting, propping etc. and removal of
15 025031 All types of bridge sub-structures, e.g. Sqm 9321.80 665.63 6204869.73
pier, abutment, wing wall, retaining
wall, RCC box type foundations,
Abutment cap, Pier Cap, Inspection
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to
5m above ground level
16 025032 All types of bridge super-structures, Sqm 4363.00 868.54 3789440.02
e.g. slabs, I-girders, T-girders, Box
girders etc. up to 5m above ground
17 025033 Extra for additional height over item Sqm 5586.50 107.45 600269.43
no. 025031 & 025032 wherever
required with adequate bracing,
propping etc. over initial height of 5
metres for every additional height of 1
metre or part thereof.
ECOR-CONST-HQ-ENGG/ECOR
18 031030 Providing and launching in position cum 1078.40 3777.08 4073203.07
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
Precast Prestressed (Pre-tensioned)
concrete girder/slab in contractor's
casting yard, including finishing, using
Plasticiser in approved proportions (as
per IS:9103), to modify workability
without impairing strength and
durability, complete as per
specifications and direction of the
E n g i n e e r. Note: 1. Payment for
Shuttering, Cement, Reinforcement,
HTS cables including stressing and
launching of girder/slab in position
shall be made extra under relevant
items. However, deduction shall be
made in case of slab as per relevant
item. 2. For pre-cast item, loading in
transport vehicle in casting yard is
included and shall not be paid extra. 3.
Plasticiser shall invariably be used in
approved proportion to increase
workability with minimum possible
quantity of cement for all grade of
Design Mix Concrete unless it is
specifically approved citing reasons for
not using plasticiser at the stage of Mix
Design and in that case deduction shall
be made as per relevant item.
position to exact design profiles, H.T.S.
cables of all classification made from
Low Relaxation strands conforming to
IS:14268- latest version in
Pretensioned Prestressed Concrete
girders/slabs etc. including supplying,
cutting, making into cables with
necessary spacers, colour coding,
protecting with water soluble oil at all
time, placing, bending, routing, fixing,
stressing including all lead and lift with
contractor's own materials, labour,
equipments etc. complete as per
drawings & specifications. Payment
shall be made in terms of weight of
HTS cables as per drawing.
Providing and fixing in position GI
Drainage Spouts of required length
with Grating in RCC slab and filling
bitumen along kerb as shown in
drawing with contractor's pipes,
bitumen, tools, equipment, lead, lifts
etc. complete as per specifications and
as directed by Engineer in-charge.
ECOR-CONST-HQ-ENGG/ECOR
Pipes Class-I, capable for a pressure of
2.5 kg/sqm in footpath of ROB for
laying cable with all contractor's
materials labour, tools, plant,
machinery, vehicles, consumables,
lead, lift etc. complete as per
specifications and as directed by
Engineer in-charge.
Metallizing of steel work of girders with
sprayed aluminium after surface
preparation by Sand/grit blasting,
followed by one coat of etch primer
(IS:5666) & one coat of Zinc Chrome
primer (IS:104) and two coats of
aluminium paint (IS:2339) with all
labour, T&P and material as a
complete job duly conforming to all
relevant specifications and process
given under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of sprayed
Aluminium coating shall be 150
microns. DFT of Zinc chrome primer
shall be 25-30 microns and DFT of each
coat of Aluminium paint shall be 12-14
22 041041 On new girder during fabrication Sqm 4000.00 774.87 3099480.00
23 041050 Providing and fixing railing used in Kg 800.00 104.58 83664.00
rows for footpath or anti-crash barrier
railing with B class G.I. pipe 65/50 mm
nominal dia including cost of M.S.
angle and channels in vertical posts,
welding / bolting, priming painting with
one coat ready mix Zinc Chromate
conforming to IS:104 with DFT of 25-
30Microns, followed by one coat of
Zinc Chrome red oxide conforming to
IS:2074 with DFT of 25 Microns with all
material, labour, T&P as a complete
job. Note: Cost of painting shall be
paid extra under relevant item.
Design, supply, fitting and fixing in
position true to line and level POT-PTFE
bearing of 300MT Capacity, consisting
of a metal piston supported by a disc
or un reinforced elastomer confined
within a metal cylinder, sealing rings,
dust seals, PTFE surface sliding against
stainless steel mating surface,
complete assembly to be of cast steel /
fabricated structural steel, metal and
elastomer elements complete as per
IS:2062, IS:1030, AISI:304, AISI:316,
5400, Bridge Code and as per
approved drawing and Technical
Specifications. The design of the
bearings shall be submitted by the
manufacturers / contractor and got
approved from Railway before fixing.
Test report after inspection of the
bearings shall be submitted and got
approved before the materials are
lifted from the manufacturer premises.
ECOR-CONST-HQ-ENGG/ECOR
Providing road crane of specified lifting
capacity with specified jib length
revolving type for material handling,
assembly & erection of
girders/slab/RCC Box etc.
Launching in position, by any approved
method, pre-fabricated Steel Girders,
precast PSC girders/slabs, casted at
casting bed developed at site, to
correct alignment and level over the
bed block / pedestal with all required
arrangements, complete in all respect.
30 051030 Supplying of stone boulders weighing cum 300.00 1347.74 404322.00
not less than 35 kg each at specified
bridge locations.
including consolidation, supply of all
materials, labour, lead, lift, tools,
plants, crossing of tracks as per
drawing and technical specification as
directed by the Engineer in charge in
case loose slush is encountered at site
of foundation before casting the
foundation or laying the filtering
including consolidation with all labour,
lead, lift, tools, plants, crossing of
tracks as per drawing and technical
specification as directed by the
Engineer in charge in case loose slush
is encountered at site of foundation
before casting the foundation or laying
the filtering media.
33 052150 Providing and laying of filter media cum 378.00 2662.74 1006515.72
consisting of granular materials of GW,
GP, SW groups as per IS:1498 (latest)
in required profile behind boulder
filling of abutments, wing walls / return
walls etc. above bed level with all
labour and material complete job as
per drawing and technical specification
of RDSO Guidelines.
34 052250 Providing Boulder Backing behind wing cum 300.00 359.00 107700.00
wall, return wall, retaining wall with
hand packed boulders & cobbles with
smaller size boulders toward the back
including all lead, lift, labour & other
incidental charges as complete work in
all respect. Payment for
boulder/cobbles will be done extra.
35 052260 Dewatering of natural or accumulated HP Hour 5000.00 45.56 227800.00
water from any location. Payment to be
done for Horse power of pump
multiplied by pumping hours.
ECOR-CONST-HQ-ENGG/ECOR
Designing and developing Detailed
structural and working Drawings for
following items for ROB/RUB/Bridge
based on Railway's approved GADs,
duly collecting necessary data from
Railways and R&B authorities, duly
designing members and submission of
check plot duly getting proof-checked
by Railway approved institutes,
submitting for Railway's verification
and approval, making corrections duly
incorporating suggestions in
drawings/designs, further submission
of original in transparent film paper
and soft copy (CD) for Railways
approval etc. with contractor's
technical expertise and instruments,
labour, consumables, repeatedly
attending till final approval etc.,
complete as directed by Engineer in-
piers/abutments
retaining wall, abutment and approach
Hiring of machinery for minor
miscellaneous works for short duration
i n c l u d i n g operator/driver, fuel,
lubricants and consumable. The
contractor shall arrange all statutory
permits as required by rules and
regulations prevailing in the area of
work. Payment shall be made for
actual working hours at site.
similar with minimum 1.10 cum bucket
Schedule B-Execution of RCC Pile work , MS liner, Pile Load test etc., (items covered under USSOR-
Item- 2 Execution of all items under Schedule-B.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Boring, providing and installation of
bored cast in-situ Reinforced Cement
Concrete piles using Hydraulic piling
Rig of specified diameter and length
below pile cap of specified grade with
Design Mix Cement Concrete, using
20mm graded crushed stone
aggregate and coarse sand of
approved quality, to carry a safe
working load not less than specified,
concreting by machine batching,
machine mixing, scaffolding, using
Admixture in approved proportion (as
per IS:9103), placing with tremie pipe,
chipping off of pile top to remove
laitance concrete above cut off level
etc., pumping and bailing out water
complete in all respect as per
approved drawing, specification and
direction of the Engineer in charge.
N o t e : 1. Payment for only cement,
reinforcement shall be made extra. 2.
Length of the pile for payment shall be
measured up to the bottom of RCC pile
Cap. 3. Plasticiser shall invariably be
used in approved proportion to
increase workability with minimum
possible quantity of cement for all
grade of Design Mix Concrete unless it
is specifically approved citing reasons
for not using plasticiser at the stage of
Mix Design and in that case deduction
shall be made as per relevant item.
