Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.4 LAccepted-AOC | ₹14.4 L | 1 | Accepted-AOC As per attached. |
| 2 | 2₹14.7 L+₹25,200 (1.74%)Rejected-AOC | ₹14.7 L+₹25,200 (1.74%) | 2 | Rejected-AOC Over Rate |
| 3 | 3₹14.8 L+₹33,600 (2.33%)Rejected-AOC NANDNI VIHAR ADHOIWALA DEHRADUN | ₹14.8 L+₹33,600 (2.33%) | 3 | Rejected-AOC Over Rate |
| Sl No | Description | Qty | Unit | ESPY ASSOCIATES | M/S Jairaj Khanka | Jyatee Electrical & Electrical Services |
|---|---|---|---|---|---|---|
| 1.00Daily operation & routine maintenance of following hydro mechanical & electromechanical components, equipments and machines from 0 Hrs to 16 Hrs. Including bush cutting & cleaning of pump house, fixing of bearings, oil, greasing packing etc complete. | ||||||
| 1.01 | RAW WATER PUMPING STATION BAIRAGNA (0 Hrs to 16 Hrs) | 2 | Nos | 4,22,400 ₹4,22,400 | 34,400 ₹34,400 Lowest | 35,000 ₹35,000 |
| 1.02 | MPS GORSHALI PUMPING STATION (0 Hrs to 16 Hrs) | 2 | Nos | 4,22,400 ₹4,22,400 | 34,400 ₹34,400 Lowest | 35,000 ₹35,000 |
| 1.03 | 4.20 MLD FILTER PLANT AT MPS GORSHALI (0 Hrs to 16 Hrs) | 2 | Nos | 4,22,400 ₹4,22,400 | 34,400 ₹34,400 Lowest | 35,000 ₹35,000 |
| 1.04 | HOLIDAY RELIEVER FOR ABOVE PUMPING STATION | 1 | Nos | 2,11,200 ₹2,11,200 | 17,200 ₹17,200 Lowest | 17,500 ₹17,500 |
Tender Value
₹1,770
EMD Value
₹29,600
Closing Date
16 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER UTTARAKHAND JAL SANSTHAN DEVPRAYAG TEHRI GARHWAL
OPERATION AND MAINTENANCE WORK OF KOTESHWAR SILKAKHAL PUMPING WATER SUPPLY SCHEME UNDER DEVPRAYAG DIVISION TEHRI GARHWAL
2026_UKJS_92613_1
2020/E Tender/Si/2025-26 Dt-24/02/2026
Open Tender
Manpower Supply
Item Wise
365 days
Devprayag
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Executive Engineer Uttarakhand Jal Sansthan Devpra
₹29,600
Devprayag
19 Jun 2026
2 Mar 2026
19 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
9 Mar 2026
Daily operation & routine maintenance of following hydro mechanical & electromechanical components, equipments and machines from 0 Hrs to 16 Hrs. Including bush cutting & cleaning of pump house, fixing of bearings, oil, greasing packing etc complete.
RAW WATER PUMPING STATION BAIRAGNA (0 Hrs to 16 Hrs)
MPS GORSHALI PUMPING STATION (0 Hrs to 16 Hrs)
4.20 MLD FILTER PLANT AT MPS GORSHALI (0 Hrs to 16 Hrs)
HOLIDAY RELIEVER FOR ABOVE PUMPING STATION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Silkakhal.pdf
Tender Documents • 5.92 MB
BOQ_109627.xls
BOQ • 0.31 MB
plant.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .