Loading…
Loading…
1,705 results • Best match
Estimate for internal clearance and jungle clearance of Saraswati Disty. from RD. 30800-77500 for Rabi crops season 2025-26
remodeling/ rehabilitation for lining of watercourse at O/L RD 9020/9080 R Bhaklana Minor for successful cultivation of crops.
Laying underground HDPE pipeline for Dewatering of Accumulated flood/Rain water to protect Abadi area and Agriculture land in village uchana, Salaru, Kurali and Darar into at RD 58350 of WJC Main Branch in District Karnal.
Replacement of pipe with inlet at RD 0 of Sambhli link drain and outfall at RD 41500 of Nissing drain for safe guard the agriculture land of village Nissing, Brass, Sambhli, Prem Khera, Dhaula Kuan etc.
Flood scheme for laying pipeline alongwith construction of pump house to drain out the flood water from village theh barela (Pai) to dispose into BML-HB-BB-MPLC to protect the agriculture land of Theh Barela
protection of agriculture land Of Village Jauli
protection of agriculture land of Lath Village
Lowering the ground water table from the agricultural land
Engine overhauling kit swaraj 735, Fuel overhauling kit swaraj 735, Complete head assessories overhauling, Overhauling of centrifugal pump, Overhauling of 10 HP Electric Motor
Construction of Permanent Pump House of discharge 10 Cs. at RD 3415/L Sultanpur Minor with 02 Nos. VT Pump having discharge 5 Cs. each to safeguard 200 Acre Agricultural Land of Village Bhaini Kalan against flood water (Civil Work).
provide manpower relating to Chowkidar and Agricultural Farm labor etc. in the University on contract basis under Part-1 of Haryana Govt. Outsourcing Policy for a period of one year commencing from 01.07.2020 onwards to MHU, Karnal and its RRC
Construction of Permanent Pump House of discharge 10 Cs. at RD Km 4.28 Left of Munak Canal with 2 Nos. V.T pumps having discharge 5 Cs. each to safeguard 180 Acre Agricultural land of village Gagsina against flood water (Civil Work).
Shade Nets for Agriculture and Horticulture as per IS 16008 (Part 2) (Shade Nets Made from Mono Filament Yarns) (Q3), Decorative Mats - Mat Door Coir (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of ... for Agriculture and ...
Creation of 2847 No HPole and providing of new transformers for AP Connections under VDS Scheme (Agriculture) by installing of New Transformers/11 kV line/ LT line/ Augmentation of Transformers in the jurisdiction of operation Kaithal Circle.
Flood scheme for Reconstruction of V.R. Bridge by replacing pipe culvert into slab at RD 116300 and 119600 of Amin Drain to protect the abadi area as well as agriculture land of various villages from flood water
Special repair of road from Hansi Agriculture Farm Road (Dhani Pal Road) by providing widening and Strengthening of road in KM 0.00 to 3.25 (Road ID 5306) in Hisar District. (Pdg. Shifting of HT/LT Lines only)
Auction of Damaged Wheat at Gohana Centre of the crop year 2019-20
Construction of Farmers Hostel and all other works contingent thereto at Horticulture Research center Chandsoli , Disstt. Ambala.
SR of road and Parking behind Shop No. 145 to 163, Road from Janta Colony road to Mandi Gate, Road from FCI Godown to Dabua Colony, Development of Parking between Gate No. 2 and 3, P/L of IPB and Installation of Tubewell in Kisan RH, P/L of IPB near
Bed Sheet, Photo frames, Quilt Double bed, Agro Net Green, Budha statue, Bathrobes (Gown), Towel large
P and F of Practice Net for Cricket Pitch in Kisan Bhawan, Sector-14, Panchkula
Protection of Agriculture Land OF VILLAGE SIKANDERPUR MAJRA
778Retender Mang. Disposal of waste water after treatment by applying constructed wetland technology reuse of treated waste by laying pipline in agriculture purpose with 5 years O and M of the project after completion Village Joshi Block Matlauda
801Retender Manag.Disposal of waste water after treat. by applying const. wet. tech. including reuse of treated water by laying Pipleline in agriculture purposes with 5 year OandM of the project after comp. Vill. Kawi Block Matlauda Distt. Panipat.
Creation of 3631 No. H-Pole and providing of new transformers for AP Connections under VDS Scheme (Agriculture) by installing of New Transformers/11 kV line/ LT line/ Augmentation of Transformers in the jurisdiction of operation Karnal Circle.
Constructing 1744ft (760 ft three tier plus 224 three tier plus 760 double tier) steining for the protection of abadi and agriculture land of village Batwal and village Raipur Rani from river Dangri after flood 2024(Short terms)
Creation of H-Pole and providing of new transformers for AP Connections under VDS Scheme (Agriculture) by installing of New Transformers/11 kV line/ LT line/ Augmentation of Transformers in the jurisdiction of 5 no. Operation Circles unde
Protection of agricultural land from fields of Village Khanpur Kalan
Protection of agricultural land OF LATH VILLAGE TO RABRA ROAD
Supply of 70 Percent Agriculture Grade Gypsum as per IS 6046-2023 packed in HDPE Bag of 50 kg as per IS 9755- 2021 on F.O.R and consignment basis for the financial year 2026-27.
HDPE pipe line dewatering for easily and timely saving the crops from flood water which is accumulated during the every rainy season
Renovation of Agriculture Colony B type and D type Quarters, Repair of of Internal Roads and Gates in Agriculture Department, Sector-21, Panchkula
Installation of 02 No. 10 Cs. VT Pump and 01 No. 05 Cs. VT Pump at RD 67500 R of Sirsa Branch to protect the abadi and agriculture land of villages Abla and Abli etc. in W.S. Mech. Kurukshetra.
Balance work for Construction of CFSL Laboratory and Administrative Block at 2nd Floor in Agro Mall, Panchkula
HDPE pipe line dewatering for easily and timely for saving the crops from flood water which is accumulated during the every rain season
Providing electricity supply to agricultural meteorology field lab at RRS Kaul
Tender for supply of Pesticides / Weedicide / Insecticides/ Bio-Fertilizer on Consignment basis for sale during Rabi 2019-20
Jungle and slush clearance of Dabalu Minor from RD. 0 to 33500 before Rabi Crop.
Estimate for laying RCC NP-3 pipeline in a length of 6000 ft. with construction of sumpwell and provision of 2 No. submersible pumps for purpose of dewatering flood water from abadi area and agricultural land from Bagru to RD 24600 of East Juan Drai
Construction of Permanent Pump House of discharge 25 Cs. at RD 95660/R of Nardak Distributary with 2 Nos. VT pump having discharge 10 Cs. each and 1 No. VT Pump having discharge 5 Cs. to safeguard 400 Acres Agricultural land of village Gondar Dacher
for protection of Abadi and Agriculture land from flood water
PROTECTION OF ABADI AND AGRICULTURAL LAND OF VILLAGE BHUNNI FROM FLOOD WATER
PROTECTION OF ABADI DURING FLOOD SEASONS AND DEWATERING FRON THE AGRICULTURAL LANDAREA
Final Estimate of Maints. of Plantation Work under Dev. of Agro Forestry Clonal and Non-Clonal Scheme (Inst. Land)
Repair renovation refurbishment of Lab. No. 177 (Plant Pathology) U.G. Lab. No. 237 (Horticulture) and renovation of lecture room Nos. 3, 8, 11, 12, 13 and 15 in the premises of College of Agriculture at CCS HAU, Hisar (Under NAHEP-IDP project)
Constructing 1360 ft (760 ft plus 100 ft plus 100 ft plus 100 ft plus 300 ft) double tier steining for the protection of Shamshan Ghat, Abadi area and agriculture land of village Bharauli Kaindaiwala from river Talan wali nadi after flood 2022.
Installation of 02 Nos. 10 Cs. VT Pump and 01 No. 05 Cs. VT Pump at RD 52500 R of Sirsa Branch to protect the abadi and agriculture land of village Barthal, Khwaja Ahemdpur, Sidhpur and Anjanthali etc. in W.S. Mech. Kurukshetra.
To drain out the flood water during rainy season and save the crop and abadi area.
to drain out the flood water during rainy season to save the crop and abadi area
PROVIDING 300 FEET STONE STEINING FOR THE PROTECTION OF AGRICULTURE LAND,PUCCA STRUCTURE AND TUBWEL OF VILLAGE SANGIPUR AGRICULTURE LAND,PUCCA STRUCTURE AND TUBEWELL OF VILLAGE SANGIPUR