Loading…
Loading…
Tender Value
₹16.9 L
EMD Value
₹8,500
Closing Date
5 Oct 2026, 10:30 am
Dr NTTPS
SE CHP DR NTTPS
Different types of mechanical maintenance works in Crusher house at MM-III sub division of CHP-III/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
993804
E-78/2026-27 CE/O&M/Dr.NTTPS (SE/O&M/CHP)
OPEN - NCB
Annual maintenance works
KRISHNA, ANDHRA PRADESH
8 documents required · 8 mandatory
₹600
₹8,500
26 Sept 2026
26 Sept 2026
26 Sept 2026
Replacemnt of Non-Drive pulley of any conveyor.
Replacemnt of Drive pulley of any conveyor.
Replacement of Non-Drive pulley bearings for Conveyor.
Replacement of Drive pulley bearings for Conveyor.
Replacement of geared couplings ( GC-D-1005, GC-D-1006-C, GC-D-1009, RG-01, RG-03, RG-07 AND RG-10).
Replacement of FGC-01 geared coupling.
Replacement of medium duty ( less than 75KW power capacity) gear box of any conveyor.
Over haul of medium duty ( less than 75KW power capacity) gear box of any conveyor.
Replacement of Drive end bearing housings (plumber block) for any crusher of Stg-I&II, Stg-III&IV.
Replacement of Non drive end bearing housings (plumber block) for any crusher of Stg-I&II, Stg-III&IV.
Replacement of Drive end bearings for any crusher of Stg-I&II, Stg-III&IV.
Replacement of Non drive end bearings for any crusher of Stg-I&II, Stg-III&IV.
Replacement of suspention discs ( 1 Set = 32 Nos or I Set = 37 Nos ) for any crusher of Stg-I&II, Stg-III&IV.
Replacement of manganeese steel toothed ring hammers (1 set = 124 Nos or 1 set = 148 Nos) for any crusher of Stg-I&II, Stg-III&IV.
Replacement of end disks for any crusher of Stg-I&II, Stg-III&IV.
Replacement of cage screens(1 No upper and 1 No lower) for any crusher of Stg-III&IV.
Replacement of kick of plate for any crusher of Stg-III&IV.
Replacement and over hauling of FCU-41 fluid coupling, with alignment, for any crusher of Stg-I&II, Stg-III&IV.
Replacement of multi disc for FCU-41 fluid coupling, with alignment, for any crusher of Stg-I&II, Stg-III&IV.
Replacement of shaft for any vibrating screens / vibrating grizzly feeder of Stg-I&II, Stg-III&IV.
Replacment of motor sheeve pulley or vibrator sheeve pulley for any vibrating screens / vibrating grizzly feeder of Stg-I&II, Stg-III&IV.
Replacement of VGFs Bearings for any vibrating screens / vibrating grizzly feeder of Stg-I&II, Stg-III&IV.
Replacement of pivoted take up motor base for any vibrating screens / vibrating grizzly feeder of Stg-I&II, Stg-III&IV.
Replacement of oil seals at VGF Oil tank for any vibrating screens / vibrating grizzly feeder of Stg-I&II, Stg-III&IV.
Replacement of 150mm pipe for any VGF.
Replacement and over haul of gear box TE-125.
Replacement of bearing housings, bearings and sleeves for any Dust extraction system of Stg-I&II, Stg-III&IV.
Replacement of shaft for any Dust extraction system of Stg-I&II, Stg-III&IV.
Clearing of jammed wet coal from crusher chamber.
Emergency upkeeping of spilled over coal, jammed coal and slurry coal of any conveyor.
Note:1. The firm has to quote their acceptable % excess/less on the above mentioned total amount for carrying out the subject work as & when required during the year 2026-27 as per the scope of work attached to this schedule
2. The statutory appliances EPF , ESI shall be reimbursed subject to production of proof of acquittances and limited to the rates & rules applicable from time to time.GST will be paid extra as per the rates & rules applicable from time to time.
3.If any deviation in quoting the tender by the tenderer will be liable for rejection
4. The standard field quality plan should be enclosed to the tender enquiry by incorporating the clause that ”the contractor should submit the FQP duly signed along with the tender schedule
5. FQP shall be approved by QC wing
6. The contractor should engage sufficient man power for completion of the work within time as instructed by the Engineer In charge without fail or else necessary action will be initiated
CE/O&M/Dr.NTTPS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
General Conditions- E procurement -2026-27.pdf
TENDER_DOCUMENT • 10.25 MB
Notice.doc
TENDER_DOCUMENT • 0.06 MB
Schedula.xlsx
TENDER_DOCUMENT • 0.69 MB
specification.doc
TENDER_DOCUMENT • 0.67 MB
undertaking.docx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .