Loading…
Loading…
10,571 results • Best match
MANSOON ACTION PLAN 2018. S.NO. 8 OF 109 WORKS REMOVAL OF WET SILT FROM ARUNDEL PETA MAIN ROAD FROM 4TH LINE TO WARDS RAILWAY COMPOUND WALL(BOTH SIDES OF ARUNDELPET FLYOVER) TO WARDS EAST UNDER AE- SECTION.
Providing C C Road to Balaji Nagar karakatta down Road from 1st cross Road to 8th cross Road & Door no.61-22/1-13A to VMC Compound wall in Ramalingeswara nagar 14th division. 2nd Call General Funds
Improvements to R.K Beach Park with Granite cladding, repairs to compound wall at Children Park, Opposite to sagara tarangalu, Sculpture Park and Dharna Shed on the Service Road of R.K Beach main road in Ward No.20.
Development of Open site (Survey No.176) at Gayatri Temple by construction of compound wall providing Greenery, Walking Track and Children Equipments in ward no.2 (15th Finance Commission Grant for the year 2020-21) (5th Call)
Cleaning of Septic Tank, MH, SWT, Sewage Line, Repairs Replacement to Sewage Line, Manholes, Area Drainage, Cover Slab and Repairs to Hardstanding and Culvert and Repairs to Stone Pitching, Retaining Wall, Compound Wall, Chain Link, Concertina Coil,
Repairs to Hardstanding, Chequered Tile Path, Kerb Wall and Interlocking Tiles and Repair to Security Compound Wall, Steel Gate, Coping, Plastering Replacement of Concertina Coil, Barbed Wire, Angle Iron and Fencing Chain Link Fencing at INS Kalinga
Construction of Compound wall at Regulation of Unauthorised Lay-out Plan in D.no. 9(P) and 23(P) beside Repalle Karakatta in Municipal Land in 2nd ward Tadepalli Municipality under 14th Finance Grant 2017-18 Performance Grant
Reconstruction of collapsed compound wall on west and south sides and Providing of flyash brick masonry drain, Masonry sump, 5 HP centrifugal monoblock pumps and CC Ramp at the entrance gate at 132KVSS Tirupathi in Chittoor district.
Providing additional arrangements to the Dr.B.R.Ambedkar Dining hall i.e, tiles flooring, sealing painting, electrical wiring, plumbing centrailized AC Power bore, Head room, Parapet wall and north side compound wall raising etc., in 27th ward in Palacole Municipality
Repair Replacement to Area Drainage, Cover Slab and Culvert and Repair to Security Wall, Compound Wall, PCC Coping, Plastering Replacement of Concertina Coil, Barbed Wire, Angle Iron and Chain Link Fencing at Technical Area at INS Kalinga
REPAIRS TO CHAIN LINK FENCING BARBED WIRE FENCING, CONCERTINA COIL, COMPOUND WALL, RETAINING WALL, GUIDE WALLS, HAND RAILS, FOOT PATH, HARD STANDING, AREA DRAINS, STONE PITCHING, SPORTS FACILITIES AND CERTAIN MISC B/R WORKS AT OFFICER MARRIED
Providing of scientific doors and UPVC windows, provision for exclusive ladies toilet room, arresting of roof leakage, raising of compound wall, internal painting and other miscellaneous works at 132/33KV SS Vontithadi in Vizianagaram Dt (3rd call)
Providing of scientific doors and UPVC windows, provision for exclusive ladies toilet room, arresting of roof leakage, raising of compound wall, internal painting and other miscellaneous works at 132/33KV SS Vontithadi in Vizianagaram Dt (2nd call)
Development of Open site (Survey No.176) at Gayatri Temple by construction of compound wall providing Greenery, Walking Track and Children Equipments in ward no.2 (15th Finance Commission Grant for the year 2020-21) (11th Call)
Construction of Compound Wall And Providing Components like Water supply Arrangements, Internal and External Electrification, Paintings, Flooring and Approach Road to UPHC Building in Kotthuru (Kunchanapalli) in Tadepalli Urban of Mangalagiri-Tadepalli Municipal Corporation under General Funds.
Development of Open site (Survey No.176) at Gayatri Temple by construction of compound wall providing Greenery, Walking Track and Children Equipments in ward no.2 (15th Finance Commission Grant for the year 2020-21) (6th Call)
Development of Open site (Survey No.176) at Gayatri Temple by construction of compound wall providing Greenery, Walking Track and Children Equipments in ward no.2 (15th Finance Commission Grant for the year 2020-21) (8th Call)
Providing of CC Road from Velugu Office Building to South West side of the Compound wall of the Dumping Yard for the Transportation of Sanitary Vehicles in Dumping yard in Rayadurg Municipality Under SAC Grant 2017-2018
Development of Greenery at Kapuluppada Dumping yard in GVMC (RD-2.3)- S.No.6 1st Installment for the year 2020-21 under 15th Finance Commission Grant. (Construction of Compound wall for development of Greenery at Kapuluppada Dumping yard)
HIWID No MAUD-1010-14838-Thurpu Moghasala-01-Laying of C.C.Road from D.No:12-2/1-6/3A to dead end of the Street (Upto B.R. Layout Compound Wall) in Rama Krishna Nagar in Ward No:13
Construction of New Control House Building, Switch yard levelling, Metal Spreading, Balance Compound Wall cum RCC Retaining Wall, CC Drains, RCC Rain Water Sump and other miscellaneous Civil works at 132/33KVSS Bhimavaram in West Godavari District.
Construction of Compound wall at Regulation of Unauthorised Lay-out Plan in D.no. 9(P) and 23(P) beside Repalle Karakatta in Municipal Land in 2nd ward Tadepalli Municipality under 14th Finance Grant 2017-18 Performance Grant
Construction of Compound Wall from 0/146 to meters chainage to 90/146 meters chainage around 600 KL ELSR, in chenchula colony, ward no.11 of pedana municipality under 15th fc 2020-21 (1st installment) UnTied grant.
Ongole Urban Development Authority - Development of park site by providing soft scape, Lighting, Completion of incomplete compound wall and Providing children play equipment at Housing Board Colony (Biscuit Colony) in Division no. 19 of Ongole Municipal Corporation
2025-Eng05-55-104 - Supply, delivery and fixing of Gym equipment in green belt at E.P 88A/2 for senior citizens and youth and construction of compound wall in Dharma nagar, ward no.55, Zone-VA, GVMC
Construction of vehicle parking shed, south side compound wall & approach road to shed to office building (DC, AC, JVO & Engineering offices) Survey No.78 belongs to Sri Chennakesava & Sri Anjaneya Swamy temple of Dinnedevarapadu (V), Kurnool Dist.
Construction of Septic tank, Repairs to damaged compound wall and providing water supply and sanitary items, painting, MS grills and Mural arts for Gadalamma nagar UPHC at VL Puram in 10th division. (Under APHSSP and NUHM funds)
2022-HOR01-29-100 - Providing painting , Compound wall repairs , G.I chain link Mesh, Grc Pavers , Gate ,Name Board Outdoor Fitness Equipments in Prakesh Rao Peta SBI Colony Park in Ward -29 of Zone-4 area of GVMC.
Development of Greenery at Kapuluppada Dumping yard in GVMC (RD-2.3)- S.No.6 1st Installment for the year 2020-21 under 15th Finance Commission Grant. (Construction of Compound wall for development of Greenery at Kapuluppada Dumping yard)
Construction of DEE-6 Section office & Providing CC internal roads, raising of Compound wall and development and providing Greenery in the premises of vasantharayapuram water tanks ground in Div No.51 Under AE-12 Section(2nd call)
Balance work of Construction of sri Ankamma Ammavari temple along with compound wall in the R&R colony (6.99 Ac for SC-C) at kunkupadu (V) for the PDFs of pathakotikalapudi in addanki (M) of Bapatla district.
Laying of cc Roads and cc drains from Adari veerinaidu apartment to market Yard Compound wall & Dadi Lingeswara rao House to back side of Balakrishna bus stop in ward No 84 of Anaka palle Zone VII GVMC
Construction of Compound Wall from 0/146 to meters chainage to 90/146 meters chainage around 600 KL ELSR, in chenchula colony, ward no.11 of pedana municipality under 15th fc 2020-21 (1st installment) UnTied grant.
2026-Eng04-GN-100Construction of Toilet block with running water Supply Locker room Pathways GI Shed Compound wall and Lighting arrangements to the Burial Grounds in Ward No 27 36 37 and 41 of South Zone GVMC
Construction of compound wall at Municipal open space in survey No 103/B1-B and 99/B2 at Babu Jagjeevan ram colony in 7th ward in Yemmiganur Municipality under 15th FC 2023-24 (2nd installment) untied grant.
RTPP -Stage-IV (O&M)- Removing of silt and sludge in the RCC Drain leading from CHP Box Culvert to ERH area and R.R. Drain from coal plant outlet to new compound wall exit near kalamalla vagu
Construction of Children park along with Compound wall in Ondutla R&R Center for the Project Displaced families of Sairam nagar, Mettugodi, Lakshmipuram,and Krishna nagar villages of Ardhaveedu Mandal, Prakasam District under Pula Subbaiah Veligonda Project.
Construction of Compound wall at MUDASARLOVA on East side (opp.) Golf Club, West side of Pineapple Colony, North Side of GVMC land of surroundings of Reservoir Bund for protection of GVMC land from encroachment.(1180m) (2nd call)
Construction of compound wall vacant site near housing Blocks Nos.62 and 63 in Vambay Colony, Division No.60 and beside kanaka Durga Nagar DP Station in Singh Nagar in Division No.58 (14th Finance Commission Grant)
Laying of CC Roads in Kalighat Colony, Santhi Colony and Precast Prestressed Concrete Compound Wall at Park Open site Kamakshi Nager at Various Places in Ward no.42 in Vizianagaram Municipal Corporation. Est Cost Rs.20.00 Lakhs.
Providing Balance Infrastructure works such as internal BT Roads, Storm water Drains, Culverts, Drainage pipe lines, CC Dividers, Raising of Compound wall Height etc., to the Anandanilaya Township at Rayachoti, Annamayya District, AP under Rajiv Swagruha Scheme.
Development of Infrastructure like Dormitory, Dining hall cum Kitchen, Construction of Drainage System from Dormitory to Syntex water tanks, wire fencing on the compound wall to APSWRS Girls Hostel at Kokkirapalli (V), Yellamanchili (M) in Anakapalli District
Providing BT Road from Siddartha ITI college opposite Anakoderu Irrigation canal right bund bridge road in Bye pass road to Town Railway station compound wall along Irrigation canal in Satyavathi Nagar in 36th ward in Bhimavaram Municipality
Construction of Compound Wall And Providing Components like Water supply Arrangements, Internal and External Electrification, Paintings, Flooring and Approach Road to UPHC Building in Kotthuru (Kunchanapalli) in Tadepalli Urban of Mangalagiri-Tadepalli Municipal Corporation under General Funds.
Construction of Compound wall for Development of Park LP No.20/76 to Survey No. 372/1, 377C1,522/1,372/3,377/c3 & 522/4 (near Narayana school) in Nehru Nagar at Dhone Municipality under Additional Funds 2020-21
Development of public park at Kommadhi cheruvu by Providing See through compound wall(West side), security room, entrance arch, Gate, Outdoor fitness gym, children play items near Kommadhi road in ward no.6 of Zone-II, GVMC
Construction of retaining wall on existing gedda by the side of TTD Kalyanamandapam and and construction of drain along the compound wall of TTD information centre at MVP colony in ward no. 17 of Zone-III-3rdcall
Rotation/Tilting of 300NB MS pipe through 180 degrees for 02 Nos. Ash slurry disposal lines of Unit-6/Stage-IV/Dr.MVR RTPP from Ash Slurry Pump house to forest compound wall during the year 2025-26
Cleaning of Septic Tank, MH, SWT, Sewage Line, Repairs Replacement to Sewage Line, Manholes, Area Drainage, Cover Slab and Repairs to Hardstanding and Culvert and Repairs to Stone Pitching, Retaining Wall, Compound Wall, Chain Link, Concertina Coil,
REPAIRS TO CHAIN LINK FENCING BARBED WIRE FENCING, CONCERTINA COIL, COMPOUND WALL, RETAINING WALL, GUIDE WALLS, HAND RAILS, FOOT PATH, HARD STANDING, AREA DRAINS, STONE PITCHING, SPORTS FACILITIES AND CERTAIN MISC B/R WORKS AT OFFICER MARRIED