Loading…
Loading…
3,136 results • Best match
Construction of 2HP Electric Motor Pump At- AAM Khadu Tola, Block- Maheshpur, in Exiting borewell and Plumbing work Group No- 02
Construction and Installation of 20 nos. of solar power operated deep borewell in command areas of Magadh-Sanghmitra Area under CSR.
Lifting and lowering defective submersible pump into existing borewell for water supply at different location of Urjanagar colony, under Rajmahal Area.
Construction of one no deep borewell and 01 no room at lal Bangla colony Charhi under GM Unit of Hazaribagh Area
Supplying of submersible pump panel in to existing borewell for water supply at different location of Urjanager colony, under Rajmahal Area.
Installation of solar based deep borewell at Gargali Village health sub-centre under CSR Scheme 2025-26 of Kuju Area, CCL.
Drilling of 2 (Two) Nos. of horizontal borehole from U/G workings of 31 incline (B.P.Seam) to U/G workings of 5 and 5A incline (B.P.Seam) for dewatering the stagnant water at 5 and 5A Incline to develop the eastern side of the property through U/G
Construction of two no borewell at block no A-02 and washing point at at TAPIN NORTH OPEN CAST PROJECT, Hazaribagh Area
For extension of 3.3 KV O/H line for maching of electrical shovel from coal dump to beldariya bore hole (view point) coal patch ,TMC
Relocation of Defunct T/W of 125mm dia and 40 mtrs Deep Gravel packed tube well with Installation of India Mark-II hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W and S Division, Godda on turn key
Relocation of Defunct T/W of 125mm dia and 40 mtrs Deep Gravel packed tube well with Installation of India Mark-II hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W And S Division, Godda on turn key b
Relocation of T/W of 125 115 mm dia 60 mtrs Deep Drilled Tube Well with Installation of India Mark II (IS 15500 part-2/2004) hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W And S Division Godda
Relocation of T/W of 125 115 mm dia 60 mtrs Deep Drilled Tube Well with Installation of India Mark II (IS 15500 part-2/2004) hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W And S Division Godda
Changing of 72 nos Rotton Riser Pipe and Connecting Rod of drilled tube well India Mark-II with 32 mm dia medium class riser pipe and 1-3 Cylinder including supplying of materials and labours under DW and S D Latehar year 2021-22 Group-LTR-RRP-01
Relocation of Defunct Tube Well of 125 mm x 115 mm dia x 60 Mtr Deep (Av) DT Well complete with Installation of IM II H.P etc. all complete job in different blocks under D. W. and S. Division Jh.Telaiya for 2022-23 On Turn Key Basis (2nd Call)
Changing of 66 nos Rotton Riser Pipe and Connecting Rod of drilled tube well India Mark-II with 32 mm dia medium class riser pipe and 1-3 Cylinder including supplying of materials and labours under DW and S D Latehar year 2021-22 Group-LTR-RRP-09
Changing of 32mm dia G I Rotten Riser Pipe Connecting Rod C I Cylinder of Drilled Tube Well India Mark II and depositing taken out old materials to departmental store etc. all complete job in Rural Areas under D W and S D Hazaribag HZB RRP 21-22-02
Changing of 50 nos Rotton Riser Pipe and Connecting Rod of drilled tube well India Mark-II with 32 mm dia medium class riser pipe and 1-3 Cylinder including supplying of materials and labours under DW and S D Latehar year 2021-22 Group-LTR-RRP-08
Changing of 32mm dia G I Rotten Riser Pipe Connecting Rod C I Cylinder of Drilled Tube Well India Mark II and depositing taken out old materials to departmental store etc. all complete job in Rural Areas under D W and S D Hazaribag HZB RRP 21-22-01
Changing of 72 nos Rotton Riser Pipe and Connecting Rod of drilled tube well India Mark-II with 32 mm dia medium class riser pipe and 1-3 Cylinder including supplying of materials and labours under DW and S D Latehar year 2021-22 Group-LTR-RRP-02
Construction of 20 nos. Solar Power Operated deep borewell in project-affected villages in command areas of Magadh-Sanghmitra Area under CSR
Repairs of Toilets construction of Over Head Tank Deep borewell inVarious Schools in Hzaribagh District as part of Swachh VidyalayaAbhiyan Package 4
Installation, lowering and lifting of submersible pump with enlargement of pipeline, starter panel in Borewell at Lohandia rehab site under Rajmahal Area.
Lowering and commissioning of 01 submersible pump in existing borewell with laying of pipeline at OB dump rehab site under Rajmahal Area.
Construction of 02 (two) nos. borewell with submersible pump and pump house at Topa composite colony under Topa colliery of Kuju Area.
Construction of 01 No. Deep borewell with submersible pump (10HP) at T/Storey, C-type campus under GM Unit of Kuju Area.
Lowering lifting and repairing of submersible pump motor set and flushing of borewell at Chainpur siding under Kedla Washery of Hazaribagh Area
Installation of a borewell solar tank piping in front of Haji Mofijuddin shop along the Bartand-Sahebganj Road in Lahardih Pathuriya Panchayat
Repairs of Toilets construction of Over Head Tank Deep borewell inVarious Schools in Hzaribagh District as part of Swachh VidyalayaAbhiyan Package 2
Group no_02 Relocation of Defunct T Well 125x115 mm dia and 60m Deep Drilled Twell with Installation of IM-II Hand Pump 1.85m dia Pcc Platform and 3.0 m long Drain on Turn Key basis in Different Rural Habitation in Latehar District During FY 2022_23
Supply of Spare Parts of Deep Well Hand Pump India Mark-II Conforming to IS 9301 1990 with latest amendment may be read along with 1st amendment IS 15500 Part1 7 2004 with latest amendment for spares of India Mark II respectively under DWSD CHATRA
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-06
Supply of Spare Parts of Deep Well Hand Pump India Mark II Conforming to IS 9301 1990 with latest amendment may be read along with 1st amendment IS 15500 Pt II 2004 with latest amendment for spares of IM II respectively Under DWSD CTR
Group no_03 Relocation of Defunct T Well 125x115 mm dia and 60m Deep Drilled Twell with Installation of IM-II Hand Pump 1.85m dia Pcc Platform and 3.0 m long Drain on Turn Key basis in Different Rural Habitation in Latehar District During FY 2022_23
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment (may be read along with Ist amendment IS 15500(Part 1-7) 2004 with latest amendment for spare parts of India Mark- II respectively)
Supply of SPARE PARTS for Standard Deep Well Hand Pump India Mark-II conforming to IS 15500 (Parts 1 to 8 concerned)/ 2004 along with latest amendment including all Taxes i.e. GST, Royalty and Labour Cess etc. for the D.W. and S. Division, Jamshedpur
Group no_01 Relocation of Defunct T Well 125x115 mm dia and 60m Deep Drilled Twell with Installation of IM-II Hand Pump 1.85m dia Pcc Platform and 3.0 m long Drain on Turn Key basis in Different Rural Habitation in Latehar District During FY 2022_23
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-09
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-03
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. AMR-20
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-02
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-05
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-07
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-01
Group no_04 Relocation of Defunct T Well 125x115 mm dia and 60m Deep Drilled Twell with Installation of IM-II Hand Pump 1.85m dia Pcc Platform and 3.0 m long Drain on Turn Key basis in Different Rural Habitation in Latehar District During FY 2022_23
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. PKR 19
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S 9301-1990 with latest amendment (may be read along with 1st amendment IS 15500(Part 1, 7) 2004 with latest amendment for spares of India Mark II under D.W.S.D, Deoghar
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-08
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. MAH-04
Construction of 125mm/115mm dia, 120 Mtrs. av. deep drilled T/w with Installation of IM-II Hand Pump, platform and drain etc. in different location for the year 2024-25 in the District of Pakur under D.W.and S.Division Pakur. GROUP NO. HIR 18