Loading…
Loading…
10,571 results • Best match
Construction of (06) Nos Concrete Benches for Sitting Arrangements, Internal & External Paintings to Cremation Shed & Compound Wall, in Vysya & Kshatriya Burial Ground, Seshugadda, in Ward No.01 under 14th Finance Commission Grant 2017-18 Basic Grant.
Construction of Sri Venkateswara swamy temple and Sri Maha Ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara hills, Hyderabad (Part B- construction of compound wall to alround the site
White Washing, Leakage of Rooms, Flooring in Dining Hall, water sump, Electrification repairs, Mosquito Mesh, Repairs to Doors & Windwos, Compound wall, Const., of Bath Rooms etc., to Govt., BC Boys Hostel at Gudupalli in Chittoor District
Construction of compound wall to Muslim burial ground and Laying of CC road, drains and RCC culverts from sairam veedhi approach road to BSN Raju house in KNR Peta Merged Village in Anakapalle Zone of GVMC.
Construction of Compound wall to (4 Nos) Open sites i.e., at Swarajya nagar church park beside flyover bridge (02Nos) and Swarajya Nagar Park in division No. 17th (Under 14th Finance Commission Grant 2019-20)(3rd Call)
construction of sri venkateswara swamy temple and sri Maha ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara Hills, Hyderabad(Part-B Construction of compound wall to alround the site)
Construction of Compound wall to vacant sites near D.No.77-85-1-41, D.No.77-105- 12, in Prajasakthi Nagar Circle-II area, Division No-58.under 14th Finance commission Grant for 2019-20 2nd Call.
Construction of retaining wall on existing gedda by the side of TTD Kalyanamandapam and and construction of drain along the compound wall of TTD information centre at MVP colony in ward no. 17 of Zone-III
Construction of Sri Venkateswara swamy temple and Sri Maha Ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara hills, Hyderabad (Part B- construction of compound wall to alround the site
Providing Precast Compound wall, Irrigation facilities, with Walking Track and Sitting Lounges, Hardscape facilities in Public Park Adjacent of beach road at Sagar Nagar Entrance Arch, Ward No 06 in Zone-I area of GVMC Limits.
Completion of works like water pipe lines and drainage system, Wire fencing on the compound wall Completion of electrical works etc., to Dr.B.R.Ambedkar Gurukulam at Amarapuram (V&M) in Sri Sathya Sai District.. Est.Cost Rs.22.00Lakhs
Construction of retaining wall on existing gedda by the side of TTD Kalyanamandapam and and construction of drain along the compound wall of TTD information centre at MVP colony in ward no. 17 of Zone-III
Proddatur Municipality - Construction of Compound wall to Christian Burial Ground Located at Back side of Sachivalayam No 43 and 44 in Ward No 40 under 15th FC Untied Grant for the Year 2020-21 (1st Installment)
Construction of Compound wall with MS grills, plantation, RCC sitting benches and plantation at Simhapuri Colony VUDA Layout Phase-2 for an extent of (2.05 Acres open space) in Ward.No.98, Zone-VIII area of GVMC
Laying of 110mm Dia PVC Pipeline from Bible Church Compound wall to D.No.19/1828-A at Ujwala Hospital Back side in Sundaraiah Colony in Ward No.08 of Gooty Municipality Under general funds 2024-25
Development of Public park / Water body at Lankelapalem by Providing See through compound wall, Outdoor fitness gym, children play items, extension of MS pipeline of road crossing near Lankelapalem Junction in Ward No.79 of GVMC
157.70 Sq. Yds Vaccant Site at 1 Town Sivalayam Road, Gajulavari Street, Block No.-2, Town Survey No. 143 with Compound wall around on monthly rental basis (Excluding GST) enhancement for every 3 years at 30%
2023-Eng04-39-104 Providing compound wall, Kitchen shed, cement concrete tiles, installation A.C s of 12Nos and other miscellaneous works to Dr Deen Shadikhna at old post office in word no.39 of Zone-IV.
Construction of 600MM Size dia CC Drain and culvert and Formation of road from near Hanuman Temple to burial ground (Rachinayana Vanka) Via NCC Compound wall at NR Mattam in 17th DIvision of kadapa Municipal Corporation
Construction of Compound wall around the Sy.No.534 B/2 (Right side of Canal), Back side of Sy. No. 268B and opposite to NB Type Quarters in T-2 Section, TB Board, TB Board, TB Dam
Construction of North side Compound wall between the boundaries of 132/33KV SS Tenali and SPM shed & offices of APCPDCL, Installation of False ceiling in control room at 132/33KV Sub Station Tenali in Guntur District.
Desilting of drain at reading room to Railway Compound wall and Sai Baba Temple back side Kacha Drain of 6th ward Tadepalli under in AE-4 section of Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
Desilting of drain at reading room to Railway Compound wall and Sai Baba Temple back side Kacha Drain of 6th ward Tadepalli under in AE-4 section of Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
RTPP-Maintenance of block plantation ( 18 Hectares already developed during 2016-17) along the compound wall adjacent to reserve forest and rear side of CHP and central stores of Stage-I for the year 2019-20
2022-Eng26-52-100 - Supply, Delivery and Fixing of Children Play Equipment, Outdoor fitness equipment walking track, Repairs and Painting for Compound wall in Karasa Park of ward No:52 in Zone 5 area of GVMC.
Construction of Compound wall with MS grill, plantation, RCC sitting benches and plantation at Simhapuri Colony VUDA layout Phase-2 for an extent of (2.15 Acres open space) in WArd.No.98 Zone-VIII area of GVMC
Construction of Compound wall slow sand filter change of media in filter levelling and walking track and plantation at head works to the drinking water project at Borravaripalem village of Nizampatnam mandal Est.Cost Rs 30.00 Lakhs
Construction of North side Compound wall between the boundaries of 132/33KV SS Tenali and SPM shed & offices of APCPDCL, Installation of False ceiling in control room at 132/33KV Sub Station Tenali in Guntur District.
Development of Rama Colony Park (Compound Wall / Fencing, Maintenance of Path Way and Bund , Soft Scape Development, Play/Outdoor Gym equipment, external electrification and illumination works, Gazebo, park furniture) in Ward No.23 of Salur Municipality.
Construction of Compound wall to the site pertaining to the Office of the Executive Director, Dist. SC. Co-operative Society Ltd at Auto Nagar, Nellore, Nellore Rural Mandal in SPSR Nellore District under PM AJAY Scheme
Construction of compound wall to Burial Ground and open room with roof slab in Burial ground at Medarametla village adjacent to the Medarametla to korisapadu Donka road in korisapadu (M) ,Bapatla District (M).Est.cost-30.00 Lakhs.
Construction of Sri Venkateswara swamy temple and Sri Maha Ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara hills, Hyderabad (Part B- construction of compound wall to alround the site
Arresting Roof leakage of control room slab, Rennovation of Existing PLCC Room, Painting to the control room, compound wall, Internal electrification to the control room and other miscellaneous works at 132kVSS Kavali in SPSR Nellore District
Construction of (06) Nos Concrete Benches for Sitting Arrangements, Internal & External Paintings to Cremation Shed & Compound Wall, in Vysya & Kshatriya Burial Ground, Seshugadda, in Ward No.01 under 14th Finance Commission Grant 2017-18 Basic Grant.
construction of sri venkateswara swamy temple and sri Maha ganapathi temples complex with infrastructure facilities and studio and administrative building for SVBC at Banjara Hills, Hyderabad(Part-B Construction of compound wall to alround the site)
Reconstruction of damaged compound wall , Raising of existing compound wall and providing railing in ward no 13 of East zone
Reconstruction of damaged compound wall , Raising of existing compound wall and providing railing in ward no 13 of East zone
REPAIRS TO CHAIN LINK FENCING BARBED WIRE FENCING CONCERTINA COIL, COMPOUND WALL, RETAINING WALL, GUIDE WALLS, HAND RAILS, FOOT PATH, HARD STANDING, AREA DRAINS, STONE PITCHING, SPORTS FACILITIES AND CERTAIN MISC B/R WORKS AT MAINT
Construction of Compound wall to Municipal Office.
Special Repairs to Rusted, Broken and Unserviceable Perimeter Light, Pole, Area Lighting, MCB, Main LT Panel and Connected EM Works at INA Karna and Provision of Search and Perimeter Lightings along Boundary Wall of INS Kalinga
REPAIR TO STORM WATER DRAIN, PATH, CULVERT BOUNDARY WALL, CHAIN LINK FENCING, BARBED WIRE, CONSERITNA COIL, PALSTERING AND REPAIR REPLACEMENT OF SEWAGE LINE, CLEANING, MANHOLE, SEPTIC TANK, STP AND OTHER CONNECTED AND MISC WORK AT KRISHNAPATNAM
Construction of Security Access Control, High Security Boundary wall & 2 No's Watch tower for state Arms Depot at 6th Bn, Mangalagiri of Guntur District - Sub Work: Supply, Installation, Testing and Commissioning of 125 KVA DG Set
Name of work : BZA Division ABSS - Proposed Construction of Tadepalligudem (TDD) Station Left over works of Cable trench , Watering arrangements and PF Surface ,COP Shelter , Circulating area development, Extension of Existing Station building with ... Facade, Compound walls and ...
REPAIRS TO WALL, PCC COPING PLASTERING, STEEL GATE AND PAINTING TO COMPOUND WALL AND REPAIRS/REPLACEMENT OF CONCERTINA COIL, BARBED WIRES ANGLE IRONS AND FENCING GATE TO SECURITY WALL AT INS KALINGA UNDE GE(P) NAVY KALINGA
REPAIRS TO CHAIN LINK FENCING BARBED WIRE FENCING CONCERTINA COIL, COMPOUND WALL, RETAINING WALL, GUIDE WALLS, HAND RAILS, FOOT PATH, HARD STANDING, AREA DRAINS, STONE PITCHING, SPORTS FACILITIES AND CERTAIN MISC B/R WORKS AT OFFICER MARRIED
REPAIR REPLACEMENT CLEANING OF SEWAGE LINE MANHOLES CULVERTS COVERED DRAINS SEPTIC TANK AND SOAKAGE WELLS ETC AND REPAIR REPLACEMENT OF GATES CHAIN LINK FENCING BARBED WIRE FENCING CONCERTINA COIL COMPOUND WALL FOOT PATH CULVERTS DRAIN AND CONNECTED
Providing of CC Road from Velugu Office Building to South West side of the Compound wall of the Dumping Yard for the Transportation of Sanitary Vehicles in Dumping yard in Rayadurg Municipality Under SAC Grant 2017-2018
Construction of Mini Stores of size 24M x 15M with Galvalume Trapezoidal Profile Roofing for keeping stores materials, Compound wall, CC approach road and Plotforms at 33/11 KV SS Narsipatnam of Narsipatnam Division in Visakhapatnam Circle
Maintenance & Repairs to Godown No. 1 and platform at Sub Market Yard and Construction of Toilet Blocks, Construction of Collapsible Compound wall Providing Bore well and Water supply arrangements at Sub Market Yard, Agiripalli under A.M.C., Nuzvid.
Construction of Sub Station near Stage 2 Pump House under Siddapuram Lift Irrigation Scheme in Kurnool District Civil Works (Civil Works i.e., Construction of Control Room, Compound Wall and Electrification at Stage 2 Pump House)(2nd Call)