Loading…
Loading…
Tender Value
₹8.0 Cr
Closing Date
14 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
TM
12 conditions · 1 needing a document upload
In case the tenderer is authorized agent/ dealer/ distributor of the specified OEM i.e., M/s.Cummins , firm should upload the current authorization/ dealer ship/tender specific authorization certificate issued by OEM with validity of authorization to cover entire period of proposed AMC. In case, the validity of authorization does not cover the entire period of proposed AMC, the authorized dealer should submit an undertaking along with the offer to the effect that necessary extension of the validity of the authorization would be ensured before the expiry of the current validity.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
54 conditions · 10 needing a document upload
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code and PAN Number, duly certified by the authorised official of the bank, to facilitate payment through ECS/NEFT/RTGS.In lieu of Bank Certificate, scanned copy of a cancelled cheque may be attached for verification of the above particulars. The prescribed format of Bank Mandate form is enclosed along with tender schedule.
EMD: The tenderer is exempted from depositing Earnest Money as per the provision contained in MSOP-2018, item no.31(G) of Part-A Works Matters. The bidder shall submit the bid security declaration as per the prescribed proforma of Bid Security Declaration attached to the tender schedule.
Performance Guarantee : Contractor shall have to submit a Performance Guarantee (PG) of 5% of the contract value within 30(Thirty) days from the date of issue of letter of Acceptance(LOA) .The PG has to be submitted in four separate parts of1.25% each of the contract value. All the provisions along with Extension of time , Penalty etc as specified in clause 4.11 of GCC for Services 2018 are applicable.
Variation in Ordered Quantity: Applicable as per GCC for Service2018 para No 5.3.2.
Price Variation Clause: The Price Variation Clause (PVC) of General Conditions of Contract (GCC) shall not be applicable to this Annual Maintenance Contract (AMC) as per Railway Board's Letter No. 2013/CE-I/CT/O/10/PVC/Pt.1, dated 27.01.2015
Payment: Railway shall make payment through NEFT on submission of bill by the contractor, duly certified by the authorized Railway officer in-charge of the work that the work has been completed to the satisfaction of the Railway. Spare parts and components are charged during the repairing work areas per the accepted rate list, terms &conditions of the agreement. Bill paying authority will be Sr.DFM/BZA. Payment would be normallymade within 30 (Thirty) days from the date of submission of bills at Dy.CE/TM/Lines/BZA, if found to be in order. While submitting the bill the Contractor should attach the following documents along with the bill in Railway format in Electronic Form. 1.Fall clause certificate 2.Copy of Delivery Challan 3.Copy of the Supply Order.4.Copy of Invoice. 5.Documents applicable for claim of statutory duties and taxes.
Statutory Variation Clause: Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract(and not the raw materials thereof),within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the submission of bid. No claim on account of statutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in his offer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall be admissible on account of misclassification by the supplier/contractor.
Fall Clause: Fall Clause is applicable as per IRS Conditions of Contract as amended up to date. During every billing, the Contractor has to give certificate stating that no spares are supplied to other parties less than these rates.
New Impost: Any New Impost or revision in the duties, taxes, levies, etc. on finished product levied, as statutory duties during the currency of contract will be reimbursed by Railway subject to submission of documentary evidence in respect of payment made by the supplier.
TAXES & DUTIES: While quoting, the rates should clearly indicate the rate of applicable taxes. Tenderer should submit the rates duly specifying the taxes and same shall be charged at the rate applicable at the time of delivery of spares and date of servicing the machine for the Railway. The payment will be made only on production of documentary evidence. Tenderer should also furnish HSN code, GSTIN number representing the States in which they are registered for GST along with the address of registered office, place of Business in state etc. Firm should ensure that they are GST compliant and their quoted tax structure/rates are as per GST law.
The rates quoted by the contractor should not be above the rates quoted for any other other Railway/Govt Agency
The contractor has to provide the Railway the services of their Engineer for carrying out inspections to check the condition of engines periodically, attend maintenance schedule and take necessary action as required in order to prevent failures to the maximum extent. The periodical inspection of the engines shall include imparting necessary guidance to machine operators for conducting routine maintenance. Charges for the same shall be paid as agreed in the contract.
This is a single tender for " Annual Maintenance Contract (AMC) for Overhauling / Repair /maintenance of cummins Make Diesel Engines for a period of two years at a total estimated cost of Rs. 7,97,79,659-(Rs.4,45,95,338/- for 2026-27 and Rs. 3,51,84,321/- for 2027-28) working over South Coast Railway, open line, against the authorized dealer of OEM M/s. Srinivasa Sales Pvt Ltd/Vijayawada ". So only M/s. Srinivasa Sales Pvt Ltd/Vijayawada is requested to submit their offer. Offer submitted by any other firm will not be considered for evaluation and consideration.
Contract shall come into force from issue of letter of acceptance and shall be in force for a period of two years i.e. for 2026- 27and for 2027-28 from the date of issue of Letter of Acceptance or till the valid authorized date of OEM to the agency whichever is earlier. However the validity can be extended if mutually agreed. The firm should ensure that the validity of their Authorization/Dealership certificate is current/valid during the AMC period
Skilled and unskilled labor and small consumables like grease, oil etc. required for servicing the machines in Railway premises shall be arranged by Railways at site as per availability. However, Tools & Plants for the job shall be brought by Service Engineer himself at their cost.
During maintenance/servicing, the Service Engineer will replace spare part(s) if necessary. Such spares duly certified by the machines in-charge will be paid at the rates agreed. Supply of these spares alone also can be requested by South Coast Railway. Contractor has to supply the spares at the rates agreed. The contractor shall return the released materials to the Railway.
At the end of each deputation of their Engineer, the contractor will raise the bills directly on the Railway with a certificate from machine-in-charge that the Engineer had attended for the number of days and hours claimed and satisfactorily carried out the job. Payment to be made within 30 days from the date of billing.
spares are to be supplied in advance by the contractor on a formal requisition from Railways and immediately on its receipt; Railway will make them available at site for use when the maintenance/service of the machine is undertaken. The contractor shall ensure that the spares as requisitioned by Service Engineer are available in the AMC
All the defective/unserviceable components, which are released, shall be returned to the railway by the firm and the same shall be accounted for by concerned Senior Section Engineer. The engines overhauled at Phalthan, the following spare parts if replaced during overhauling are to be returned. 1) Kit Piston engine, 2) Piston Pin, 3) Kit, Liner 4) Rod Push, 5) Core Cooler, 6)Vibration Damper, 7) Main bearing shell & 8) Connecting rod Bearing. The return parts by the firm shall be recorded during accountal by Senior Section Engineer.
Firm has to submit list of Spares and its rates required for overhauling and maintenance of the engines which are procured as and when required. These rates are binding for the entire term of the AMC
Only genuine spare parts are to be supplied and/or fitted. The contractor shall submit documentary proof in the form certificate for imported spares supplied from OEM.
All spare parts supplied against AMC are guaranteed'/warranteed as per IRS conditions of Contract.
During the subsistence of this contract, this agreement may be terminated by the Railways by giving fifteen days' notice
a) For repair/overhaul of engines, the contractor will provide guarantee for 6 months from the date of commissioning or 1800EWH (One thousand eight hundred Engine working hours) of working on machine whichever is later against faulty workmanship & defective manufacturing of parts. b) In case warranty replacement is not completed by the firm within 3months period from the date of failure for a overhauled engine ,the amount of expenditure/loss incurred by railways will be borne by the agency, and the amount will be deducted from the account bills or from the future bills or from the bills pending with other railways. Also the performance of the firm for such incidents may be recorded as poor performance of the firm
In case top overhauling of engine at site is not completed within 2 weeks of informing, penalty of 1500/- per day of default (beyond 2 weeks) will be recovered from agency (provided the Railway delivers required spares at site on day of commencement).
On completion of overhauling, the testing shall be done at OEM premises on full load at dynamometer and to this effect the test certificate shall be provided. The contractor shall inform the tentative date of testing at Pune. However, testing shall not be with held for want of Railway representative.
Arbitration : In the event of any dispute, differences etc, in interpreting the various clauses of the agreement or in actual working of the contract, the same will be referred to by either of the parties to the General Manager, South Coast Railway or to any one specially nominated by him on his behalf for arbitration and his award is binding on both the contractor and the Railways. The Arbitration and Conciliation Act 1996 and rules there under and any statutory modification thereof shall apply to the Arbitration proceedings under this clause
A request for supply of spares or deputation of service engineer shall be honored till last date of currency of the AMC. Execution of such request will be obviously after expiry of AMC and delivery date or deputation period will go beyond it depending upon the terms of delivery/deputation stipulated in the AMC. No additional extension of validity for such cases is required and bills for such work/supplies will be honored by Railways as per the delivery schedule for spares mentioned in the agreement
Contractor shall be wholly responsible for the statutoryobservations performing to his staff viz PF, ESI, WCA etc and hewill be responsible for the maintenance of necessary records inthis connection and also comply with all statutory requirementsin force from time to time. The Contractor shall pay minimumwages to his staff as fixed from time to time under the laws inforce.
The Contractor shall not be entitled to be provided with any facilities by way of accommodation, free passes or material or transport. The arrangements for stay and lodging of the staff of the contractor shall be the responsibility of the contractor
The Service Engineer can be called by concerned Railway official. Even when Service Engineer is not specially called by Railway all engines shall be inspected by Service engineer once in 3months for preventive schedule maintenance.
Contractor shall provide Supervisory services provided by the Service Engineer for each engine free of charge for inspection of engine at ZTMD/RYP or at any location of S.Co.Railway prior to dispatch for overhauling.
The contract shall provide necessary supervisory services as &when required to assess condition of engine on the basis of performance parameters and case history so that suitable decision can be taken by Railways whether engine needs major repairs or not
Contractor shall arrange to dispatch engine to & from destination i.e either from CPOH/RYP or ZTMD/RYP Or from any location of S.Co.Railway. Railways shall declare & certify value of engine being sent through certificate. Transit insurance shall be arranged by the Contractor. Insurance charges shall be included in the invoices.
On receipt and dismantling of engine, Contractor shall submit component wise inspection and estimate shall be submitted to Railways for approval of Railways. 100% test check will be exercised by the Railways before approval of estimate. The reasons for replacement of major subassemblies will also be informed along with the estimate. Railway also reserves the right to ask reason for replacement any component. The inspection by Railway official will be based on the availability of officials. However, Railways will minimize the time taken once the offer for inspection is made.
On completion of overhauling, the testing shall be done at OEM premises on full load at Dynamometer and to this effect the test certificate shall be provided. The Contractor shall inform the tentative date of testing at Phalthan. However, testing shall not be withheld for want of Railway representative.
Test certificate with test observations are to be provided by the contractor.
The components/Sub-assemblies removed from the engine/equipment for the purpose of repairs will be brought by Railways to contractor's Service Center at Auto Nagar, Vijayawada and after repairs, the repaired components will be collected and taken to site by Railway.
In case major overhaul of engines is not done within 10 weeks of informing, a penalty of half percent of complete overhauling cost will be recovered per each week of default from the agency(provided wherever Railway has to arrange spares, the Railway delivers required spares at site on the day of commencement.)
Contractor should submit documentary proof(original/attested/notarized bill of lading/entry, original/attested/notarized Packing slip & Warranty certificate)for imported spares supplied from OEM.
In case Service Engineer doesn't reach site within 4 days of informing (or 2 days in case of emergency), after receipt of any telephonic/fax/e-mail/written message from Railway the service charges of service engineer shall be reduced by 25% for the number of days delayed or days spent on deputation whichever is lower.
Contractor shall be wholly responsible for the statutory observations performing to his staff viz PF, ESI, WCA etc and he will be responsible for the maintenance of necessary records in this connection and also comply with all statutory requirements in force from time to time. The Contractor shall pay minimum wages to his staff as fixed from time to time under the laws in force.
The Contractor shall not be entitled to be provided with any facilities by way of accommodation, free passes or material or transport. The arrangements for stay and lodging of the staff of the tenderer shall be the responsibility of the tenderer.
A certificate is to be submitted that the firm does not charge higher rates than any other authorized dealer for Cummins Engines and the rate are uniform.
A request for supply of spares or deputation of service engineer shall be honored till last date of currency of the AMC. Execution of such request will be obviously after expiry of AMC and delivery date or deputation period will go beyond it depending upon the terms of delivery/deputation stipulated in the AMC. No additional extension of validity for such cases is required and bills for such work/supplies will be honored by Railways as per the delivery schedule for spares mentioned in the agreement.
Based on the certification by inspector-in-charge of the Machine about satisfactory completion of services or satisfactory supply of spares requested, bill will be passed by Dy.CE/TM/Lines/BZA as the case may be and payment will be arranged by Sr.DFM/BZA.
The firm should submit the required documents as per clauseNo.17.2 of GCC for services 2018.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The contract will be governed by Indian Railways StandardGeneral Conditions of Services-2018 with up to date correctionslips in accordance with GFR 2017, IRS Conditions of Contractand Terms and conditions of this contract & special conditions ofcontract to the extent applicable & accepted.
Annual Maintenance Contract for Overhauling and maintenance of Cummins Make Diesel Engines of various models for 2026-27 & 2027-28 at an estimate value of Rs.7,97,79,659/- for open line of South Coast Railway.
SCOR-TM-AMC-CUMMINS-26-28~SCOR
SCOR-TM-AMC-CUMMINS-26-28
Single
Service - General
24 Months
Visakhapatnam, Andhra Pradesh
₹0
Exempted
21 Sept 2026
21 Sept 2026
30 Sept 2026
6 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,45,95,338 | ||
| — | — | — | 4,45,95,338 | ||
| — | :- Annual Make Diesel engines working | Maintenance Contract Engines for 2026-27 at a over South Coast Railway, | Overhauling/Repair/maintenance 4,45,95,338.00(including |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CUMMINSANNB.pdf
ATTACHMENT
CUMMINSANNC.pdf
ATTACHMENT
BIDDECLA.pdf
ATTACHMENT
MANDATE.pdf
ATTACHMENT
DETAILS.pdf
ATTACHMENT
IRSConditionofcontract1_compressed.pdf IRS CONDITIONS
ATTACHMENT
GCC2018PART1.pdf
ATTACHMENT
GCC2018PART2.pdf
ATTACHMENT
finaltenderdocument.pdf
ATTACHMENT
CUMMINSANNEXUREA.pdf
ATTACHMENT
IRSConditionofcontract1_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .