Loading…
Loading…
2,092 results • Best match
ET-02/23-24/AE/LSGD/CPYMUN-19 Bore well construction in 101 Anganvadi
IMPLEMENTATION OF PUMPING SCHEME IN EXISTING BORE WELL AT FOREST CENTRAL DEPOT, ARUVAKODE, NILAMBUR
Mud Football Court, Fencing, Drain, Interlock, Electric Pole Foundation, Bore well and Electrification works
MWSS,BWC
DWSS Works
LAC-ADS 2019-20 Sri.R.Ramachandran MLA -Supplying and Erection of 2 Nos. 10 HP Submersible pump sets(1 No. Stand by), and laying 90 mm PVC (6 kg/ cm2) pipe from new tube well to be drilled tointerconnection work in Karunagappally municipality
Construction of office building and Type IV Quarter including water supply, sanitary installations, Drainage, 1 No. Bore well , UG Sump, IEI, Down Comer, Solar power generation, DG set, street lighting and Demolition of existing building for SIB Kannur. SITC of CCTV system , Drinking water pump set, Split AC units etc.
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SETS, DG SET, ELECTRICAL INSTALLATIONS, WATER FILTRATION PLANT ETC AT GPRA, KAKKANAD, KOCHI DURING 2024-25. SH. MAINTENANCE OF IEI AND FANS, DG SET, WATER FILTRATION PLANT, SERVICING OF DG SET, REPAIR OF ... OF BORE WELL PUMP ...
Water supply
Perumkadavila BP (SO 145/21-22) Borewell construction and drinking water provisions for LMS LPS Panachamoodu in Perumkadavila BP
Construction of 180 mm dia borewell at Kanjiramchola, ward12 in karimba gp in Palakkad district under GWBDWSS 2024 25
GENERALGuruvayur municipality 2023 24 Digging borewell and providing water tank at town hall Ward No 23 General Civil Work
Annual Plan 2023 24 Construction of borewell in Puthenkada market at ward 5 in Thirupuram GP Pro No 161
PR.NO. 428.23-24-Construction of borewell and providing motor pumpset for kattile kulam drinking water project in ward 21
NOOLPUZHA GRAMA PANCHAYATH 2025-26 PROJECT NO 357 PROVIDING MOTOR AND PIPELINE ELECTRIFICATION TO THELAMBETTA - MULLANCHIRA PANNIYA UNNATHI BOREWELL
DIGGING OF BOREWELL IN THE COMPOUND OF STATE SPECIAL BRANCH OFFICE AT DHARMASHALA IN KANNUR DISTRICT (RE) (DSR 2018)
BOREWELL CONSTRUCTION AT 7 SITES AT VORKADY GP AND 1 SITE AT CHEMMANAD GP IN KASARAGOD DISTRICT DEPOSIT WORK
Annual Plan-Vellarada GP Proj. No54/2024-25-Venkuzhi borewell construction and additional facilities in ward 2 -General Civil
PR.NO. 610/24-25-Construction of borewell , motor pumpset, connection, pipe line etc near Subiksha Hotel in kunnamkulam municipality
GENERAL Vidwan P Kelu Nair National Cultural Centre at MPSGVHSS Vellikkoth in Kasaragod district Drilling Borewell General Civil Work
CONSTRUCTION OF AN 8 INCH TUBEWELL AT WARD 4 ALAPPAD GRAMA PANCHAYATH IN KOLLAM DISTRICT.
MADHUR GP PR.NO 357/24 BORE WELL MOTOR AND RELATED FACILITY AT SOORLU ANGANVADY(RETENDER)
Supply of 140 mm dia PVC pipe 6 Kg/cm2 suitable for bore well construction.
Construction of B type School Building for Kendriya Vidyalaya at Kollam.SH. Providing water supply pump sets in borewell. Subwork/Packages: Single
The provisions included are Total station survey,Conduction borehole test etc
DEPOSITKottukal GP deposit work Project No 256 24 24 Construction of new Tubewell at vengapotta tank site and Supply installation and commissioning of Tubewell Submersible pump set and existing tank maintenance and allied works at Vengapotta
4. 5 INCH DIA BORE WELL CONSTRUCTION AT FIVE SITES IN VELOM GRAMA PANCHAYATH TWO SITES IN UNNIKULAM GRAMA PANCHAYATH AND 6 INCH DIA BORE WELL CONSTRUCTION AT PERUVAZHIKKADAVU ANGANVADY IN KUNNAMANGALAM GRAMA PANCHAYATH IN KOZHIKODE DISTRICT
BWC AT HOSDURG POLICE QUARTERS,KUTHAJE SC UNNATHI, KLAYIKODE, GVHSS DELAMPADY, 3 BOREWELLS AT BALAL GP BWC AT VARIKKENPARA SMASHANAM IN KAYYUR CHEEMENI GP AND MUTLA DWSS IN VORKADY AND FLUSHING TOTAL 9NOS
Handpump repair work at 12 sites in Kottangal Grama Panchayath and 10 sites in Cherukol Grama Panchayath in Pathanamthitta District under Ground Water Based Drinking Water Supply Scheme
Construction of 200mm tube well in Manivelikkadavu in Arattupuzha Grama Panchayat
Construction of a 110 mm (4.5 inch) diameter borewell at four Anganwadi compounds in Kulakkada Grama Panchayath under LSGD deposit work.
ANNUAL PLAN PATTAMBI MNPLTY 2023 24 CONSTRUCTION OF BOREWELL IN VARIOUS DIVISION IN 15-28 PR NO 258/24 RETENDER
150mm Dia Borewell at Kanjikode Institute of Forest Genetics and Tree Breeding in Palakkad District under deposit scheme 2024 25
Construction of a 110 mm (4.5 inch) diameter borewell at three sites in Chithara Grama Panchayath under LSGD deposit work.
Annual Plan-Kizhakkenchery Gramapanchayath 2022-2023-Construction of borewell in Various places (Project No-38/22-23)-General Civil Work
Construction of a 110 mm (4.5 inch) diameter borewell at three sites in Chithara Grama Panchayath under LSGD deposit work.
GENERAL-Urgent Replacement of Damaged Borewell Motor and Connected Accessories at Govt. Paramedical Institute PazhambalacodeBorewell Motor Replacement-General Electrical Work
Annual Plan-Kalikavu Block Panchayath Both Electrification and Borewell construction for Pakalveedu at Chokkad-S0161/26-General Electrical Work -Retender
150 mm Dia Borewell Construction at Manjalungal, 19th ward, Ongallur GP, Pattambi in Palakkad District Under Deposit Scheme 2024 2025
GENERAL Annual plan 2024 25 Replacement of damaged borewell motor pump sets in various DWSS projects in Ananganadi grama panchayath
Construction of 150 mm Dia Borewell at Chamakkadu Nangukulam in Alathur GP in Palakkad District Under Deposit Scheme 2022-23
Construction of 6 inch Dia Borewell at Greenvilla Ward 3 in Nagalassery GP in Palakkad District Under Deposit 2023 2024
Construction of 150 mm dia borewell at Kootanad, Ward-11 in Nagallassery GP in Palakkad District under GWBDWS 2022-23
District Panchyath- Deposit work (SC)-MWSS to Mariyathodi Colony Karadikunnu colony in ward no 13 Chalavara GP- Drilling 150mm Borewell
Construction of 110 mm dia borewell at 2 sites of Kozhenchery Grama Panchayath in Pathanamthitta District under Panchayath Deposit Scheme
Construction of a 110 mm (4.5 inch) diameter borewell at Thekkekkara Plavarakkodu in Mylom Grama Panchayat under LSGD deposit work.
Annual Plan-Alannallur GP 2024-25 Pro-384-25 Borewell -Paduvilkunnu DWSS-pro-384-25 ward 13-General Civil Work
ANNUAL PLAN PATTAMBI MNPLTY 2023 24 CONSTRUCTION OF BOREWELL IN VARIOUS DIVISION IN 1-14 PR NO 257/24 RETENDER
PORTABLE ARC WELDING MACHINE, PORTABLE PRESSURE TESTING HAND PUMP
Construction of two storied R C C Building plumbing sanitary works compound wall bore well sump