Loading…
Loading…
7,359 results • Best match
Servicing and overhauling of different type Air Conditioner of different buildings at Dongaria under A.A.A. surface based water supply project in S.24pghs District under South 24pgs Mechanical Division, PHE Dte.
Supplying, installation, testing and commissioning of 2nos. 1.5ton split type 3star (100 percent copper) inverter type room air conditioner machine in Room No 64, Department of Psychology, 2nd floor, Palit Building ....
Annual Maintenance contract for the entire Electrical Installation (BplusGplus4) storied building of West Bengal Urdu Academy Kolkata-16 ---Annual Comprehensive Maintenance of Room Air Conditioner machines at West Bengal Urdu Academy.
Addition alteration of PICU for treating Pediatric Patients during upcoming third wave of Covid 19 Pandemic AC installation work
Split phase induction motor, BLDC motor with controller, IDU Pulse Generation type motor, Capacitor start induction motor, AC 3 Phase motor 40050 Hz, Star delta starter, Auto Transformer starter, DOL Starter, Portable air LPG brazing kit, ... cylinder, Window AC , ... AC, Split AC , ... able split AC 15 ... Cassette Air conditioner , ...
Annual Comprehensive Servicing and Preventive Mtc of Split and Ductable type concealed Split type AC units installed at Serampore Sub Divisional Court, DLSA Building and Office of the Joint Commissioner, Commercial Taxes, Serampore
Construction of Income tax Appellellate Tribunal (B G 3) at New Town, kolkata. SH: Construction of Office cum training Centre Block,Service Station & Fire Pump Room including Pile Work, Water Supply, Sanitary Installation, Drainage Work,internal & ... VRF Air Conditioning System, ...
Annual Comprehensive maintenance of 1.5/2 Ton capacity window /split type, 4 ton Casset type AIR CONDITIONERS machines install at DM Office, Circuit House, DM Bunglow, ADM(D) Bunglow, ADM(G) Bunglow, Tresury I,Tresry II, ADM (DL and LRO)
Shifting of 7.5 TR, 5 TR Ductable split Air Conditioners at Green Room ( Gents Ladies) in hall -1 1st and 2nd floor of Sarat Sadan Project Office respectively including copper pipping, fittings, jonting of cables and other allied works for Sad
Supply, delivery installation 3 star non inverter split type air conditioning machines and allied electrical works for different officers chamber of West Bengal Valuation Board at Poura Prasasan Bhavan by Central Mechanical Division under UDMA dep.
SUPPLY, DELIVERY AND INSTALLATIONS OF 2NOS., 2.0 TON AND 1NO., 1.5 TON SPLIT TYPE AIR-CONDITIONING MACHINES AND OTHER ALLIED ELECTRICAL WORKS AT REPORTING SECTION (ROOM NO.202) AND SERGENTS DESK OF CMO BUILDING, UNDER KMC.
Renovation of Electrical installation works including air conditioning system of Civil Defence Central Sub Area Kolkata located at 8th Camac Street Shantiniketan Building 9th floor Room No 903 under GC Avenue Electrical Section PWD. EI Portion
AMC Estimate of the Electrical Installation of Main Building, Annex Building-I and Annex Building-II within Sales Tax Complex, Beliaghata for the year 2024 - 2025.Annual Comprehensive and preventive maintenance of Split Air Conditioning machines
Erection of partition wall and reconstruction of false ceiling to facilitate air conditioning system at the Honble Judges Corridor and adjacent lift lobby from 2nd floor to 8th floor at Sesqui Centenary Building, High Court, Calcutta
Annual Maintenance Service Contract for Air Conditioning System Equipments for 175 Nos. different capacity Split, Window and Ductable type A.C. Machines located at Annexe Building, Collector Building and Town Hall Building, HMC, 4, M.G.Road, Howrah-7
SITC of Air Conditioning system with allied E.I. work and repair and renovation of electrical installations for PG new Work Stations and Departmental Room at administrative building of the Calcutta Homoeopathic Medical College and Hospital, Kolkata.
Renovation of Electrical Installation work and Air-conditioning arrangement for the proposed newly made chamber after bifurcation the chamber of Additional Secretary of the Labour Department, West Bengal at 12th floor of Block -A, New Secretariat
Renovation work of electrical installation in existing Ward in Bidhan Block to 20 Bed SARI HDU and 40 Bed SARI Step Down ward for Covid -19 Patient at MMCH, Paschim Medinipur.--- SITC of Air-Conditioning System
Setting up of two(2) nos. dedicated Commercial Courts at 7th floor of City Civil Court Building, Kolkata -Electrical Renovation Work, arrangement of Air-conditioning, Fire Detection system, Modernization/ replacement of existing 2nos. old Lifts, Misc
Setting up of two(2) nos. dedicated Commercial Courts at 7th floor of City Civil Court Building, Kolkata-Electrical Renovation Work, arrangement of Air-conditioning, Fire Detection system, Modernization/ replacement of existing 2nos. old Lifts, Misc.
Renovation to Electrical Installation work, arrangement of Air-conditioning system and allied works at additional space newly allotted to the High Court Cases Monitoring cell (SARTHAC) at 2nd floor of Protocol Building of High court, Calcutta.
Setting up of two(2) nos. dedicated Commercial Courts at 7th floor of City Civil Court Building, Kolkata-Electrical Renovation Work, arrangement of Air-conditioning, Fire Detection system, Modernization/ replacement of existing 2nos. old Lifts, Misc.
Installation of 02 (two) Air-Conditioning Machines including necessary electrical installation work in Establishment Section and Monitoring Unit of the Directorate of Anti-Corruption Branch at 9th floor of Block-A of New Sectt. Bldg, Kolkata.
Electrical installation work incl. SITC of Air conditioning machine at proposed converted X-ray room and CR room, previously named as Sample collection or store room and Injection room respectively at Katwa SD Hospital, Purba Bardhaman.
Emergency demolition restoration work at Bikash Bhawan Dismantling of existing Split and Cassettee type air conditioning ODU unit including installation at window lebel after repairing the same with necessary arrangement at Ground to 5th Floor of
Air conditioning the Legislative Section Miscellaneous Technical Section Question Section Type Section and Chamber of the Assistant Secretary situated in the first floor of the North Annex Building of WBLA at Assembly House Kolkata EI Work
E I work for renovation and remodelling of eight floor to accommodate the chamber and office of Hon ble MIC and secretary at Aranya Bhawan Sector III Salt Lake Kolkata 700106 SITC of Air Conditioning Machines
Necessary Civil work in connection with the electrical work Replacement of 40 Tr and 20 Tr Old air conditioning Chiller plant at department of virology, STM Building (4th floor) under School of Troipical Medicine, Kolkata..Etc
Annual Maintenance Service Contract for Air Conditioning System Equipments for 179 Nos. different capacity Split, Window and Ductable type A.C. Machines located at Annexe Building, Collector Building and Town Hall Building, HMC, 4, M.G.Road, Howrah-7
Supply, Delivery, Installation, Testing and Commissioning of VRF Type Air Conditioning System and allied works for the additional Four floor at existing B G IV storied Nabadiganta Administrative Building, Salt Lake, GN-20-23, Industrial Township
Supply delivery installation testing commissioning of 28 nos new air conditioning machine split type not less than 3 star continuous rating Capacity 2 TR 100 copper condenser complete with all accessories at Purulia 132 KV SubStation
Annual repair Maintenance and Operation in respect of EM Services through outsourcing basis for offices and irrigation colonies including provision of supplying of some EM materials and servicing of Air Conditioning Geyser etc required for day
AMC for running maintenance of elec.l inst. at Kakdwip Office campus, Colony, Rest shed,outdoor lighting arrangements including all installed different capacity and make Air conditioning machines (13 Nos)..at Kakdwip Irrigation Office during 2024-25
Installation of Air-conditioning and allied Electrical installation work along with reorientation of Directorate of Co-Operative Audit, 3rd floor, Block A, B, Khadya Bhawan Campus, 11A, Mirza Ghalib Street, Kolkata - 700087 SITC of AC Machines.
Annual repair Maintenance and Operation in respect of EM Services through outsourcing basis for offices and irrigation colonies including provision of supplying of some EM materials and servicing of Air Conditioning Geyser etc required for day
AMC for maintenance of electrical installation at Diamond Harbour Bungalow and Sub-Division Office incl all installed different capacity and make Air conditioning machines (12 Nos) with supply and delivery...during 2023-24 (01.04.2023 to 31.03.2024)
Annual repair Maintenance Operation in respect of EM Services through out soucing basis for offices and irrigation colonies including provision of supplying of some EM materials and servicing of Air Conditioning Geyser etc required for day
Day to day Comprehensive routine and preventive maintenance and operation of different Air-conditioning system installed at Egra SD Hospital, SDO offices, PWD Offices, Inspection Bungalow and other Govt. buildings at Egra and Digha, Purba Medinipur.
Supply, Delivery and Installation of Air Conditioning Machine for Block Primary Health Units (BPHU) at Labpur, Dubrajpur, Md. Bazar, Bolpur, Nanoor, Rajnagar and Khayrasole under XV FC-HG (FY 2021-22, 2022-23), Birbhum Health District
Special Repair and renovation of Electrical Installation and Air-Conditioning work at office chamber of Superintending Engineer at Kolkata Health Circle , P.W.Dte at KIT Building , 1st Floor, P-16, India Exchange Place , Kolkata-73----- EI Work
Comprehensive AMC and servicing including gas charging , all types of spare parts for indoor , outdoor and pipe line of Different types of Air conditioning machine in Batabari, Tilottama, Moorti, and Aranya Tourism Property in different district.
Installation of Air Conditioning System and allied E.I. Works at different office Chambers under Superintending Engineer, Planning and Monitoring Circle, P.W.Dte, 9th Floor, New Off Complx Bldg, Bhawani Bhawan, W.B. Alipore, Kolkata--27 S-EI Works.
SUPPLY, DELIVERY AND INSTALLATIONS OF 1NO., 1.0 TON AND 1NO., 2.0 TON SPLIT TYPE AIR-CONDITIONING MACHINES AND OTHER ELECTRICAL WORKS AT IFU OF D.G.(BUILDING), AND FACC (ROOM NO.-222) OF CMO BUILDING UNDER KMC.
Electrical Installation work including arrangement of Air-conditioning in respect of setting-up of one permanent VWDC (Vulnerable Witness Deposition Court) centre for the City Civil Court, Calcutta at 3rd floor of City Civil Court Building.
Annual Comprehensive Maintenance of Window ,Split, Cassete an Tower types of air conditioning system Installed at different sites of Suri Electrical Sub division , section -II under Birbhum Electrical Division ,PWD (For the period of One year
SITC of Air Conditioning Machines including allied electrical installation work at the Paediatric OPD within the Sadar Campus of Deben Mahato Government Medical College and Hospital_ Purulia in the District of Purulia_Electrical Work_ Project ID HF23
Annual maintenance for repairing and overhauling of the different Air Conditioning Machines installed at Different Water Sample Collection Center Cum Water Testing Laboratory and Rest Shed in the district of Uttar Dinajpur and Dakshin Dinajpur within
Comprehensive AMC and servicing including gas charging , all types of spare parts for indoor , outdoor and pipe line of Different types of Air conditioning machine in Sagorika, Balutot, Gangasagar, Matla TP, in the district of S24Pgs.
Replacement of stand AC machine by Supply, delivery , installation 3 star non-inverter split type air-conditioning machines and allied electrical works for ULC section and Non Resident cell at Nagarayan building by Central Mechanical Division ..
Annual maintenance, operation and repair of electrical installations, air conditioning, lift installation etc. at Pavlov Hospital under central Kolkata Health electrical division, PWD for FY-2024-25. - Day-to-day round the clock operation of elevator