Loading…
Loading…
3,136 results • Best match
Changing of Rotten Riser Pipe in I M II Drilled Tube Well with 32 mm Medium Class G I Riser Pipe and Connecting Rod on TURNKEY BASIS under D W and S Division CHATRA Gr No CTR RRP 01
Repair and maintenance (Ordinary Repair) of Existing Tube well by supplying labour, vehicle (including driver) with fuel and lubricant to be different rural sites etc. all complete work in Sub Division Senha for the year 2025-26 (Gr 2)
Construction of 200mm x 165mm x 280.00 M deep high yield Drilled Tube well, 5000 liters Capacity HDPE Water Storage Tank Installation Solar motor pump of 2.00 H.P. for Village- Talpahari, Panchayat- Murgadanga, Block- Hiranpur Group No HIR-04
Const. of Solor Pump Based High Yielding drilled tube well (HYDT) water suplly scheme in AWC At Barhait Block (1) PANCHAYAT - CHHUCHI VILLAGE JARIBEDO (2) PANCHAYAT -LABRI VILLAGE GILHA (3) PANCHAYAT - DORAI SANTHALI VILLAGE BARA DORAI PAHAR (4) PANC
Installation of 01(One) no. deep tube well with Solar based pump set and overhead water tank of 2000 Ltr. capacity with steel structure at near Harzan Muhalla at Kanti Panchayat under CSR, DVC,Tilaiya Dam, T.K. Division Konar
Construction of Rural WSS with 1 HP DC Solar motor pump complete set and Deep Drilled Tube Well of 125/115 mm dia 60 mtrs deep and allied works for Tolas/Villages/Areas Under D.W.and S. Mech. Division, Chaibasa
CONSTRUCTION OF 125 X 115 MM DIA 120 M DEPTH EXTRA DEEP DRILLED TUBE WELL INST OF IM II HP 32 MM DIA GI PIPE WITH DRAIN AND PLATFORM ON TURNKEY BASIS GR EXTRA DEEP DT 120M CTR 03
CHANGING OF ROTTEN RISER PIPE IN IM II DRILLED TUBE WELL WITH 32 MM MEDIUM CLASS GI RISER PIPE AND CONNECTING ROD FOR DT IN DIFFERENT BLOCK OF CHATRA DISTRICT ON TURNKEY BASIS GR CTR RRP 06 2ND CALL
Const. of Solor Pump Based High Yielding drilled tube well (HYDT) water suplly scheme in AWC At PATHNA Block (1) PANCHAYAT - LAKHIPUR VILLAGE CHOTA MAHAGAMA (2) PANCHAYAT AND VILLAGE SHAHARI (3) PANCHAYAT SHIVA PAHAR VILLAGE AATHGAMA (4) PANCHAYAT AN
Construction of Rural WSS with 1 HP DC Solar motor pump complete set and Deep Drilled Tube Well of 125/115 mm dia 60 mtrs deep and allied works for Tolas/Villages/Areas Under D.W.and S. Mech. Division, Chaibasa
CONSTRUCTION OF 125 X 115 MM DIA 120 M DEPTH EXTRA DEEP DRILLED TUBE WELL INST OF IM II HP 32 MM DIA GI PIPE WITH DRAIN AND PLATFORM ON TURNKEY BASIS GR EXTRA DEEP DT 120M CTR 02
Changing of Rotten Riser Pipe in I M II Drilled Tube Well with 32 mm Medium Class G I Riser Pipe and Connecting Rod on TURNKEY BASIS under D W and S Division CHATRA Gr No CTR RRP 03
Construction of 200mm x165mm x250.00 M deep high yield Drilled Tube well, 2000 liters Capacity HDPE Water Storage Tank Installation of Electric Motor Pump of 2.00 H.P. at Residential Boys Athletics Sports Traning Center Cum Sports Hostel S.D. Stadi
Changing of 120 Nos. Tube well of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I. Cylinder etc. on turnkey basis for the year 2026-27 in Baliapur Block under D.W. and S. Division No-2, Dhanbad. (BAL/RRP2)
Changing of 110 Nos. Tube well of 32 mm dia Rotten Riser Pipe, Connecting rod C.I. Cylinder etc on turnkey basis for the year 2026-27 in Dhanbad Block under D.W. and S. Division No-2, Dhanbad. (DHN/RRP1)
Changing of 200 Nos. Tube well of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I. Cylinder etc. on turnkey basis for the year 2026-27 in Topchanchi Block under D.W. and S. Division No-2, Dhanbad. (TOP/RRP5)
Changing of 149 Nos. Tube well of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I. Cylinder etc. on turnkey basis for the year 2026-27 in Tundi Block under D.W. and S. Division No-2, Dhanbad. (TUN/RRP4)
CONSTRUCTION OF 125 X 115 MM DIA 120 M DEPTH EXTRA DEEP DRILLED TUBE WELL INST OF IM II HP 32 MM DIA GI PIPE WITH DRAIN AND PLATFORM ON TURNKEY BASIS GR EXTRA DEEP DT 120M CTR 01
Relocation of Defunct Tube Well of 125/115 mm dia, 60 Mtrs. Deep Drilled Tube Well with installation of India Mark-II
Relocation of Defunct Tube Well of 125/115 mm dia, 60 Mtrs. Deep Drilled Tube Well with installation of India Mark-II
Relocation of Defunct Tube Well of 125/115 mm dia, 60 Mtrs. Deep Drilled Tube Well with installation of India Mark-II
Relocation of Defunct Tube Well of 125/115 mm dia, 60 Mtrs. Deep Drilled Tube Well with installation of India Mark-II
Providing, installation and commissioning of handpump for drinking purpose in staff colony and hospital colony, Kathara under CSR scheme 2020-21 of Kathara area.
Repairing/ Rewinding of Delta ATS Starter 550V, 150HP in Beldariya Bore Hole Submersible Pump at Tetulmari Colliery Area-V
Installation of one No Hand Pump with solar submersible pump Platform and Drainage arrangement at Dadhu Panchayat Purnapani Balumath Distt Latehar Jharkhand Under the works Celebration of Bharat ka Amrut Mahatsova of CMPDI RI 3 Ranchi
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Medininagar for the year 2020-21
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark-II under D.W.and S. Division, Medininagar for the year 2025-26.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Garhwa for the year 2023-24.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Medininagar for the year 2023-24.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Medininagar for the year 2024-25.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Medininagar for the year 2021-22.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark- II under D.W.and S. Division, Medininagar for the year 2022-23.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment for spares of India Mark-II under D.W.and S. Division, Medininagar for the year 2025-26.
PROVN OF 02 BOREWELL AT TPT LINE UNIT AREA OF INF BN 3 8 GR 1 JAK LI AND 01 BOREWELL OF 200 MTRS ALONGWITH 15 HP SUBMERSIBLE CENTRIFUGAL PUMP AT 1 I R O FLT UNDER GE RANCHI
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-MAS/70-1)
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-13
Installation of 3 deep tube well with Solar based pump set and overhead water tank of 2000 Ltr. Capacity with steel structure at Dodhi Tola Adiwasi Basti of Barki Chidri village Lower Tla of Baadisimar Lalji Murmu, Harijan Tola of Nawatand
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - EDT-JAM/120-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-RAM/70-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAR/90-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-RAM/90-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - EDT-JAR-SAR/120-1)
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-8
Construction 50 Nos. of 125 mm dia x 115 mm dia x 90 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-3
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-DUM/70-1)
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-11
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-MAS/90-1)
Construction 50 Nos. of 125 mm dia x 115 mm dia x 90 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-4
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAM/70-1)
(SVS-01) BConstruction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS.