Loading…
Loading…
1,435 results • Best match
ANNUAL MAINTENANCE CONTRACT (AMC) OF AIR CONDITIONERS AT HBL SUGAULI PLANT, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
Hitachi 1.5 Ton 5 Star Kaze Plus RAW518KUDZ1 Window Air Conditioner(2017 Model)
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2), Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
Custom Bid for Services - Annual Comprehensive Maintenance Contract for VRF Air conditioning system installed at RHQ office Transit Camp Community Center and Karbighaiya Township RC building of ER1 Patna Similar Category ANNUAL MAINTENANCE SERVICE ... Centralised air conditioning system ... And Air Conditioning System)
Supply, Installation, Testing, Commissioning (SITC) of HVAC (Air-conditioning) Systems with VRF/VRV and DX Systems at Sub- Regional Science Centre, Bodhgaya (Bihar)
ANNUAL RATE CONTRACT (ARC) FOR OPERATION AND MAINTENANCE OF HVAC, PRESSURIZATION SYSTEM AND PACKAGE AIR CONDITIONERS AT HURL BARAUNI
PROVIDING ANNUAL MAINTENANCE CONTRACT (AMC) OF AIR CONDITIONERS AT HBL PLANT SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR
Misc. Electrical works and Provision of AC units in Transit Accommodation at Taylor Road, Patna
Custom Bid for Services - PACKAGE AIR CONDITIONING SYSTEM PAC MAINTENANCE OF CHP FOR FY 202325 NTPC BARH
Air Conditioning of IRIMEE, SGH hostel along with augmentation of transformer capacity and supporting infrastructure at Jamalpur
Repair and Overhauling Service - Window Air Conditioner including Green AC; Voltas; Yes; Buyer Premises
Air Conditioner-IS 1391 ( PAC Only ) Bidder Turnover (Last 3 Years) 6 Lakh (s)
SUPPLY OF COMPRESSORS FOR AIR CONDITIONER ON DOOR DELIVERY BASIS AT HBL PLANT LAURIYA
Procurement of ductable Air Conditioner Capacity 11TR with floor mounted AHU and Outdoor Unit
Procurement of Crossover switch (IS/IEC 60947-3:1999) for cabin air conditioner system.
Annual Comprehensive Maintenance of Air Conditioners and water Cooler cum purifier for the year 2022 2025 at Gaya Airport Gaya
Provision of Standby Tower AC for Equipment Room in New Technical block at JPNI Airport Patna
REPAIR/MAINTANANCE OF HANGER LIGHT,WATER SUPPLY STARTER PANNEL AND AIR CONDITIONERS,REFRIGERATION,WATER COOLERS AND ALLIED WORKS AT AFS PURNEA UNDER AGE (I) (AF) PURNEA
Electrical renovation of outer face of DRM building shifting of cable and AC units at Samastipur.
Supply, Installation, Testing & Commissioning Of Window Air Conditioner At Barauni Refinery ( 3 pieces ) Brand Type Unbranded, Supply, Installation, Testing & Commissioning Of 4TR Tower Air Conditioner At Barauni Refinery ( 1 set ) Brand Type Unbranded
SUPPLY OF AIR CONDITIONING MATERIAL ON F.O.R / DOOR DELIVERY AND CALLUP BASIS AT HBL PLANT SUGAULI AND LAURIYA
Design, Engineering, Supply, Installation and Commissioning of VRF Based Air Conditioning System for Hospital IPD Area at Nabinagar
Provision of Modern Air Conditioning Solutions to Improve Workplace Comfort and Energy Efficiency at the DRM Building, Katihar.
Repair and Overhauling Service - Window Air Conditioner Including Green Ac (DFM); Voltas; Yes; Buyer Premises
Entry and Mid Level Laptop - Notebook (Q2), Computer Printer (V2) (Q2), Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Entry and Mid Level Desktop Computer (Q2)
Window AC 1.5 Ton and 5 star complete with all accessories. Make:- LLOYD/HITACHI/LG/VOLTAS/BLUE STAR
Providing air conditioning unit for positive pressure and negative pressure in isolation room of ICU, 6th floor AIIMS Patna
Provision of Split AC Fans and allied works for New Cargo Terminal Building at JPNI Airport Patna
Non-inverter type Split AC star rating from 3 star to 5 star, having capacity 1.5 ton
REPLACEMENT/REPAIR OF AC ROOF SHEET AND CONNECTED ITEMS GAYA
Renovation of Lounge at 6th Floor Meghdoot Bhawan, Patna (SH Provision of Illumination, AC units and allied works)
Hiring of Boats - Survey Boat; Less than 5 years; Without Air-Conditioning; 20; 40; As per Reqired; Steel/Wood; Repair kit, Lifebuoys, Rescue Life Jackets, 12 Volt Heavy Duty Battery, First Aid Box, Safety Hand Lamp; Buyer, Hiring of Boats - Survey ... Without Air - ... Air- Conditioning ; ... Without Air - ... Air- Conditioning ; ... Without Air - ... Air- Conditioning ; ... Without Air -Conditioning; ... Air- Conditioning ; ... Without Air -Conditioning; ... Air- Conditioning ; ...
Custom Bid for Services - Single Tender from Ms Unitek Engineers Patna for Operations of HVAC Heating Ventilation and Air Conditioning
Construction of MSSR Katihar SH - SITC of Precision type Air-conditioning including AICMC for 5 Years (after 2 years DLP).
Hiring of Boats - Country Boat; Less than 5 years; Without Air-Conditioning; 4-6 Persons; 60; Outboard; Wood; Lifebuoys; Service Provider
Hiring of Boats - Survey Boat; Less than 10 years; Without Air-Conditioning; 7-10 Persons; 80; Outboard; Steel; Lifebuoys, Raincoat Gum Boot; Service Provider
SITC AC including supply of AC installation copper pipe cable
AIR CONDITIONER ROUND COPPER TUBE-1/2 INCH. (HEAAVY DUTY ) MAKE-NATIONAL /BHARAT OR SIMILAR Accepted Make: National
Custom Bid for Services - 200134381 Biennial Job Contract for Operation and Maintenance of Air Conditioning and Ventilation system HVAC at NTPC BARH
Air Conditioner Experience with Gov. Required 1 Year (s) Air Conditioner ( 78 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Inverter (Variable Speed) Inverter (Variable Speed) Nominal cooling capacity in Ton (kcal/hr) 2.0 Ton/6000 kcal/hr 2.0 Ton/6000 kcal/hr Coil Material Copper Copper Eco-friendly refrigerant true true Yes is better Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 3 metre - Packing LIst PRINTED - Any other Features NA - CONFORMITY CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest - WARRANTY Warranty on 1 1.0 1/3 Machine Warranty on Compressor 5 5.0 Higher is better INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Sanjay Prasad Yadav 841101, Office of DRM East Central Railway, Sonpur-841101, SARAN, 841101 78 15
Air Conditioner Experience with Gov. Required 1 Year (s) Air Conditioner ( 50 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Inverter (Variable Speed) Inverter (Variable Speed) Nominal cooling capacity in Ton (kcal/hr) 1.5 Ton/4500 kcal/hr 1.5 Ton/4500 kcal/hr Coil Material Copper Copper Eco-friendly refrigerant true true Yes is better Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 3 metre - Packing LIst Remote control - Any other Features none - CONFORMITY CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest - WARRANTY Warranty on 1 1.0 1/3 Machine Warranty on Compressor 10 10.0 Higher is better INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Bimlesh Prasad Singh 841101, Office of DRM East Central Railway, Sonpur-841101, SARAN, 841101 50 15
Comprehensive Annual Maintenance and Service contract for Window/Split/Cassette/Tower type air conditioners and water coolers installed at different locations at Barauni Refinery Township.
Dual motor run capacitor for Air Conditioner capacity 50+4 MFD, 440 VAC, 50 Hz, as per IS- 2993
Supply, Installation, Testing and Commissioning (SITC) of LED Signage Board, Split AC, Stabilizer and Curtains for ITBP SHQ Patna, Bihar
1.5 Ton 5 Star High wall Split AC (Hot and Cold). GeM Product Id: 5116877-88726394610. Make: Hitachi/Carrier/Voltas
STANDING ORDER/RATE CONTRACT FOR SUPPLY OF AIR CONDITIONING MATERIAL ON DOOR DELIVERY AND CALLUP BASIS AT HBL PLANT SUGAULI, EAST CHAMPARAN, BIHAR.
SUPPLY OF AIR CONDITIONING MATERIAL ON F.O.R / DOOR DELIVERY AND CALLUP BASIS AT HBL PLANT SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR
SUPPLY AND INSTALLATION OF SPLIT AC 1.5 TON 5 STAR (Q3), SUPPLY AND INSTALLATION OF SPLIT AC 2 TON 5 STAR (Q3), SUPPLY AND INSTALLATIO OF WATER COOLER 40/80 LITRE (Q3), SUPPLY INSTALLATION OF HORIZONTAL DEEP FREEZER 320 LITRE (Q3), SUPPLY AND INSTALLATION OF HORIZONTAL DEEP FREEZER 425 LITRE (Q3), SUPPLY AND INSTALLATION OF REFRIGERATOR SINGLE DOOR 190 LITRE 5 STAR (Q3), SUPPLY AND INSTALLATION OF REFRIGERATOR 310 LITRE 3 STAR (Q3), SUPPLY AND INSTALLATION OF REFRIGERATOR DOUBLE DOOR 345 LITRE 3 STAR (Q3)
Repair and Overhauling Service - 2 TR VERTICAL SLIP ON TYPE AIR CONDITIONER WITH 3KW HEATER (SR60MG); MAK; Yes; Buyer Premises
Repair and renovation of CGWB at 6th & 7th floor at Lok Nayak Bhawan, Patna. (SH:- Providing EI and Air conditioner)