2 022100 Providing, fabricating and installing MT 246.48 108148.95 26656553.20
permanent casing pipe for bored piles
for all diameters with specified
thickness of steel plate including all
labour, materials, tools & complete as
per approved drawing & specifications
complete in all respect as per the
direction of Engineer in charge. Note:
Payment shall be made as per the
weight of circular plate of casing pipe
Extra for chiselling in addition to boring
of piles, if chiselling is required to be
resorted to in hard rock or big stone
boulders larger than 30cm, manually
or by any other means.
Conducting load test of a single pile up
to specified capacity in accordance
with IS:2911 (Part-IV) including
installation of loading platform and
preparation of pile head or
construction of test cap and
dismantling of test cap after test etc.
with all labour, material, tool & plants,
equipment, machinery, etc. complete
as per drawing and specification, as
directed by the Engineer.
4 022122 Initial load test above 50 ton and up to Each 50.00 66928.79 3346439.50
100 T capacity pile
5 022123 Initial load test above 100 ton and up Each 30.00 89785.37 2693561.10
to 250 T capacity pile
ECOR-CONST-HQ-ENGG/ECOR
testing of piles with contractor's men,
materials and machines. The rate
includes cost of Inspection of site,
preparation of pile head and any other
unforeseen cost required for the test,
submission of reports in triplicate as
per satisfaction of the Engineer in
coal tar or bitumen confirming to
IS:3117- latest version on the top and
sides of RCC box/slabs @ 1.70 kg/sqm
after cleaning the surface with all
labour and materials complete job as
directed by the Engineer.
Schedule C-Execution of Structural Steel works and its connected works etc., (items c.overed under
Item- 3 Execution of all items under Schedule-C.
S No. Item No Description of Item Unit Qty Rate Amount
1 031090 Design, manufacturing, supplying and Cubic 216000.00 1.52 328320.00
fixing in position elastomeric bearing Centimetre
true to line and level conforming to
prestressed concrete girders/ Steel
Girders, for Pre-cast as well as cast-in-
situ girders as per approved drawing.
The rate shall include cost of load test
of one no. bearing from Railway
approved firms and all fixing materials,
equipments, machineries, labour,
taxes, loading, unloading, leading,
lifting etc. complete. Rates include
getting the drawing approved from
Railway and cost of inspection during
manufacturing from railway approved
organization.Note : 1. The rate is for
finished item complete and paid only
after fixing in position below the girder.
2. The volume shall be as given in the
drawing and no deduction shall be
made for inserted steel plates etc.
Providing and fixing in position of
standard preformed sealed and slab
type or strip seal elastomeric type
expansion joints for Railway bridge or
Road Over Bridges as per approved
drawings and latest MORTH/IRC
specifications complete in all respect
as directed by Engineer in-charge.
Load testing of one or more spans of
bridge as selected by the Engineer as
per approved load test procedure
following relevant IS/IRC/Railway codes
with contractor's labour, deflection
measuring instruments, loading
materials, recording and analyzing the
load testing results including all lead &
lift, etc. complete as required. The
rates are all inclusive and will be paid
after load test is finished and girder is
cleared of the kentledges/loading
material etc. The load shall be 1.25
times the stipulated design load.
ECOR-CONST-HQ-ENGG/ECOR
4 031112 Extra for every increase of 1 MT or part MT 2392.00 283.64 678466.88
thereof over 100 MT in the span design
load capacity up to 800 MT
Supplying, fabrication, assembling of
all types of steel girders of specified
spans with structural steel conforming
to Quality "B0" Grade Designation
E250 conforming to IS:2062, erection /
slewing / end launching of steel girders
with cranes or any other approved
launching methods as per site
conditions (not requiring traffic block)
on sub-structure including provision of
trolley refuges etc., complete as per
a p p r o v e d Q A P and drawings
conforming to IRS-B1-2001 and other
relevant codes and specifications.
Note: 1. Detailed fabrication and
erection drawings & launching
methodology will be prepared by the
contractor and got approved from
Railway. 2. The rate is all inclusive
including launching in position,
complete in all respect except cost of
(i) Painting / Metalising; (ii) Bearings &
(iii) HSFG bolts which shall be paid
extra under relevant item. 3. The
payment shall be made on the
theoretical weight of main components
and gusset plates only. 4. Payment
Schedule: (i) Receipt of material at
site: 40% (ii) Fabrication of girders:
20% (iii) Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel Work)
6 041013 Extra for using steel conforming to MT 442.00 3969.26 1754412.92
Grade Designation E350 instead of
Grade Designation E250 of Quality
"B0" as per IS: 2062
7 041020 Supplying and fixing HSFG bolts of any Kg 7300.00 197.67 1442991.00
dia and any length with suitable nuts
including DTI washers conforming to
IRS-B1-2001 f o r bridges and steel
structures with contractors labour,
tools and plants and lead and lift etc.,
8 041080 Supplying, Fabricating and fixing MT 1.20 92360.23 110832.28
access ladders, inspection platforms,
Trolley refuges etc., on bridges with
structural steel conforming to IS:2062
including welding / bolting, priming
painting with one coat of ready mixed
paint of Zinc Chromate (IS:104) with
DFT of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns with
all material, labour, T&P as a complete
job. Note: Painting shall be paid
separately under relevant item.
ECOR-CONST-HQ-ENGG/ECOR
9 041090 Supplying, fitting and fixing in position MT 7890.00 684.22 5398495.80
true to line and level cast steel
rocker/roller bearing of different load
bearing capacity conforming to IS
IS:3073 and IRS Bridge Code including
all accessories as per drawing and
Technical Specifications with all
material, labour, T&P as a complete
job. The payment shall be made for the
load bearing capacity in Metric Tonne
as per approved drawing.
10 041100 Supplying, fitting and fixing in position MT 7890.00 883.81 6973260.90
true to line and level forged steel roller
bearing of different load bearing
capacity conforming to IS :7666,
IRS Bridge Code including all
accessories as per drawing and
Technical Specifications with all
material, labour, T&P as a complete
job. The payment shall be made for the
load bearing capacity in Metric Tonne
as per approved drawing.
Schedule D-Supply,including straightening, cutting, bending, placing in position of Reinforcement
steel etc., (items covered under ECoR USSOR -2021).
Item- 4 Execution of all items under Schedule-D.
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening, cutting,
bending, placing in position and
binding all complete.
1 025082 Thermo-Mechanically Treated bars of Kg 962913.00 102.40 98602291.20
grade Fe-500D or more of approved
Schedule Schedule E-Supply and using of cement etc., (items covered under ECoR USSOR -2021).
Item- 5 Execution of all items under Schedule-E.
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at Worksite
approved brands/makes
Schedule F-Execution of ROB approach works and its connected works etc., (items covered under
CPWD-DSR-2023).
Item- 6 Execution of all items under Schedule-F.
S No. Item No Description of Item Unit Qty Rate Amount
13.0 FINISHING
13.44S EXTERIOR FINISHING
Finishing walls with Acrylic Smooth
exterior paint of required shade :
13.46.1 New work (Two or more coat applied @ Sqm 288 160.6 46252.8
1.67 ltr/10 sqm over and including
priming coat of exterior primer applied
@ 0.90 litre/10 sqm)
Applying priming coats with primer of
approved brand and manufacture,
having low VOC (Volatile Organic
Compound ) content.
13.85.3 With water thinnable cement primer on Sqm 2990.58 73.95 221153.39
2 wall surface having VOC content less
than 50 grams/litre
16.0 ROAD WORK
ECOR-CONST-HQ-ENGG/ECOR
16.1S ROADS
16.1 Preparation and consolidation of sub Sqm 5040 218.9 1103256
grade with power road roller of 8 to 12
tonne capacity after excavating earth
to an average of 22.5 cm depth,
3 dressing to camber and consolidating
with road roller including making good
the undulations etc. and re-rolling the
sub grade and disposal of surplus
earth with lead upto 50 metres.
16.9 Scarifying metalled (water-bound) road Sqm 11640 33.3 387612
surface including disposal of rubbish,
lead upto 50 m and consolidation of
the aggregate received from scarifying
with power road roller of 8 to 10 tonne
16.30S PREMIX CARPET
Providing and applying tack coat using
hot straight run bitumen of grade VG -
10, including heating the bitumen,
spraying the bitumen with
mechanically operated spray unit fitted
on bitumen boiler, cleaning and
preparing the existing road surface as
per specifications :
Providing and applying tack coat using
bitumen emulsion conforming to
IS:8887, using emulsion pressure
distributer including preparing the
surface & cleaning with mechanical
With medium setting bitumen
16.49S MISCELLANEOUS
16.50 Providing and fixing Glow studs of size Each 1000 206.3 206300
100x20 mm made of heavy duty body
shall be moulded ASA (Acrylic styrene
Acrylonitrile ) or HIP (High impact
polystyrene) or ABS having
electronically welded micro- prismatic
lens with abrasion resistant coating as
approved by Engineer in charge. The
glow stud shall support a load of 13635
kg tested in accordance with ASTM
D4280. The slope of retro- reflective
surface shall be 35 (+/-5) degress to
7 base .The reflective panels on both
sides with at least 12 cm of reflective
area up each side. The luminance
intensity should be as per the
specification and shall be tested as
described in ASTM I: 809 as
recommended in BS: 873 part 4 :
1973. The studs shall be fixed to the
Road surface using the adhesive
conforming to IS, as per procedure
recommended by the manufacturer
complete and as per direction of
Engineer-in-charge.
ECOR-CONST-HQ-ENGG/ECOR
Providing and laying Dense Graded
Bituminous Macadam using crushed
stone aggregates of specified grading,
premixed with bituminous binder and
filler, transporting the hot mix to work
site by tippers, laying with paver
finisher equipped with electronic
sensor to the required grade, level and
alignment and rolling with smooth
wheeled, vibratory and tandem rollers
as per specifications to achieve the
desired compaction and density,
complete as per specifications and
directions of Engineer-in-Charge.
thickness with bitumen of grade VG-30
@ 5% (percentage by weight of total
8 mix) and lime filler @2% (percentage
by weight of Aggregate) prepared in
Batch Type Hot Mix Plant of 100-120
Providing and laying Bituminous
concrete using crushed stone
aggregates of specified grading,
premixed with bituminous binder and
filler, transporting the hot mix to work
site by tippers, laying with paver
finisher equipped with electronic
sensor to the required grade, level and
alignment and rolling with smooth
wheeled, vibratory and tandem rollers
to achieve the desired compaction and
density as per specification, complete
and as per directions of Engineer-in-
bitumen of grade VG-30 @ 5.5%
(percentage by weight of total mix)
9 and lime filler @ 3% (percentage by
weight of Aggregate) prepared in
Batch Type Hot Mix Plant of 100-120
16.62 Providing and applying 2.5 mm thick Sqm 930 747.8 695454
road marking strips (retro- reflective)
of specified shade/ colour using hot
thermoplastic material by fully/ semi
automatic thermoplastic paint
applicator machine fitted with profile
shoe, glass beads dispenser, propane
10 tank heater and profile shoe heater,
driven by experienced operator on
road surface including cost of material,
labour, T&P, cleaning the road surface
of all dirt, seals, oil, grease and foreign
material etc. complete as per direction
of Engineer-in-charge and accordance
with applicable specifications.
Construction of granular sub-base by
providing close graded Material
conforming to specifications, mixing in
a mechanical mix plant at OMC,
carriage of mixed material by tippers
to work site, for all leads & lifts,
16.78 spreading in uniform layers of
specified thickness with motor grader
on prepared surface and compacting
with vibratory power roller to achieve
the desired density, complete as per
specifications and directions of
Engineer-in-Charge.
ECOR-CONST-HQ-ENGG/ECOR
16.78.1 With material conforming to Grade-I cum 2328 2784 6481152
11 (size range 75 mm to 0.075 mm)
having CBR Value-30
16.79 Providing, laying, spreading and cum 3492 2914.3 10176735.6
compacting graded stone aggregate
(size range 53 mm to 0.075 mm ) to
wet mix macadam (WMM) specification
including premixing the material with
water at OMC in for all leads & lifts,
laying in uniform layers with
mechanical paver finisher in sub- base
/ base course on well prepared surface
and compacting with vibratory roller of
8 to 10 tonne capacity to achieve the
desired density, complete as per
specifications and directions of
Engineer-in-Charge.
22.0 WATER PROOFING
22.1S General
22.22 Providing and mixing integral Kg 5444.12 388 2112318.56
crystalline admixture for water
proofing treatment to RCC structures
like basement raft, retaining walls,
reservoir, sewage & water treatment
plant, tunnels / subway and bridge
deck etc. at the time of transporting of
concrete into the drum of the ready-
mix truck , using integral crystalline
admixture @0.80% (minimum) to the
weight of cement content per cubic
meter of concrete) or higher as
recommended by the manufacturer's
specification in reinforced cement
13 concrete at site of work. The material
shall meet the requirements as
specified in ACI-212-3R-2010 i.e. by
reducing permeability of concrete by
more than 90%, compared with control
concrete as per DIN 1048 and resistant
to 16 bar hydrostatic pressure. The
crystalline admixture shall be capable
of self-healing of cracks up to a width
of 0.50 mm. The work shall be carried
out all complete as per specification
and the direction of the Engineer-in-
charge. The product performance shall
carry guarantee for 10 years against
26.0 NEW TECHNOLOGIES AND MATERIALS
26.1S General
Providing at all heights, levels and
locations Aluminium profile industrial
troughed sheet of Alloy
31500/31000/40800, conforming to IS
1254, IS 737, IS 2676. The sheet shall
be fixed using self drilling/self tapping
SS screws of size 5.5x65 mm with
EPDM seal complete upto required
pitch in horizontal, vertical or curved
26.19 surfaces including cutting to size and
shape where required as per
specifications, detail drawings and
direction of Engineer-in-Charge. The
rate shall be inclusive of all screws,
seal, ridge, labour, scaffolding,
machinery for fixing and approved
sealant where required etc. but
excluding the cost of purlins, rafters
ECOR-CONST-HQ-ENGG/ECOR
26.19.2 0.91 mm thick, the profile detail width Sqm 900 1462.9 1316610
26.41S NEW TECHNOLOGY ITEMS
26.65 Providing and fixing roofing consist of Sqm 1911.84 1525.6 2916703.1
0.8 mm thick galvanized steel deck
sheet confirming to IS 277:1992 used
as permanent shuttering over which
MS wire mesh 3mm laid at 100x100
mm grid including edge trim covered
with concrete. This metal deck will be
supported on structural steel beam
with shear studs. (Structural steel like
Beam, column, joists etc. & concrete of
different grade as per design will be
paid separately).
Schedule Schedule G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-2023 items).
Item- 7 Execution of all items under Schedule-G.
S No. Item No Description of Item Unit Qty Rate Amount
1 1 Providing Reinforced earth structure Sqm 5040.00 9848.09 49634373.60
including excavation for foundation,
foundation concrete in M15 and
cement concrete grooved seating in
the foundation for facing elements in
M35 (facia material) and its placement,
assembling, joining with facing
elements and laying of the reinforcing
elements as per Clause 3103, fixing
friction ties and anchor pins etc. as per
approved design and drawing,
providing filter media of minimum 300
mm width or more behind wall with
perforated drainage pipe of required
diameter both longitudinal and
transverse direction as directed, back
filling with approved granular selected
material , laying in layers of 150mm
thick, breaking clods, dressing in
required lines, grades & section,
watering and compaction by vibratory
roller etc. including all lifts (for 5 Km
lead & average height of 8 m)
complete. Note : Back filling of
approved granular material of
1500mm width to be provided.
carboxylate ether base water reducing
admixture Plast Super- C700
conforming to lS:9103-1999 (to be
added @ 1% by weight of cement) for
CC & RCC work for controlling water
cement ratio and for gaining early
ECOR-CONST-HQ-ENGG/ECOR
3 3 Provision of an reinforced cement Metre 1080.00 783.15 845802.00
concrete crash barrier /r.c.c wall type
railing at edge of the road, approaches
to bridge structure and medians,
constructed with M-25 Grade concrete
with HYSD reinforcement conforming
to IRC: 21 and dowel bars of 25mm
dia, 450mm long at expansion joints
filled with pre-moulded asphalt filler
board, keyed to the structure on which
it is built and installed as per design
and as per dimension in the approved
drawing and at location directed by the
engineer all as specified excluding cost
of steel reinforcement, its fabrication
charges and premoulded filler for
finished item (as per approved
4 4 Providing and laying well graded cum 1680.00 2533.45 4256196.00
drainage fill by 450 mm thick
composed of 20mm, 10mm, and 6mm
of well graded aggregate as per
drawing and technical specification
and including cost, seignorage and
conveyance of all the material to site
and all labour charge, drain pipe
wrapped With geotextile, hire charges
of plant and machinery for laying filter
Media, including technical supervision
as directed by engineer- in-charge for
finished item of work for drainage
layers behind the facts. As per
approved reinforced soil wall drawing.
5 5 Filling in between reinforced earth(RE) cum 20160.00 378.20 7624512.00
walls with good gravel (Angle of
interna friction not less than 32)
depositing the gravel between walls,
spreading gravel, sectioning, grading
and consolidation with 8 to 10 Tonnes
vibratory road Roller @ OMC and with
plate compactor/small vibrator for 1.5
m width from facia to meet
requirement of table 300-2 of MORTH,
including all hire and operational
charges of T&P and seigniorage
charges, complete for finished item of
work as per MoRT&H specification 305
& 2200 (5th Revision) (Payment will be
made based on level for finished Item
of work) as per approved drawing and
as per the directions of the Engineer-
6 6 Conducting non destructive tests on Numbers 400.00 2795.00 1118000.00
butt and fillet welds as per IS codes by
Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved agency
and submitting the proper test report
to the department duly certification by
the approved agency with contractor,
labor, materials, tools and plants
including leading, loading and
unloading etc complete as directed by
the Engineer-incharge.R.T.Test (Film
ECOR-CONST-HQ-ENGG/ECOR
7 7 Conducting non destructive tests on Metre 4000.00 608.00 2432000.00
butt and fillet welds as per IS codes by
Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved agency
and submitting the proper test report
to the department duly certification by
the approved agency with contractor,
labor, materials, tools and plants
including leading, loading and
unloading etc complete as directed by
the Engineer-in-charge.D.P.Test/
M.P.Test/U.T.Test.
8 8 Providing precast RCC slab for use as cum 55.49 8121.00 450634.29
shuttering slabs, foot path slab etc,
using M-30 design mix with 20 mm
graded stone aggregate including
fixing and removal of contractor's for
works ,shuttering supports, vibrating
,curing etc and fixing in position (all
labour and materials including cement
by the contractor) with all lead and lift
etc as per approved drawing and as
directed by the Engineer-in-charge.
elastomeric membrane coating with
breathing property(viz., "Emce colour
Flex"/Deck guard 'S' or similar type
coating materials) over one coat with
its primer, the system should be made
of water based acrylic polymer with
selected mineral fillers having
properties of ultra violet resistant
crack bridging type, carbonation
resistant, water proofing coating, the
consumption of primary coat and two
coats of protective coating shall be as
per the manufacturers specification
should be in suitable approved shades,
including cost of materials, cleaning
chipping and removing the dirt
particles of the concrete with wire
brush and water, labour for applying
the above coatings, scaffolding
charges, all inclusive taxes etc for sub
structure and super structure of the
Road over Bridge. Dry film thickness of
each coating shall not be less than 150
microns. Manufaturer specifications
shall be followed.
10 10 Launching girders under traffic block. MT 442.00 12911.36 5706821.12
11 11 Painting of crash barrier/kerb stones of Sqm 955.00 149.00 142295.00
CC/RCC slabs, stone with approved
quality reflective type of Enamel paint
, including one coat of primer with
contractor's own labour and material
etc. complete as directed by Engineer -
thick heavy duty, full-body
homogeneous, anti-algal, all weather
resistant, exterior use Paving vitrified
tiles of size upto 400mmx400mm in
approved shade, colour & quality,
having anti-skid matt finish surface
with plain or projected texture. Tiles to
be laid on 20 mm average thick
cement mortar bed of 1:4 (1 cement :
4 coarse sand) with all labour, material
ECOR-CONST-HQ-ENGG/ECOR
13 13 Supplying, cutting and fixing 18 mm Sqm 150.00 1203.00 180450.00
thick mastic pads for clean
joints/expansion joints in between slab
etc. as per IS: 1838 specification
inlcuisve of costs of labour, materials,
tools and equipment, loading,
unloading, all lead and lift, including
crossing of railway track, taxes, royalty
and all other incidental charges etc.,
complete as diretced by Engineer-In-
charge (cut pieces less than 500 mm
should not be used).
14 14 Providing Speed breakers as per Each 2.00 2953.00 5906.00
Railway's approved Plans/Drawings
including painting white and yellow
bands, diagonals etc., complete with
contractor's labour men and materials,
m a c h i n e r y , consumables, approved
paint, T&P, Crew, fuel etc., complete
inlcuidng all lead and lifts and directed
by engineer-In -Charge.
15 15 Supply, fabrication, painting and Each 15.00 4429.00 66435.00
erection of road traffic warning boards
of suitable height of various purposes
such as No parking, No entry , HTV and
prohibited etc as per IRC standards
made of 50 * 50 * 5 mm MS angles
such and 3 mm thick MS plate for the
board of appropriate enamel paint and
pasted with reflective stickers
reflective paint on the board erected
into the ground with cement concrete
including earth work excavation, etc as
directed by the Engineer-in-Charge.
16 16 Supplying & fixing of bearing with Each 4.00 122121.26 488485.04
fixtures for 25T loading for composite
girders- welding type 18.3m/24.4m
and 30.5m span Metallic guided
bearing as per RDSO approved
drawings with latest amendment. The
rate is inclusive of supply of Metallic
guided bearings and all other
components of approved dimensions
and specifications based on RDSO
Drawings with latest amendment,
fixing in position on bed block true to
line and level on pier/ abutment. This
included testing charges from reputed
laboratories, inspection charges, if any,
fixing with any other adhesive material
to the satisfaction of Engineer at site
with all lead, lift, labour etc. complete
in all respect. Note The bearing shall
meet with the requirement as
mentioned in the respective approved
drawings. (18.3m Span).
ECOR-CONST-HQ-ENGG/ECOR
17 17 Supplying & fixing G.I. lamp posts in Each 10.00 10290.00 102900.00
crash barriers of ROB. The Post shall
consist of G.I. Pipe 100 mm dia 3m
long reduced to 75 mm dia 2.5m long
and again reduced to 50 mm dia 2.5 m
vertical height including fixing of G.I.
reducers and welding of G.I. Pipes,
bending ,transportation, all taxes ,lead,
lift etc. Necessary provision for
Electrical concealed wiring shall be
made in the parapets and lamp posts
complete as require. Rate is also
inclusive of fixing of contractors
junction boxes in crash barriers.
18 18 Fabricating, supplying & installing Kg 2000.00 993.89 1987780.00
stainless steel railings for staircases,
balconies, FOBs, Enquiry/Reservation
complex etc., made of SS 304 grade
stainless steel, laser cut / water jet cut
(no shearing), polished with Automatic
round/flat polishing machine to get a
uniform hairline finish. All parts shall
be connected to each other with the
help of prescribed size CNC made solid
connectors, countersunk screws.
Welding should be finished ensuring
that no welding marks are visible and
assembly is mounted on floor with the
help of dash fasteners. Railings shall
be fabricated as per approved
drawings by engineer-in-charge.
Manufacturer shall submit
maintenance manual and basic
material test report for grade
19 19 Supplying and fixing approved quality Sqm 100.00 3663.00 366300.00
of poly carbonate sheets 2mm thick in
side walling to suit the required profile
embossed clear translucent UV
protected with all fittings such as J
bolts bitumen and cup washers,
including drilling holes in sheets, filling
the gaps with silicon sealant including
all cost of labour materials, lead, lift,
transportation, loading, unloading, etc.
complete as directed by Engineer-in-
charge. Note: The area of individual
sheets will be taken into consideration
ECOR-CONST-HQ-ENGG/ECOR
Liaison Services under Railways Bridge
(Amendment) Act, 2008 including Site
office with all category of Man power
(Land expert, Amin, Legal expert,
Chainman etc.), Camp for public
consultation, boundary making and
fixing of stone with supervision
charges involving below activities:
NOTE: 1. PRE-ACQUISITION ACTIVITIES
(Sections 20-A to 20-D) 1.1 Land
Survey and Verification (Section 20-A
Support) 1.2 Stakeholder Consultation
and Documentation 1.3 Survey
Operations Support (Section 20-B) 1.4
Damage Assessment and
Compensation (Section 20-C) 1.5
Objection Management (Section 20-D)
2. DECLARATION PROCESS (Section 20-
E) 2.1 Declaration Documentation 2.2
Publication and Notification 3.
COMPENSATION AND ACQUISITION
(Sections 20-F to 20-I) 3.1 Valuation
and Compensation (Sections 20-F & 20-
G) 3.2 CALA and Arbitration Support
3.3 Payment and Possession (Sections
20-H & 20-I) 4. POST-ACQUISITION
ACTIVITIES 4.1 Land Transfer and
Mutation 4.2 Final Demarcation and
Handover 4.3 Compliance and
Reporting 4.4 Fixing of Boundary stone
Payment Schedule: i) 40% of the
accepted rate will be made after
complting Section -11/20A to 20-D. ii)
20% will be released on clearing
Section - 20-E (iii) 20% on clearing
Section - 20-F (iv) 20% in the Final bill
after completing all land acquisition
work, including mutations of land to
the name of the Railway.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .