Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.3 LAccepted-AOC N1 270 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 ODISHA | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹62.3 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹70.4 LRejected-AOC | ₹70.4 L | L2 | Rejected-AOC 2ND LOWEST |
| 3 | L3₹92 LRejected-AOC SUNIL PATODIA TOWER J B NAGAR ANDHERI EAST MUMBAI MAHARASHTRA 400099 UDYAM MH 18 0041951 27AADCC8291R1ZT B R 07AADCC8291R1ZV B | MUMBAI SUBURBAN | MAHARASHTRA | 400099 | ₹92 L | L3 | Rejected-AOC 3RD LOWEST |
| 4 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | - | Rejected-Technical Not qualify in technical evaluatio |
| 5 | Rejected-Technical 52 A 6TH FLOOR INDUSTRIAL DIVISION ADI SHANKARACHARYA MARG OPP POWAI LAKE POWAI MUMBAI MUMBAI MAHARASHTRA 400072 MH19E0037546 27AADCI5198M1ZX B M R MSME STATUS AS NOT VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | - | - | Rejected-Technical Not qualify in technical evaluation |
| Sl No | Description | Qty | Unit | Choice Consultancy Services Private Limited L3 | ALFRED H KNIGHT INDIA PRIVATE LIMITED L2 | M/s. CADD CONSULTING ENGINEERS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 12155.80 Ha of Salandi Left Main Canal from RD45.570 km to 49.810 km including submission of Report. | 1 | Nos | 92,00,000 ₹92 L | 70,42,888 ₹70.4 L | 62,34,500 ₹62.3 L |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 Nov 2025, 5:00 pmClosed
CCE, ABP, SALAPADA
CCE, ABP, SALAPADA
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 12155.80 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 45.570 km to 49.810 km through UGPL
2025_CCEAB_120263_1
CCEABP-13 of 2025-26
National Competitive Bid
Consultancy Services
810 days
CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1 L
Yes
18 Mar 2026
29 Oct 2025
19 Nov 2025
29 Oct 2025
18 Nov 2025
29 Oct 2025
29 Oct 2025 - 4 Nov 2025
Amount
Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 12155.80 Ha of Salandi Left Main Canal from RD45.570 km to 49.810 km including submission of Report.
ALFRED H KNIGHT INDIA PRIVATE LIMITED (BID ID -3222164)
Choice Consultancy Services Private Limited (BID ID -3235014)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TPIA.pdf
Tender Documents • 1.29 MB
BOQ_559432.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid