Loading…
Loading…
10,571 results • Best match
Construction of Female barrack including Day toilets & Female barrack around Compound wall at Special Sub-Jail, Machilipatnam of Krishna District. - Sub Work: Providing MS Grill to Verandah & Paintings, Live wire to Newly Constructing Female Barrack
Giddalur Nagara Panchayat - 15th Finance 2nd Installment 2020-21(Tied Grant) - Construction of Toilet Room, Office Room and Compound wall to the Newly Constructed GTS, Opposite to Christian Burial Ground in ward no.16,GNP
Construction of Church along with compound wall at R&R centre Devarajugattu of Peddaraveedu mandal for project displaced families of gundemcharala and katamaraju thanda villages of Peddaraveedu mandal under pula subbaiah veligonda project prakasam district
Reconstruction of Damaged Compound wall in place of old damaged wall on West side of KRM Colony burial ground at KRM Colony in Ward no 23 of East Zone , Gvmc- Reserved for SC/ST society
Construction of Children park along with compound wall (02 Nos) in Vemulakota R&R center for the Project Displaced Families of Akkacheruvu Thanda and Gottipadia (Part) Villages of Markapur Mandal under Pula Subbaiah Veligonda Project
Improvement of Hindu Burial Ground ie Compound wall gate waiting hall Storage room Water supply and Plumbing Arrangements Electrification and pathways in Gunipudi ward No18 under 15th FC Grant 2020 2021 2nd Installment TIED Grant
Construction of Compound wall at MUDASARLOVA on East side (opp.) Golf Club, West side of Pineapple Colony, North Side of GVMC land of surroundings of Reservoir Bund for protection of GVMC land from encroachment.(1180m)
Providing of scientific doors and UPVC windows, provision for exclusive ladies toilet room, arresting of roof leakage, raising of compound wall, internal painting and other miscellaneous works at 132/33KV SS Vontithadi in Vizianagaram Dt
2025-Eng04-29-102 Laying of CC Road and Construction of compound wall as a part of road widening on East side of St.Anthony High School in Pentaveedhi in Ward No.29, Zone-IV, GVMC.
Construction of Community Hall Building along with compound wall (3Nos) at Vemulakota R & R center identified for Project Displaced Families of Akkacheruvu Thanda and Gottipadia(part) Villages of Markapur Mandal, Prakasam district under P.S.Veligonda Project.
Construction of precast compound wall for 132KV SS TBvara, quarters-I site attached to the switchyard area and quarters-II area other side of the main road near 132KV SS TBVara premises in Vizianagaram Dt
Development of LIG-2 Park (Plot No.236) with walking track, play equipment, open gym, compound wall repairs and painting at UDA Colony, Ward No.63 in Circle-II area..Rc.E3.PD3(Parks)-107752/2026
PROVIDING FLOORING TO STUDY PLAT FORM AND RAISING OF COMPOUND WALL ALL RIGHT,LEFT AND REAR SIDE TO HOSTEL CONVERSION IN TO APTWR SCHOOL FOR GIRLS AT GUDURU VILLAGE AND MANDAL IN SPSR NELLORE DISTRICT
Providing Grills and First Floor and Ground floor of Subbarao Nagar Elementry school and simhachala nagar elementry school and existing compound wall fencing minor repairs to subba rao nagar school in 49th division. (2nd Call)
Improvements to Temple (Reconstruction of Temple Mandapam Extenstion of Mandapam Construction of Pongal sheds and Reconstruction of Compound wall around Sri Pedda Ammavaru Temple) of Sri Polamamba Ammavari Temple, Sambara (V), Makkuva (M), Vizianagaram District
Construction of Path ways, ZYM Equipment, Children Play equipment in place of damaged and repairs and paintings to the compound wall of Netaji Park, Sector-1 MVP Colony in ward no 17 of Zone-III
Providing CC Road to Balance Road from D.No.61-24-6/7 to STP Compound wall in Tagore Road Ramalingeswara Nagar, under sachivalayam-70 in Division No.15. (MAUD-10733-29581) 1st Call GGMP Funds
Construction of Compound wall at MUDASARLOVA on East side (opp.) Golf Club, West side of Pineapple Colony, North Side of GVMC land of surroundings of Reservoir Bund for protection of GVMC land from encroachment.(1180m)
Construction of compound Wall to vacant sites near D.No.76-45-209(LP No.4/03 near pumping station, HB Colony, in CIR-1 area in Division No.28 of Vijayawada Municipal Corporation.(3rd Call)
CONSTRUCTION OF COMPOUND WALL (Brick work at North side and Precast wall at East, West & South sides) TO THE OLD DUMPING YARD "MATERIAL RECOVERY FACILITY (MRF)" AT PONNUR ROAD UNDER AE-8 SECTION (General Grant)
Construction of compound Wall to vacant sites near D.No.76-45-209(LP No.4/03 near pumping station, HB Colony, in CIR-1 area in Division No.28 of Vijayawada Municipal Corporation.(4th Call)
Provision of Pathway around Boundary Wall
REPAIRS TO BOUNDARY WALL, CHAIN LINK FENCING, BARBED WIRE, CONCENTRINA COIL AND PLASTERING AT NCB, NVAY HOUSE, RS, 32 WEU, CE (NAVY) OFFICE COMPLEX, NIRMAN PARK UNDER AGE B/R-I OF GE ND VISAKHAPATNAM
PROVN OF PERIMETER LIGHTS OF BOUNDARY WALL FROM MAIN GATE TO SAILORS MESS AT BVY, PROVN OF 100 KVA SERVO STABILISER AT DCN NODE AND PROVN OF INCINERATOR FOR COMNETCEN UNDER GE (U-I) VISAKHAPATNAM
REPAIR TO BOUNDARY WALL RCC COVER SLABS ON AREA DRAINAGE FENCING KERB STONES RAILING SEEPAGE AND OTHER MISC B R NATURE REPAIR WORKS IN CG COMPLEX MALKAPURAM CG JETTY VISAKHAPATNAM UNDER AGE I CG VIZAG
Construction of boundary wall, watch towers and guard rooms along with main entrance gate, internal roads, storm water drain along with rain water recharge pond, providing peripheral road lighting and alarm system for CIAT at CRPF Kalikiri, Chittoor ... of boundary wall , ...
Repairs to Hardstanding, PCC Pavements, Culvert, Stone Pitching, Retaining Wall, Compound Wall, Chain Link, Concertina Coil, Barbed Wire Fencing and Connected Items and Cleaning of Septic Tank, MH, SWT, Sewage Line, Repairs Replacement to Sewage Line
REAPIRS TO AREA DRAIN, HARDSTANDING AND PCC PAVEMENT,STONE PITCHING,RETAINING WALL, COMPOUND WALL,FENCING AND GATE AND CLEANING AND REPAIR OF SEPTIC TANK, MH SWT, SEWAGE LINE AT NAD BHEEMUNIPATNAM UNDER GE (P) NAVY KALINGA
REPAIR/ REPLACEMENT/ CLEANING OF SEWAGE LINE, MANHOLES, CULVERTS,COVERED DRAINS, SEPTIC TANK AND SOAKAGE WELLS ETC AND REPAIR/ REPLACEMENT OF GATES, CHAIN LINK FENCING, BARBED WIRE FENCING, CONCERTINA COIL, COMPOUND WALL, FOOT PATH, CULVERTS, DRAIN A
RTPP- Maintenance of Block plantation (18 Ha. Already developed during 2016-17) along the compound wall adjacent to Reserve forest and rear side of CHP and central stores of Stage-I for the Year 2020-2021
RTPP- Maintenance of Block plantation (18 Ha. Already developed during 2016-17) along the compound wall adjacent to Reserve forest and rear side of CHP and central stores of Stage-I for the Year 2020-2021
Construction of Primary School Building along with compound wall at R&R centre Devarajugattu of Peddaraveedu Mandal for Project Displaced Families of Gundemcherla and Katamaraju Thanda Villages of Peddaraveedu Mandal, Prakasam District under P.S. Veligonda Project
Construction of Community Hall along with Compound wall in R&R Colony Ondutla Village of Bestavaripeta Mandal for the Project Displaced Families of Sairam Nagar, Mettugondi,Lakshmipuram, and Krishna Nagar Villages of Ardhaveedu Mandal Prakasam District.
Construction of (06) Nos Concrete Benches for Sitting Arrangements, Internal & External Paintings to Cremation Shed & Compound Wall, in Vysya & Kshatriya Burial Ground, Seshugadda, in Ward No.01 under 14th Finance Commission Grant 2017-18 Basic Grant.
Construction of (06) Nos Concrete Benches for Sitting Arrangements, Internal & External Paintings to Cremation Shed & Compound Wall, in Vysya & Kshatriya Burial Ground, Seshugadda, in Ward No.01 under 14th Finance Commission Grant 2017-18 Basic Grant.
Constructions of 300mm dia C.C. Drains from devara subhamma house (15-1-134/1C) to rice mill compound wall (15-1-104) at 1st ward in Macherla Municipality. (Under 14th FC BG 1st instalment 2018-19)
Tadipatri Municipality - 14th Finance Commission 2016-17 - Construction of Compound Wall to a Length of 160 Mtrs to Sy.No.656/A&B, 657/P, 674, 675 L.P.No.536/86 at Ward No.28 (Non Slum Area)
construction of sri venkateswara swamy temple and sri Maha ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara Hills, Hyderabad(Part-B Construction of compound wall to alround the site)
Construction of CC Drain and Providing CC Road in Ramalayam Street (Chitneedi Padma Rao's House Street) from Pushkaram Road to Compound Wall in 11th and 12th Wards (Slum Area) (Under 14th Finance Commission 2015-16 Grant)
Construction of CC Drain from PN Aslam house to RTC Gafoor house in Kadathala veedhi and from Doctor Jaleel house to near Akhil theatre compound wall at ward no.12 in Gudur Nagarapanchayat under SFC Grants
14th FC 2015-16: Providing Transit point at Kailasapuram burial ground with the following provisions a) Construction of compound wall b) Construction of platform, c) Construction of Ramp d) Constructuion of shelter in chittoor municipal corporation
Construction of Community Training Centre building along with Compound Wall at Vemulakota R & R Center identified for project Displaced families of Akkacheruvu Thanda & Gottipadia part Villages of Markapur Mandal, Prakasam District Under Poola Subbaiah Veligonda Project .
Construction of compound wall around the temple andPradakshinam platform for Sri Ganga Sametha Sri Kasi Visweswara temple in R&R colony at Kongapadu village in Addanki Mandal, Prakasam district for Project displaced families of Dhenuvukonda village
construction of Compound wall and Silpi paintings to Sri Ganga Sametha Sri Kaasi Visveswaraya Swamy temple in the R&R Colony at Velamuripadu(V) for the PDFs of Denuvukonda (V) in Addanki(M) of Prakasam District
Development of 6.75acres(I.e construction of compound wall ,bush clearance ,desilting of about 1.25 acre pond ,drilling of bore well and fixing of pupset etc.) for instructional Livestock Farm at NTR College of veterinary science ,gannavaram.
Construction of Compound wall to vacant sites near D.No.77-85-1-41, D.No.77-105- 12, in Prajasakthi Nagar Circle-II area, Division No-58.under 14th Finance commission Grant for 2019-20 4th Call.
Construction of compoundwall at market yard,construction of brickwork and providing grills and grill doors to the market stalls besides JDoffice n construction of sheds for dryfish market along compound wall forVCTPLgate towardsSS-I in fishingharbour
Construction of collapsed compound wall and petty repairs, leveling of playground, renewing glass panes with putty and nails and railing at the 1st floor corridor etc (under special repairs) for KV School at Nellore., Andhra Pradesh
2022-Eng26-52-100 - Supply, Delivery and Fixing of Children Play Equipment, Outdoor fitness equipment walking track, Repairs and Painting for Compound wall in Karasa Park of ward No:52 in Zone 5 area of GVMC.
Completion of works like water pipe lines and drainage system, Wire fencing on the compound wall Completion of electrical works etc., to Dr.B.R.Ambedkar Gurukulam at Amarapuram (V&M) in Sri Sathya Sai District.. Est.Cost Rs.22.00Lakhs