Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37,500Accepted-Finance WARD NO 09 VPO CHHAPOLI UDAIPURWATI JHUNJHUNU RAJASTHAN 333302 | JHUNJHUNU | RAJASTHAN | 333302 | 1 | Accepted-Finance Accepted due to being lowest bid. | |
| 2 | 2₹40,700+₹3,200 (8.53%)Rejected-Finance | 2 | Rejected-Finance Rejected due to other bid being lower | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance B 10 KRISHNA IND ESTATE BIDC GORWA VADODARA 390016 | VADODARA | VADODARA | GUJARAT | 390016 | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹40,700
Closing Date
8 Mar 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Army Bhuj
GE (ARMY) BHUJ / BHUJ AREA
Provn 01 X EQPT ROOM SIZE 30 X 22 FEET OF 3 UG WE DET AT KHAVDA UNDER GE ARMY BHUJ
2020_MES_407923_4
3029/JO/2020-21/13/E3
Limited
Consultancy Services
Item Rate
30 days
GE (ARMY) BHUJ / BHUJ AREA
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
13 May 2021
1 Mar 2021
10 Mar 2021
1 Mar 2021
8 Mar 2021
1 Mar 2021
30 days
Amount
To carryout the test ascertain soil profiles /proportion in determine safe bearing capacity complete with field and lab investigation to revelent specification of IS 2131,IS 6403,IS 1498 & IS 2720. Conducting Soil Investigation for the following : ( a ) 150 mm dia meter bore holes as per IS specification . (b) Bore Holes (i) No of bore holes = 01 no ( Ref Note) ( Less than 4000 Sqm area of bldg ) (ii) Depth of bore hole= 10 m ( Ref note ) (c) Collection of disturbed and undisturbed soil sample at interval of 1.00 mtr or at change of strata or as per relevant IS Code . (d) Conducting lab test on disturbed soil samples as considered necessary according to relevant specification of IS 2720:- (i) Sieve analysis (ii) Atterberg limits (iii ) Natural moisture content (iv ) Particle size analysis test (v) Bulk density (e) Conducting lab test on undisturbed soil samples as considered necessary according to relevant specification of IS 2720:- (i) Sieve analysis (ii ) Atterberg limits (iii ) Natural moisture content (iv ) Particle size analysis test (v) Bulk density (vi) Specific grav (vii) Free swell index and swelling property of soil (viii) Organic matter in any soil, if any (ix) Consolidation test (Compressed index value)
(x) Triaxial compression test and determination of shear parameters (C & O) test as per relevant IS . (xi) Harmful salt ( complete investigation as already ref.) (f) Ground Water table :- (i) maximum and minimum levels on Ground Water in the area with sources of information . (ii)Ground water Table during investigation (g)Submission of Six copies of test reports with detailed description of field investigation , soil classification and general nature of soil strata , water table , inpretation of test results , grains size , distribution curves, compressive index curves, site plan etc. (h)The SBC of the soil is required to be given as per following table Calculation of bearing capacity will be governed generally as per IS 8009 ( Pt- I)- 1976, IS-2720 (Pt- II)-1980, IS 6403- 1981, is 1904-1986 & is 1080-1985 AND other relevant IS Codes :- Depth of SAFE BEARING CAPACITY OF SOIL IN T/M FOR FOOTING SIZES Foundation 1.00m 1.20m x 1.20m .50m x 1.50m 2m x 2m 2.50m x 2.50m 1.50m 2.00m 2.50m
(j) With every site's Soil Investigation Report , a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. Location of foundation of adjacent structures, especially those that might be impacted by the porposed construction. (k) Every page of the Soil Investigation Report should have the Name of the Job for which Soil Investigation is being carried out. In case of multiple sites of a single Job are being investigated name of each site shall be put on each page of report pertaining to the site. (l) All pages of the Soil Investigation Report shall be serially numbered, stamped and signed by the Agency carrying out the soil investigation. Report should be scrutinised by GE and CWE for correctness and endorse. (M) Consultancy services for devoloping architectural, structural drawings structural analysis, designs and detailed estimates, take off bill of quantities and pricing as per the IS standards and structural detailings codes and submission of the detailed calculation of stage wise yard stick material calculation, section wise calculation (stage wise) :- The rate shall include the following as below :- (1) Preparation & approval of Architectural drawings (ii) Submission & Approval of structural design drawings and vettted by Engineering College (iii) Submission and approval of detailed working drawing (Archictural and structural drawings including schedule of finishes and site plan (Sextuplicate) (iv) Submission & approval of detailed estimate rate analysis for buildings/structures (v) Submisson of report alongwith recommendations in 5 copies.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_476208.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .