Loading…
Loading…
3,135 results • Best match
Relocation of 125 x 115 mm dia and 60 mtrs. deep drilled Tube-Well with installation of India Mark II hand pump, 32 mm dia G.I. medium class Riser Pipe by Truck Mounted D.T.H Rig machine/D.T.H. Rig Machine.
3 (Three) Nos of pilot NX Size boreholes from surface to Singpur Bottom Seam working of Satyapal and Co. for dewatering by installation of submersible pump by rimming after joining the Borehole with workings at Badjna Colliery.
Hoisting of burnt 6stage submersible pump motor set(two times)and lowering of repaired submersible pump motor set with cable at Dhaskapatti borehole along with erection 4inch dia domestic water supply MS pipeline under Phularitand, AMP Colliery.
Repairing reconditioning and maintenance of 02 nos. borewell including deepening replacement of worn out components lowering of Submersible pump and allied works under Sayal-D Project Barka-Sayal Area.
Const. of Solor Pump Based High Yielding drilled tube well (HYDT) water suplly scheme in AWC At Borio Block (1) PANCHAYAT - DURGA TOLA VILLAGE SIMALJORI (2) PANCHAYAT - BISHANPUR VILLAGE MURGABVANI (3) PANCHAYAT AND VILLAGE POAAL (4) PANCHAYAT - MOTI
Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set and Deep T/W of 125/115mm Dia, 90 mtrs deep Drilled Tube Well for block - kuchai, Panchayat - rugudih, Village -rugudihi, Tola - simarpani
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-05 (100 Nos)
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-04 (100 Nos)
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-08 (100 Nos)
Repair and maintenance (Ordinary Repair) of Existing Tube well by supplying labour, vehicle (including driver) with fuel and lubricant to be different rural sites etc. all complete work in Sub Division Kuru for the year 2025-26.(Gr3)
Construction of 90 mtr Deep drilled tube well RCC Foundation for steel Structure and Solar panel Galvanized tubular steel structure 5000 liters water storage tank Laying of Rising and distribution pipe etc work at Chaplasi Village, Bhandaria Block
Const. of Solor Pump Based High Yielding drilled tube well (HYDT) water suplly scheme in AWC At Mandro Block (1) PANCHAYAT - AMBADIHA VILLAGE SHBOTA BETONA (2) PANCHAYAT - DAMIN BHITHA VILLAGE PHULBHANGA (3) PANCHAYAT -BASHAHA VILLAGE PARAIYA (4) PA
Const. of Solor Pump Based High Yielding drilled tube well (HYDT) water suplly scheme in AWC At UDHWA Block (1) PANCHAYAT - EAST UDHWA VILLAGE UDHWA (PART) (2) PANCHAYAT - SOUTH PALASGACHHI VILLAGE PALASGACHHI (PART) (3) PANCHAYAT AND VILLAGE AMANA
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-01 (100 Nos)
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-07 (100 Nos)
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-06 (100 Nos)
Changing of 32mm dia GI Rotten Riser Pipe, Connecting Rod CI Cylinder of Drilled Tube Well India Mark-II under D W and S Division Garhwa for the year 2026-27 (1st Call) Group No-09 (93 Nos)
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
construction of 125 115 mm dia with 70m 90m 120m deep tubewell
CONNECTING ROD 3 MITERS LONG WITH COUPLING AND NUT, UPPER VALVE ASSEMBLY COMPLETE SET FIR IM II, LOWER VALVE ASSEMBLY COMPLETE SET FOR IM II, BALL BEARING 6204Z, PLUNGER ROD S S FOR MARK II, WASHER FOR HANDLE AXLE 4MM THICK, CHECK VALVE LEATHER ... FOR HANDPUMP , ...
Repairs of Toilets, construction of Over Head Tank, Deep borewell inVarious Schools in Hzaribagh District as part of Swachh Vidyalaya Abhiyan Package-3.
Repairs of Toilets, construction of Over Head Tank, Deep borewell inVarious Schools in Hzaribagh District as part of Swachh Vidyalaya Abhiyan Package-5.
Day to day water supply pipe line and sanitary installation of the financial year 2020-2021 at MRW colony and MRW Agent Office and repair and maintenance of 04 nos. of Hand pump under MRW.
Supplying of Spare Parts of India Mark II and III deep well hand pump conforming to IS 9301 1990 with latest amendment (may be read along with 1st amendment to IS 15500(Part 18) 2004
Supply of Spare parts of deep well hand pump India Mark-II with latest amendment for spares of India Mark-II under D W and S Division Garhwa for the year 2025-26 (1st Call)
Hydraulic Puller Assembly for Pulling of Fan and Ball Bearing of BKBL (for EMD Loco) :- (1) Hydraullic jack W.Cap 10 tons, stroke 100mm, Qty-01no. (2) Hydraulic Hand Pump single action W.P 700 Bar. Qt
AMC for borewell repair of Tapin South Colony under TSOCP of Hazaribagh Area for Two years
Flushing of 02 Nos. existing borewell in Topa Composite Colony under Topa Project of Kuju Area.
Construction of toilet, boundary wall and deep borewell in different schools under Magadh-Sanghmitra Area (CSR)
Lifting and lowering of submersible pump in to existing borewell for water supply in Urjanagar colony
Provision of new submersible pump motor set in proposed new borewell at Koderma PO premises, Jharkhand.
Construction of Gravel Packed tube well of 300x125mm dia x60mtr (A.V) depth Complete ( By Mechanical Rotary Rig Machine with mud pump mounted on Truck) and D.T.H Rig Machine with Installation of INDIA Mark-II Hand Pump with drain, platform under und
Construction of Gravel Packed tube well of 300 x125mm dia x 60 mtr( Av.) depth Complete (By Mechanical Rotary Rig Machine With mud pump mounted on Truck) and D.T.H. Rig machine with installation of INDIA Mark-II Hand Pump with drain,
Construction of Gravel Packed tube well of 300x125mm dia and 60 mtrs. (av.) depth complete (by Mechanical Rotary Rig Machine with mud pump mountain Truck) and D.T.H. Rig machine with installation of India Mark-II hand pump, Construction of platform
Construction of Gravel Packed tube well of 300x125mm dia and 60 mtrs. (av.) depth complete (by Mechanical Rotary Rig Machine with mud pump mountain Truck) and D.T.H. Rig machine with installation of India Mark-II hand pump, Construction of platform
Construction of Gravel Packed tube well of 300x125mm dia x60mtr (A.V) depth Complete ( By Mechanical Rotary Rig Machine with mud pump mounted on Truck) and D.T.H Rig Machine with Installation of INDIA Mark-II Hand Pump with drain, platform under und