Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 CrAdmitted-Finance | ₹22.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹24.8 Cr+₹2.0 Cr (8.78%)Admitted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | ₹24.8 Cr+₹2.0 Cr (8.78%) | L2 | Admitted-Finance |
| 3 | L3₹28.1 Cr+₹5.4 Cr (23.6%)Admitted-Finance | ₹28.1 Cr+₹5.4 Cr (23.6%) | L3 | Admitted-Finance |
| 4 | L4₹29.5 Cr+₹6.7 Cr (29.4%)Admitted-Finance A 8 GREEN PARK NEW DELHI 110016 INDIA | NEW DELHI | SOUTH DELHI | DELHI | 110016 | ₹29.5 Cr+₹6.7 Cr (29.4%) | L4 | Admitted-Finance |
| 5 | L5₹33.3 Cr+₹10.6 Cr (46.4%)Admitted-Finance | ₹33.3 Cr+₹10.6 Cr (46.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aarvee Associates Architects Engineers and Consultants Pvt.Ltd L6 | Intercontinental Consultants and Technocrats Pvt. Ltd. L4 | AYESA Ingenieria y Arquitectura, S.A L5 | Sheladia Associates Inc L7 | Dhruv Consultancy Services Pvt. Ltd. L1 | RITES Ltd. L8 | Chaitanya Projects Consultancy Pvt. Ltd. L2 | SA Infrastructure Consultants Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00I. Remuneration for Professional Staff - Key Professional Staff (Man-month as per details at Appendix-C-3) | |||||||||||
| 1.01 | Team Leader Cum Senior Highway Engineer – 1 no. | 1 | Nos | 3,00,000 ₹1,80,00,000 | 1,00,000 ₹60,00,000 Lowest | 4,20,500 ₹2,52,30,000 | 2,92,100 ₹1,75,26,000 | 2,20,000 ₹1,32,00,000 | 3,24,000 ₹1,94,40,000 | 2,20,000 ₹1,32,00,000 | 2,88,750 ₹1,73,25,000 |
| 1.02 | Deputy Team Leader – 1 no. | 1 | Nos | 2,75,000 ₹99,00,000 | 50,000 ₹18,00,000 Lowest | 2,82,750 ₹1,01,79,000 | 2,54,000 ₹91,44,000 | 1,75,000 ₹63,00,000 | 2,60,000 ₹93,60,000 | 2,00,000 ₹72,00,000 | 1,74,000 ₹62,64,000 |
| 1.03 | Sr. Contract Specialist – 1 no. | 1 | Nos | 2,50,000 ₹52,50,000 | 50,000 ₹10,50,000 Lowest | 2,55,200 ₹53,59,200 | 4,14,929 ₹87,13,509 | 1,00,000 ₹21,00,000 | 3,68,420 ₹77,36,820 | 1,30,000 ₹27,30,000 | 1,59,040 ₹33,39,840 |
| 1.04 | Resident Engineer cum Highway Engineer - 3 nos. | 1 | Nos | 2,50,000 ₹3,30,00,000 | 50,000 ₹66,00,000 Lowest | 2,17,500 ₹2,87,10,000 | 2,38,500 ₹3,14,82,000 | 1,50,000 ₹1,98,00,000 | 2,96,970 ₹3,92,00,040 | 1,50,000 ₹1,98,00,000 | 1,62,196.36 ₹2,14,09,920.05 |
| 1.05 | Highway Design Specialist – 1 no. | 1 | Nos | 2,25,000 ₹54,00,000 | 30,000 ₹7,20,000 Lowest | 3,26,250 ₹78,30,000 | 3,26,700 ₹78,40,800 | 1,00,000 ₹24,00,000 | 2,90,000 ₹69,60,000 | 1,00,000 ₹24,00,000 | 2,11,200 ₹50,68,800 |
| 1.06 | Bridge Design Specialist – 1 no. | 1 | Nos | 2,25,000 ₹40,50,000 | 30,000 ₹5,40,000 Lowest | 3,26,250 ₹58,72,500 | 3,19,200 ₹57,45,600 | 1,50,000 ₹27,00,000 | 2,95,000 ₹53,10,000 | 1,00,000 ₹18,00,000 | 2,11,200 ₹38,01,600 |
| 1.07 | Sr. Bridge/Structural Engineer – 1 no. | 1 | Nos | 2,25,000 ₹81,00,000 | 50,000 ₹18,00,000 Lowest | 2,39,250 ₹86,13,000 | 2,22,250 ₹80,01,000 | 2,00,000 ₹72,00,000 | 3,82,700 ₹1,37,77,200 | 1,50,000 ₹54,00,000 | 1,73,460 ₹62,44,560 |
| 1.08 | Sr. Quantity Surveyor - 1 no. | 1 | Nos | 2,25,000 ₹81,00,000 | 75,000 ₹27,00,000 Lowest | 2,39,250 ₹86,13,000 | 2,45,500 ₹88,38,000 | 1,40,000 ₹50,40,000 | 2,79,100 ₹1,00,47,600 | 1,00,000 ₹36,00,000 | 1,23,900 ₹44,60,400 |
| 1.09 | Sr. Pavement Specialist–1 no. | 1 | Nos | 2,25,000 ₹40,50,000 | 30,000 ₹5,40,000 Lowest | 2,90,000 ₹52,20,000 | 2,75,000 ₹49,50,000 | 1,20,000 ₹21,60,000 | 3,24,000 ₹58,32,000 | 1,30,000 ₹23,40,000 | 1,91,160 ₹34,40,880 |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
14 Jul 2022, 1:00 pmClosed
CEO, UPEIDA
2nd Floor, Paryatan Bhawan, C-13, Vipin Khand, Gomti Nagar, Lucknow 226010
Selection of Independent Engineer for Group-IV of Ganga Expressway Project
2022_UPEID_708736_1
UPEIDA/2022/2304/GE_IE_IV
Open Tender
Consultancy
Lump-sum
1825 days
Lucknow
As per RFP Document
2 documents required · 2 mandatory
₹59,000
UPEIDA, Through RTGS/NEFT/BG
₹2.5 L
Lucknow
17 Aug 2022
17 Jun 2022
15 Jul 2022
17 Jun 2022
14 Jul 2022
27 Jun 2022
17 Jun 2022 - 22 Jun 2022
24 Jun 2022
Amount
I. Remuneration for Professional Staff - Key Professional Staff (Man-month as per details at Appendix-C-3)
Team Leader Cum Senior Highway Engineer – 1 no.
Deputy Team Leader – 1 no.
Sr. Contract Specialist – 1 no.
Resident Engineer cum Highway Engineer - 3 nos.
Highway Design Specialist – 1 no.
Bridge Design Specialist – 1 no.
Sr. Bridge/Structural Engineer – 1 no.
Sr. Quantity Surveyor - 1 no.
Sr. Pavement Specialist–1 no.
Highway Engineer– 3 nos.
Bridges/Structural Engineer – 3 nos.
Sr. Quality/Material Expert – 3 nos.
Road Safety Expert – 1 no.
Environment Expert – 1 no.
Electrical Engineer – 1 no.
Geotechnical Expert – 1 no.
TMS and ATMS Expert – 1 no.
Building Design & Construction Expert – 1 no.
Remuneration for Professional Staff - Sub Professional
Survey Engineer – 3 nos.
Assistant Highway Engineer – 3 nos.
Assistant Bridge Engineer – 3 nos.
Quantity Surveyor - 1 no.
Lab Technician - 3 nos.
Horticulture cum Landscaping - 1 no.
II. Support Staff
Office Manager - 4 nos.
Accountant cum cashier - 1 no.
Steno cum Computer Operator – 4 nos.
Office Boy - 8 nos.
III. Transportation (Fixed rate on monthly rental basis)
Innova (AC) or equivalent (not more than 3 years old)
Bolero (AC) or equivalent (not more than 3 years old)
Bolero for sub professional staff (not more than 3 years old)
IV. Duty Travel to Site (Fixed Costs) (For all Lengths of Projects): Professional & Sub-Professional Staff
Site to Authority HQ for Key Professionals (36 + 12) = 48 Round trips (including Hotel charges, travel costs etc. Complete)
Site to Regional Office for Key Professionals (36 + 24) = 60 Round trips (including Hotel charges, travel costs etc. Complete)
V. Office Rent (Fixed Costs) Minimum 400 sqm area of Office shall be rented as HO during Construction period. During Maintenance Period, the space may be reduced to 200 sqm. In addition to the above, the consultant shall maintain three field offices of minimum area of 200 sqm each during the construction period. The location of the Field offices shall be finalized in consultation with Authority. The Rent cost includes electricity and water charges, maintenance charges, cleaning, repairs etc. complete.
Head Office (36 months for Construction period)
Head Office (24 months for Maintenance period)
Field Office (3 X 36 months for Construction period)
VI. Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
VII. Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) , PCs with latest configuration with licensed softwares (5 Nos), laser Printers (2 no., 30 ppm, A3 size) etc., binding machine (1 no.), plotter A0 size, Smart screen, AC (4 no., 1.5 Ton), Water Coolers (as required) etc.
Construction Period
Maintenance Period
VIII. Reports and Document Printing
Monthly reports (Design and Construction) - 60 X 3 copies
Half yearly Reports - 10 X 3 copies
Various others reports as provided in the Concession Agreement such as Completion Report - 5 X 3 copies
IX. Road Survey Equipment
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement Strength measurement using FWD ( During O&M)
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro reflectometer
X. Contingencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Uttar Pradesh Expressways Industrial Development Authority, Uttar Pradesh.
Chaitanya Projects Consultancy Pvt. Ltd.
SA Infrastructure Consultants Pvt. Ltd.
Intercontinental Consultants and Technocrats Pvt. Ltd.
AYESA Ingenieria y Arquitectura, S.A
Aarvee Associates Architects Engineers and Consultants Pvt.Ltd
Sheladia Associates Inc
RITES Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .