Loading…
Loading…
Tender Value
₹7.3 L
EMD Value
₹3,666
Closing Date
23 Apr 2026, 11:00 amClosed
Dr NTTPS
SE OFFICE
Attending of maintenance works pertaining to 36" Size Gravimetric Coal Feeders of 800 MW, Stage-V, Dr.NTTPS as and when required for a period of 06 months from the date of commencement of the work during the year 2026-27
924818
E-04/2026-27 of CE/O&M/Dr.NTTPS(SE/O&M/Stage-V)
OPEN - NCB
Annual maintenance works
NTR, ANDHRA PRADESH
6 documents required · 6 mandatory
₹260
₹3,666
18 Apr 2026
18 Apr 2026
18 Apr 2026
Replacement of worn out/torn out/damaged gravimetric feeder belt by new belt.
Replacement of failed bearings of take up pulley, inlet span rollers grease retaining ring and bearing retainer.
Replacement of head pulley bearings, coupling halves studs flange and rubber bushes of main drive pulley.
Replacement of coupling halves of drive pulley of gravimetric feeder
Draining of oil from feeder main gear boxes and clean out conveyor gear boxes, cleaning of internal and filling with new oil (servo mesh SP)
Removing of the coal on the conveyor belt of gravimetric feeder.
Overhauling of raw coal bunkers gates of gravimetric feeder.
Dismantling/replacing/servicing and re erection of feeder outlet.
Opening and closing of RC feeder doors
Dismantling and replacement of defective RC feeder drive gear box and overhauling of removed gear box.
Replacement of failed bearings of weigh span rollers with motion monitor, weigh sensing roller of RC feeders
Machining of damaged main drive pulley shaft with flange
Machining of damaged takeup pulley shaft
Poking and hammering the bunker from RC feeder for establishing coal flow
Welding of 5.00mm to 8.00mm thick MS Plate for repairs to RC feeder inlet & outlet chutes and gates
Dismantling of feeder clean out conveyor gear box and replacement of gear box internals, damaged couplings, bearings of the drive sprocket, non drive sprocket if necessary and refixing the same.
Replacement of clean out conveyor , failed bearings of gravimetric feeder
Servicing / Overhauling of lube oil supply pumps
The Contractor/Firm has to quote their acceptable % excess/Less on the above mentioned 'Estimate amount' duly inclusive of all the applicable provisions, as per Minimum wages Act and excluding EPF, ESI & GST, for carrying out the subject work during the year 2024-25, as per the scope of work attached to this schedule.
The statutory appliances of EPF, ESI shall be reimbursed subject to production of proof of acquittance and limited to the Rates & Rules applicable from time to time. GST will be paid extra as per the Rates & Rules applicable from time to time.
If any deviation in quoting the tender by the tenderer, will be liable for rejection.
The Successful bidder should submit the filed quality plan duly signing before issuing the LOA. The Field quality plan (FQP) signed by the awarded tenderer and the same should got approved by the Quality Control wing/APGENCO before commencement of the work and shall follow all the quality system procedures as mentioned in FQP in executing the subject work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
3037-General Conditions- E procurement -2026-27.pdf
TENDER_DOCUMENT • 10.25 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.67 MB
NIT-04.docx
TENDER_DOCUMENT • 0.07 MB
TS-130.docx
TENDER_DOCUMENT • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .