Loading…
Loading…
2,092 results • Best match
BOREWELL CONSTRUCTION
Annual Plan-DP PKD 2023-24 Preparation of Bore well, Tank and Water supply system at Vellinezhi Govt High School (Project No 92/24)-General Civil Work
GENERAL-Annual Plan-Poonjar Thekkekara Grama Panchayat 75/2024-25 Pipe Replacement for Kaipally Muttam Bore Well in ward-5 (Single Year Project)-2,00,000-General Civil Work
ANNUAL PLAN-KONDAZHY GP 2025-26 - Installation of Bore Well motor pump set for pottikunnu DWSS(Proj.No.SO 146/25-26) - Uravanchal Pottikunnu DWSS Eletrification - General Eletrical Work
Bore Well Construction at 2 sites 1 Allimooppan Colony in Muthalamada GP and 2 Muppathekkar Colony in Muthalamada GP in Palakkad District under Deposit Scheme 2023 24
BOREWELL CONSTRUCTION AT MANGATTIDAM, PINARAYI AND KANICHAR G.P IN KANNUR DISTRICT
O And M - Water Supply Schemes-TWSS to Thachampoyil-Supplying and Erection of 15HP Submersible Tube Well Pump Set - General Civil Work
Construction of 200 mm dia Tube well at Thrikkadavoor Community Health Centre of Kollam Corporation in Kollam District under LSGD deposit work.
Jal Jeevan Mission (JJM)-RWSS to Thevalakkara-Consructing Newly Drilled Tube well at Koozhamkulam Pump House compound (Ward 19)in Thevalakkara Panchayath
Supply of 120 meter 200mm UPVC Plain pipe (CM) and 30 meter 200mm UPVC Ribbed screen pipe used for Tube well construction.
Construction of 110mm dia bore well at Kuttiplangad Ambalam Bhagam Kokkayar GP in Azhutha BP, Idukki district
CONSTRUCTION OF 110MM DIA BOREWELL IN ROTARY CUM DTH METHOD AT TWO SITES IN EDAKKARA GRAMAPANCHAYATH AND BOREWELL FLUSHING AT CALICUT AIRPORT
Bore Well Construction at Three Anganvadis in Chemnad Grama Panchayath under Grama Panchayath Deposit Scheme and ChigirupadeThottathotty in Meenja Grama Panchayath under Block Panchayath Deposit Scheme (Retender1).
SUPPLYING 10 HP SUBMERSIBLE PUMP SETS FOR STAND BY ARRANGEMENT IN VARIOUS TUBE WELL BASED RWSS UNDER P.H.SECTION, KAYAMKULAM.
Supply of machinery suitable for the construction of filter point well upto a depth of 40 feet in coastal terrain and for developing tubewell/borewell up to a depth of 100 m.
Bore Well
Handpump repair work at 20 sites in Naranammoozhy Grama Panchayath under Deposit scheme
HAND PUMP REPAIR AT 7 SITES IN AYYAPPANKOVIL GP AND Implementation of MWSS at Panamkutty Double cutting Ward-15 Vellathooval GP IN IDUKKI DISTRICT
6 INCH OR 150 MM DIA BORE WELL CONSTRUCTION AT TWO SITES IN MOODADI GRAMA PANCHAYATH AND ONE SITE IN NARIKKUNI GRAMA PANCHAYATH IN KOZHIKODE DISTRICT
Construction of Borewell
Construction of 6 Inch and 4.5 Inch Dia Borewells at various place in Alappuzha District.
GENERALChambakkulamBPChambakulam block Annual plan Pacha Division Provision of Related facilities for the Construction of borewells
District Panchayath Palakkad - Deposit work 2018-19 (SC)- Providing water supply to Pariyangad colony in ward 8 of Alanallur Grama Panchayath- Drilling of 150 mm dia Bore well
Annual Plan-Annual Plan Kuzhalmannam Grama Panchayat 2023-24 Construction of Bore Well at Manjadi Gas Cremetoriumin ward no.13-Project no.223/2023-24-General Civil Work
DEPOSIT-Sub Jail Perinthalmanna-Supply and Installation of Submersible pump set by replacing the existing Low head /discharge pump set in the existing Bore well-General Electrical Work
Jal Jeevan Mission (JJM)_RWSS to Elampalloor panchayat_-Supply, erection, testing and commissioning of 90m head 350 lpm bore well submersible pump set at Mamachankavu automation pump house
S0233/25 - Providing Motor and Additional Facilities at Take a Break Bore Well -providing Motor Pump Set of Peringome Vayakkara Grama Panchayat under Annual Plan 2024-25(Retender)
Ulikkal GP CONSTRUCTION OF BORE WELL AND RELATED FACILITIES FOR VATTYAMTHODE CENTER NO-14 ANGANWADI Under Annual Plan 24-25-Proj No.169/24-25-General Civil Work
TWO BOREWELL CONSTRUCTIONS AT THRISSUR DISTRICT
GENERAL-Providing Borewell at Meppady Resthouse
236/21-22 Construction of borewell
Karod Borewell in Melarkode Grama Panchayath
STATE PLAN - 2024-25- ENERGY CONSERVATION MEASURES-SUPPLYING AND COMMISSIONING OF 10 HP SUBMERSIBLE PUMP SETS IN VARIOUS TUBE WELL UNDER P.H.SECTION, KAYAMKULAM.
DEPOSIT-Oachira Block Panchayath - RWSS to Thodiyoor-Drilling of New Tube well at Driver Junction (Ward 21) in Thodiyoor Panchayath-General Civil Work
Construction of a 200 mm dia Tube well at Elamkulam, Ward 12 of Thodiyoor Grama Panchayath in Kollam District under LSGD deposit work.
Construction of 200 mm dia Tube well at Mangadu Theeradhesha Drinking Water Scheme of Kollam Corporation in Kollam District under LSGD deposit work.
Annual Plan-IDP/2022-23 KUNJITHANNY SCHOOL TUBE WELL,PIPE LINE IN PALLIVASAL GRAMA PANCHAYATHProject No- S0957/23 -General Civil Work RE-TENDER
Supply of 80 Meter 200 mm dia UPVC PLAIN (CM) pipe and 30 Meter 200mm RIBBED SCREEN PIPE used for Tube well construction.
IMPLIMENTATION OF PUMPING SCHEME IN EXISTING BOREWELL AT THENNALA GP,MALAPPURAM
BOREWELL CONSTRUCTION
Borewell construction
BOREWELL CONSTRUCTION
BOREWELL CONSTRUCTION
borewell
SUPPLYING 7.5 HP SUBMERSIBLE PUMP SETS FOR STAND BY ARRANGEMENT IN VARIOUS TUBE WELL BASED RWSS UNDER P.H. SECTION, KAYAMKULAM.
Annual Plan-PRNO262/2026-27 KUNNATHOOR GP-Motor - Plumbing Works for Borewells-General Civil Work
Construction of Tube wells at Kattuvila ( Ward VII) in Edava Gramapanchayat, Punnakoottam ( MA Colony) Ward IX in Varkkala Muncipality and Kunnil Slaughter House ( Ward IX ) in Varkkala Muncipality , Varkkala Constituency ,Thiruvananthapuram District
Handpump erection work at Cherilayam Anganwadi, Pandalam Thekkekkara GP under deposit Scheme
Construction of borewell
BOREWELL INSTALLATION,MOTOR,TANK FOR KAVUNTHALA,PUNNAKKUNNU,KULANGARA,PULIMADA ANGANAWADI