Loading…
Loading…
1,883 results • Best match
Deployment of 21 no of unarmed guards for manning the shift round the clock for enforcement of apron discipline and monitoring of wildlife activity in newly constructed apron and taxiways at NSCBI Airport Kolkata
Construction of Standard Operation Boundary Wall on backside of Line Maintenance Building and beside International Cargo in place of old damaged boundary wall and temporary fencing for CISF KOTE area at NSCBI Airport, Kolkata.
Maintenance and repairing of front gate and allied works on Baguihati stackyard and quarter on KNI Avenue 5th K.M. (Airport bound flank) under Baguihati Highway Sub Division under under Barasat Highway Division No. - I
Garbage Disposal Contract at Bagdogra Airport.
Temporary electrical installation work at and around RCTC Helipad for VVIP programme under MES-IV PWD.
Carrying of water pouches from Baranagar-Kamarhati Joint WS Scheme to different Places i.e. Dum Dum Airport, Madinat-ul-Hujjaj and Haj Tower for Haj Operation -2023 (Phase-I and II) on and from 18.05.2023
Emergent repairing work of footpath at from 0.00 kmp. to 2.00 kmp. (Airport flank) on K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division no. I in the District of North 24 Parganas.
Maintenance of existing Horticulture features at community center, Children park, Entry Gate, Transit Guest House inside New Quarters Residential Complex, ATC Complex and FSTC Narayanpur at NSCBI Airport, Kolkata during 2023-24 and 2024-25.
Cleaning of Nayanjoli in between Newly constructed Park JHHILIKA from Bangoor to Dum Dum Park airport flank of K.N.I. Avenue under Barasat Highway Division No. - I in the District of North 24 Parganas. 2nd Call
Temporary Restoration with Precoated Bituminous materials from 6.20 k.m. to 6.85 k.m. (Airport Flank) of K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No.-I in the District of North 24 Parganas.
SPECIAL REPAIRS TO BLDG NO PB 5P ACCN OF MESS STAFF AT 17 CORPS OMC DAKSHINESWAR INCLUDING CERTAIN MINOR AND REVENUE WORKS AT 2CBPO 141 MC MF DET AT NSCBI AIRPORT UNDER GE (NORTH) KOLKATA
Maintenance of existing Horticulture features at community center, Children park, Entry Gate, Transit Guest House and Football Ground inside New Quarters Residential Complex, ATC Complex and FSTC Narayanpur at NSCBI Airport, Kolkata during 2020-21.
Maintenance of existing Horticulture features at community center, Children park, Entry Gate, Transit Guest House and Football Ground inside New Quarters Residential Complex, ATC Complex and FSTC Narayanpur at NSCBI Airport, Kolkata during 2021-22.
Construction of Pump Room for pumping rain water at chainage 7.95 kmp of K.N.I. Avenue (Airport bound flank) under Baguihati HW Sub-Div under Barasat HW Div No.I in the Dist of North 24 Pgs.
Appointment of Custom House Broker (CHB) for Custom Clearance of Consignments arriving by air at Kolkata Airport and Consignment arriving at Kolkata / Haldia Seaport Under the head of The West Bengal Power Development Corp. Ltd.
Dismantling and Repairing of Service Road Median at Dakshindari on Airport flank service road of K.N.I. Avenue under Baguihati Highway Sub-Divn. of Barasat Highway Division No-I in the Dist. of North 24 Parganas.
Customized AMC/CMC for Pre-owned Products - AMC of DELL ISILON NL 410 storage system and DELL EMC VXRAIL P57F for 2 years installed at Kolkata Airport Datacenter; DELL; Annual Maintenance Contract (AMC); Quarterly; No
Miscellaneous Capital C E Works Sub Head Construction of Fire Static Tank at Kolkata Airport at NSCBI Airport Kolkata
Rumble Strip Marking on both side of Jessore Road at chainage 14.10 kmp. near Airport English medium school under Baguihati Highway Sub Division under Barasat Highway Division No. - I, in the District of North 24 Parganas.
Renewing of M.S. Angel etc. and painting of Existing Hoarding structure near Airport Gate (Kolkata Flank) of K.N.I. Avenue under Baguihati HW Sub-Div of Barasat HW Div No.I in the Dist. of North 24 Pgs
Supplying completely closed metal body container truck or trailer on hiring basis for transporting check in bag of Haj Pilgrims 2022 from Madinat-ul-Hujjaj, Action Area II, New Town, Rajarhat, Kolkata 700160 to NSCBI Airport
Cleaning of road side Underground Drain from Golaghata to Laketown (AIRPORT bound traffic flank side) of K.N.I. Avenue under Baguihati Highway Sub- Division of Barasat Highway Division No.-I in the District of North 24 Parganas.
WBSO ENGG Fabrication, Installation, Calibration and Commissioning of 2 x 200 KL Semi Buried Tanks for ATF Facility and allied Civil Electrical and Mechanical Works towards re structuring of IOCL Bagdogra Aviation Fuelling Station Bagdogra Airport
Connecting of road side Hume Pipe Drain from 8.00 kmp. to 8.03 kmp. of K.N.I. Avenue (Airport bound flank) under Baguihati HW Sub-Div under Barasat HW Div No.I in the Dist of North 24 Pgs.
Pre monsoon cleaning of road side Underground Drain from Golaghata to Laketown (Airport bound traffic flank side) of K.N.I. Avenue under Baguihati HW SubDiv under Barasat HW Div No.I in the Dist of North 24 Pgs
Construction of Wooden Sanko and Mud house beside the office of HeliPad at Dumurjala, Khel Nagari, Howrah.
Temporary electrical installation and working light at around RCTC Helipad for VVIP Programme under MES-IV PWD
SWEET SHOP IN SHA AT BAGDOGRA AIRPORT
Canteen Facility
Temporary Restoration with Precoated Bituminous materials from 6.20 k.m. to 6.85 k.m. (Airport Flank Service road) of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No.- I in the District of North 24 Parganas.
Repairing work of footpath at from 0.00 kmp. to 1.50 kmp. (Airport bound flank service road) on K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No.-I, in the District of North 24 Pgs.
Restoration of Baguihati Highway Sub-Division office pathway and underground drain at airport flank service road of K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No.-I, in the District of North 24 Parganas.
Beautification work for emergency visit of G20 at Siliguri and Darjeeling from 1st April to 4th April 2023 (Tentetive) Bagdogra Airport to Mayfair Tea Resort, New Chamta, Siliguri and Mayfair Resort to Taj Chia Kutir Resort, Kurseong.
Pre monsoon cleaning of road side drain culvert etc. from 0.00 km. to 3.00 (Airport flank) of K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division no. I in the District of North 24 Parganas.
Cleaning and maintain the drain during the monsoon period from Haldiram Junction to Airport 1 no. of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No. - I in the District of North 24 Parganas.
Erection of temporary water proof pandals from Mint and Mirchi canteen to Jamat stall area for Heat mitigation arrangements old Domestic Terminal, Kolkata Airport for return journey of Haj Pilgrims related to the programme Haj Yatra 2024
Custom Bid for Services - Rate Contract for providing vehicle for transportation of imported consignments from Kolkata Sea Port Airport to RTPS DVC for a period of two years Similar Category Goods Transport Service – Per Trip based Service
Temporary electrical installation and working light at and around RCTC Helipad for VVIP programme under MES-IV PWD.
Beautification and transformation work including maintenance at Helipad Ground and Cricket Ground, Dumurjola Stadium, Howrah within H.M.C. area.
construction of Temporary Helipad of old Chemaguri Bus stand Parganas at Sagar Island for ensuing G.S Mela- 2021.
Construction of alternate Helipad road and Drainage work (Ch.-0.000 to Ch.-238.61) at KHEL NAGARI, DUMURJALA, HOWRAH.
Supplying of labours for Up-keeping, Scavenging of Helipad Rest Shed at Dumurjola during the year 2023-24.
Temporary electrical installation and working light at and around RCTC Helipad for VVIP programme under MES-IV PWD
AS PER BOQ
All as per BOQ
REPAIRING OF DAMAGED SURFACE OF PERIPHERALOVERFLOW LAUNDER AND SCRAPER BRIDGE RUNWAY OF MPST AT JAI HIND JAL PRAKALPA.
Fragrances Retail Shop in SHA at Bagdogra Airport.
Cleaning of road side land with necessary Temporary fencing with Bamboo and allied works near Laketown Airport Flank on K.N.I. AVENUE under Baguihati Highway Sub-Divn. of Barasat Highway Division No.I in the Dist. of North 24 Parganas.
Errection of temporary Kitchen cum dining space at different locations under New Town PS Electronic Complex EC PS Baguiati PS Airport PS Narayanpur PS Rajarhat PS of Bidhannagar Police Commissionerate for the accommodation and Logistic for CAPF S
Restoration of damages due to road cutting by CESC of Jessore Road (Paver Block Surface) near Airport 2.5 no. gate (Ch. 14.49 Kmp.) at Barasat bound Road under Baguihati Highway Sub-Division of Barasat Highway Division No.-I