Loading…
Loading…
6,158 results • Best match
REPAIR/ MAINT OF FENCING, BOUNDARY WALL, DRAINAGE, HARD STANDING, SEWER LINE, MANHOLES AND CLEANING OF SEWER APPURTENANCES AND SEWAGE LINE IN NOM VARUNA, NCN DATA CENTRE AND PALAM BAGH IN THE AOR OF AGE B/R NAVY UNDER GE NEW DELHI
ATTENDING DAY TO DAY COMPLAINTS, REPAIR TO SEWAGE LINES, MANHOLE COVERS, CLEANING OF MANHOLES, SEWAGE LINES, SOAKWELL AND BOUNDARY WALL AT SOUTH CAMP AND NORTH CAMP OF 274 TRANSIT CAMP UNDER AGE B/R-I OF GE (SOUTH) DELHI CANTT-10
Installation Cement Concrete paver blocks in the parking area in PS Tilak Nagar, Installation of sewer line near mess in PS Tilak Nagar, Garden park track in Police Colony Tilak Nagar, Railing of the backside Boundary wall of the Police
MISC REPAIR/ MAINTENANCE OF CEILING TILING PLASTERING AT JCOs MESS MAIN OFFICE BOUNDARY WALL BLDG NO P-186 187 188 AND P-9 BLDG WORKS AND REPLACEMENT OF OLD WIRING INCL FIXTURE/ FITTING AT RRRC UNDER GE (CENTRAL) DELHI CANTT-10
Renovation/Up-gradation Of Boundary wall of parks by pdg. Brickwork, marble wash, painting, red sand stone etc. opp. H.no. D-542,D-546 (Mother dairy),D-572 near Central School in D-Block Tagore garden Ward-96/WZ, Rajouri Garden.
Imp. and Dev of Park Boundary wall and Footpath by pdg. tiles, Marble wash plaster, etc. Near H.no.6/28, H.no. 6/128 and H.no.6/78 in 6 Block Subhash Nagar in Ward No. 98/WZ Subhash Nagar. AC-28
Imp. Dev. of lanes, Drainage system by pdg. RMC from H.No. 102 to 104, H.No. 108 to H.No. 116 and H.No. 102 to H.No. 77A and Boundary wall along AP-Block in Pitam Pura at Ward No. 57/KPZ AC-14
Imp./repair of Boundary wall and entry gate of Park near H.No. 4/142, 4/153 and 4/208 in 4 Block Subhash Nagar by pdg Marble wash, B/work, stone tiles etc in Ward No. 98/WZ Subhash Nagar.
M/o various scheme under Nazul A/c-II (East Zone). Sub Head-C/o R.R. masonry boundary wall i/c repair/raising of existing stone masonry wall of DDA vacant land as per site requirement in Tahirpur/Seemapuri area
Imp. Dev. of parks by pdg. boundary wall and Gate of near H.No. KP-6, H.No. KP-206, H.No. 16, H.No. 92 and central park, construction of hut in central park in KP-Block at ward No. 57/KPZ AC-14
E.O.R. to Govt. Girls Sr. Sec. School at Pataudi House, Darya Ganj, Delhi (School ID-2127020) under SRD Project Division-I/Sub-Div-III, PWD, New Delhi. (SH Repair/renovation of toilets, boundary wall and shaft alongwith replacement of damaged sewer
Imp. and Dev. of Park Boundary wall and Footpath by pdg. Coloured Interlocking tiles, Marble wash plaster, etc. Near H.no. 4/85, 4/260 and 4/97 in 4 Block Subhash Nagar in Ward No. 98/WZ Subhash Nagar AC-28
A/R and M/O VIP flats and bunglows under Sub Divn. IV, SRD-1, PWD, New Delhi dg. 2025-26 (SHRepair work of internal road, drainage system, boundary wall and some other misc. repair work in flats and bunglows).
EOR to 650 bedded Deen Dayal Upadhyay Hospital, Hari Nagar, New Delhi SH- Repairing of existing Boundary wall, provision of Concertina coil and artistic painting on the external facades of the hospital boundary of DDU hospital, Hari Nagar, New Delhi.
EOR to GGSSS Harkesh Nagar School (School ID- 1925341), New Delhi during 2023-24. (SH Construction of boundary wall and guard room, granite flooring in corridor, repair and renovation work in principal room and stainless steel main gate of School)
EOR to Sarvodaya Kanya Vidyalaya, Moti Nagar, New Delhi. SH-Demolition and reconstruction of boundary wall of primary block, water proofing treatment of primary block, granite work in herbal vatika, wall tiles and floor tiles in girls toilet in prima
EOR to Rajkiya Pratibha Vikas Vidyalaya, Sector-10, Dwarka, New Delhi under Sub Division- III of SWBMD, New Delhi during 2023-24. SH-The boundary wall, all class rooms, corridor, interior and exterior apex whitewashing paint in the school building
A/R and M/o to various roads under Sub Division-2, SRD Project Division -2, PWD, New Delhi. (SH Improvement of Boundary Wall and Construction and Repair of footpath at Ramkumar Marg (from Rani jhansi road to MCD road.).
Construction of porta cabin hall at MLO office and renovation work of existing halls along with grit wash on boundary wall of office premises at Motor Licencing Office, Transport Department, Govt of NCT of Delhi, Wazirpur, New Delhi (SH Electrical
Imp. of existing boundary wall by Pdg. Brick wall at Pocket-14 from near flat No. 91 to near flat no. 101 and near flat no. 81A to near flat no. 91A in kalkaji Extn. in Ward No. 178, CNZ.
Widening of road from Prembari Pull to Singhalpur village labour chowk including construction of Toilet block, RCC Boundary wall, RCC drain, Footpath work etc. under PWD Division NW R-1 and Sub Division NW R-14 Delhi, during 2025-26
Construction of Kho Kho ground Synthetic Volley Ball Court Synthetic Basket Ball Court Change Room Boundary Wall and Development works in the premises of Govt Co Ed Sr Sec School Jaffarpur Village ID No 1822055 Najafgarh N Delhi (2nd call)
Raising the height of existing boundary wall along with providing and fixing concertina coil and other misc. work underneath the vacant space in the Sagarpur flyovers on Pankha Roads under Sub Division-21/SWR-II/PWD, New Delhi during 2025-26.
EOR to Sarvodaya Kanya Vidyalaya School ID 1515021, Rajouri Garden Extn, New Delhi. SH Repair and raising of existing damaged tilted boundary wall, providing and fixing of iron grills i.c concertina coil, repair of pathway, filling of good earth in
Making of ramp, repair of entrance gate, providing and laying paver block, CC pavement, replacing sewer line, replastering of boundary wall and weather coat of the front wall of the staff quarter ( Old Block) of University Hostel of Women , Universi
Special Repair to Dr Hedgewar Arogya Sansthan Karkardooma Delhi Dg 2023 24 SH Replacement of damaged CGI sheet with puff panel sheet shed over pharmacy and OPD registration room Providing missing grill in boundary wall and aluminum windows at Dr Hed
EOR to GGSSS Block 27 Trilokpuri Delhi 110091 dg 202324 SH Provision for Construction of new gate provision for sewer line and connection with main sewer line provision for renovation of guard room and stone cladding in front boundary wall
Provision for 1. Construction of front side boundary wall near main gate 2. Complete renovation of toilet blocks of old Building at Sarvodaya (Co-ed) Vidyalaya, Masjid Moth, New Delhi. (School ID 1925246, Building ID 19251141 and EOR ID 20211430).
Repair renovation to GPRA flats of nivedita Kunj campus dg 2024-25 ( SH providing and fixing GI profile sheet conertina coil on boundary wall MS Sheet door on roof shaft and GI chain fencing around basket ball and badminton court
CLEANING TO SEWAGE LINE, MANHOLES AND CERTAIN REPAIR/ MAINT TO DRAINS, SEWAGE LINE, MANHOLES, PATH, HARD STANDING, BOUNDARY WALL AND OTHER MAINT TO MD ACCN AREA AT SANYAT LINE, KARAM VIHAR, TIGRIS MOUDE LINE, SUMERAIN LINE, NEW MOUDE LINE AND CERTAIN
EOR to sch under SD M-3223 dg 23-24SH Renovation of toilet improvement of area near boundary wall aesthetic improvement of exterior facade cons. of temporary store room and misc civil works at S(Coed)V Pratap Nagar Del
Repair and construction of RCC column and boundary wall covered with concertina wire at PT and Parade ground under the Metro Line and providing concertina wire/wire mess, view cutter of fiber/acrylic sheet at DPA/Dwarka Sec.-09, Delhi.
A/R and M/O to various roads under NE (B and R) Maintenance Division dg. 2022-23. (SH- Repairing of underground old damaged pipe line on Gamri Road and Construction of boundary wall from Hanuman Mandir to Fire service......
EOR to Govt. Boys Senior Secondary School, Shadi Khampur, New Delhi. SH Repairing and raising up of boundary wall with concertina coil, ground level has gone up due to new construction of building in Priority - II Civil and Electrical Work. (BW)
EOR to Govt. Girls Sr. Sec. School, Bankner, Delhi 40. (SH Renovation of toilet block in A,B and C block, repairing of boundary wall replacement of gate repairing of Guard room and fixing of fencing wire) (Sch. ID 1310049)
M/o Completed scheme under Nazul A/c-II (SZ).S.H.-Repairing of existing footpath, repair and raising of boundary wall, fencing with concertina coil and other misc. works at M/o NHP E- Block, D-Block and J- Block Saket.
A/R and M/O to Aam Aadmi Mohalla Clinics at various Constituencies (Rithala, Rohini, Shalimar Bagh, Trinagar, Wazirpur) under Division North-West Building -1 PWD, Delhi during 2019-20. (SH Construction of Damaged Boundary wall, Supply of Water Meter
AR and MO to Delhi Secretariat at IG Stadium Complex New Delhi dg 2024 25 A SH Cleaning of windows cladding and facade by Facade Cleaning System B SH Providing service for cleaning of boundary wall poster cleaning at various places
EOR to Sarvodaya Kanya Bal Vidyalaya Old Seelampur Delhi during 2022 23. SH Up gradation of computer labs Cal lab Library conversion of hall into meeting room laying of paver blocks raising of boundary wall and other miscellaneous maintenance work
EOR to Govt. Girls Sr. Sec. School No-2 (School ID 1925046)Tughlakabad railway Colony, New Delhi during 2023-24 (SH White washing of Block I, IV and IX repair and white wash of boundary wall and other misc. civil works)
Improvement of boundary wall, Gates and Open Gym Area in Park at Wing Comm. M. K. Jain Marg near Rajiv Gandhi Cancer Institute by pdg. brick work, steel work, CC Paver blocks, Stainless Steel and grit wash in W.No.148/SZ.
MAINT AND REPAIR OF FENCING, BOUNDARY WALL, DRAINAGE, HARD STANDING, SEWAR LINE, MANHOLES AND CLANING OF SEWER LINE APPURTENANCES AND SEWAGE LINE IN CHANAKYA BAGH AND NARAINA BAGH AND MAINT AND REPAIR TO JOINARY, PLASTER AND PAINTING (INTERNAL AND EX
EOR to SKV Pocket IV Mayur Vihar Phase I Delhi dg 2020 21 SH Laying of sewerline, exterior wall cladding of old building replacement old MS windows with new aluminium windows, construction of damaged boundary wall, interlocking tile of old building
IImp./Dev. of Boundary wall of horticulture park in front of B-9, B-block Dilshad Garden and labour room of kranti park in front of B-43, B-block Dilshad Garden in ward no. 217 Dilshad Colony Sh(N)Zone
A/R and M/O to Various building under PWD Sub Division NW B-13 During 2020-21 ( Raising of front and side boundary wall with M.S Grill and concertina coil laying paver block and other misc. works in Horticulture office )
Repair and construction of RCC column and boundary wall covered with concertina wire at PT and Parade ground under the Metro Line and providing concertina wire/wire mess, view cutter of fiber/acrylic sheet at DPA/Dwarka Sec.-09, Delhi.
EOR to Sports Complex, Opposite Nightingale Society, Vikaspuri, New Delhi. SH Construction of Boundary wall, guard room at gate no.3, Repair and Renovation of Toilet Blocks, Providing Chain Link Fencing at front side of visitors sitting area and colo
Protection of DDA land.Sub-Head- Construction of boundary wall in South Zone lands handed over to Forest Deppt. in compliance of directions of Honble Supreme Court of India in the matter of Bindu Kapurea vs Subhashish Panda at village Satbari.......
A/R and M/O to various roads under west road -2 During 2025-26 (SH- Repairing and Raising Height of Boundary Wall on Baba Ramdev Marg near Pragati Apartment Under Sub Division WR-24, Multan Nagar New Delhi-110056).
M/o various scheme under Nazul A/c-II (EZ). SH - Demolition of RCC structure, construction of room, rainwater harvesting system, raising height of boundary wall and other miscellaneous works at Rose Garden between Feroz Shah Kotla and Ring Road.