Loading…
Loading…
5,161 results • Best match
Please refer BOQ
AS PER NIT
please refer BOQ
refer BOQ
please refer BOQ
please read BOQ
Refer BOQ
Please Refer BOQ
AS PER NIT
AS PER NIT
AS PER NIT
PLS REFER NIT
PLS REFER NIT
Construction of 3 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, Construction of 3 Nos Pump Room, 2 Nos Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Mangota Chaprian (JJM).
Construction of Compound Wall at Shishu Samadian Kailash Vihar near Tube well , Const. of lane by way of tile Work from the Garage of Er. Raj kumar to H/o Sh. Sanjeev sharma Patta Paloura in Ward no 61.
Construction of GSRs 15000 Gls GSR (one Number),10000 Glns(three Number),20000 Glns GSR (three number) ,Pump Room(two Number),Spring Cover (zero number) including compound wall, entrance gate, R.M, pipe network Water supply scheme Ghani under J
Construction of GSRs 5000 Gls GSR four Number,10000 Glns four Number,Pump Room four Number,Spring Cover two number including compound wall, entrance gate,R.M pipe network Water supply scheme Upper Salwah Dori Maal Nad Chowki under JJM
Water Supply scheme Thandi Kassi under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, 1 No. pump room building, 1 No. 20000 Glns Sump Tank and 1 No. compound wall at WSS Thandi kassi
Construction of 3 No 10000 Gln GSR, ,2 Nos Pump Room, 3 Nos. collection tank , 3 Nos. spring cover ,01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Dabrote (JJM).
Construction of 09 Nos. (Nine Nos.) 5000 gallons per hour capacity Rapid Sand Filtration Plant along with Construction of Pump Room , Construction of 0.20 lacs glns cap. Sump Tank , Construction of Intake well , Compound Wall each under WSS Kalas,
Construction of 01 No.10000 gallons per hour capacity Rapid Sand Filtration Plant, along with Construction of Pump Room, Construction of 0.50 lacs glns cap. Sump Tank, Compound Wall, Const. of intake well under WSS Badhoon-B, (under JJM).
Construction of 4 No 10000 Gln GSR, 1 No. Collection Tank , 02 Spring cover, 2 Nos Pump Room, 02 Nos. Compound wall, 01 No. Protection work , Laying and Fitting Rising Main and Distribution system under WSS Tundi Trar (JJM).
Construction of 3 No 20000 Gln GSR , Construction of 1 No 10000 Gln GSR , 2 Nos Pump Room, 02 No. Compound Wall, 01 No. Spring cover , Laying and Fitting Rising Main and Distribution system under WSS Khablan-B (JJM).
Augmentation of existing swimming pool in M.A Stadium Jammu by way of construction of Toddler Pool, fixing of granite in sitting tiers, VIP gallery, Kota stone flooring around the Pool, construction of Poarch, Compound wall and other allied works.
Water Supply scheme Draj-B under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, Dug Well, 1 No. Pump room Building , 1 No. 20000 Glns Sump Tank and compound wall at WSS Draj-B
REPAIRS TO FOOTPATH, COMPOUND WALL, CHAIN LINK FENCING, CULVERT, RETAINING WALL, PAVER BLOCKS, RAILING, CHEQUIRED TILES, GATES AND OTHER ALLIED WORKS AT SRINAGAR COLONY, PERIERA ENCLAVE AND MINNIEBAY AREA UNDER AGE B/R II AT GE MINNIEBAY, PORT BLAIR
CLEANING OF SEWAGE LINE SEPTIC TANKS AND MANHOLE IN REPAIR TO BOUNDARY WALL DRAIN IN MD ACCN AT HQ NC CAMP HRDC A MESS AND TA COY NCCIU UNDER AGE B/R-II GE (SOUTH) UDHAMPUR
As per NIT
SPL REPAIR TO BOUNDARY WALL AT HQ 135 WORKS ENGRS AND 50 ARMD REGT AND GM VIHAR INCLUDING PROVN OF CENTRAL BATHROOM FOR JCOs AND OR (SEPARATE TOILET AND BATHROOM) AT INT UNIT AT AKHNOOR UNDER GE (N) AKHNOOR
Construction of 5 No 10,000 Gln GSR/Sump Tank, 2 No 5000 Gln GSR, 1 No 20000 Gln GSR/Sump Tank, 1 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Rajpur Bhatta (JJM).
Construction of 4 No 10,000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR, 3 No Pump Room, 2 No 20000 Gln GSR/Sump Tank and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Middle Kangri (JJM).
Protection of boundary wall and repair of drain back side of Government higer secondary school kah pota w no 6,Pyt Kanyala, Block Dansal. under component PRI Grants District Capex Budget for the year of 2024-25 (Panchayat Level)
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Basawa
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Kieur
Construction of Ramp renovation upgradation of boundary wall by way of demolishing the old wall and constructing new wall along with dismantling the unfit structures, providing concertina fencing on back side wall other allied civil works at JK Gue
C/o 45 suits SOs mess ASI accommodation at ITBP campus Panthachowk Srinagar JandK. SH. Providing consultancy for complete structural design and drawing for SOs mess 45 suits boundary wall and retaining wall at ITBP campus Panthachowk Srinagar JandK.
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Chagyal
Construction of 1 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 20000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Dabber Potha B (JJM).
Construction of 4 No 10,000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR, 3 No Pump Room, 2 No 20000 Gln GSR/Sump Tank and 420mtr Boundary Wall, Rising Main and Distribution system under WSS Middle Kangri (JJM).
Construction of retaining wall, Painting of school building and boundary wall, C. C. pavement path from main entry gate to school building and repair of doors, windows in toilet and bath at Kendriya Vidyalaya, Hiranagar, Distt. Kathua (J&K).
Construction of Sub Centre at Margi Warawn by way of Construction of Compound wall around Sub Centre Margi Warwan Construction of approach path towards Sub Centre Margi Warwan and Construction of 3 Mtr Height R Wall at Sub Centre Margi Warwan
Construction of 13 Nos. (Thirteen Nos.) 5000 gallons per hour capacity Rapid Sand Filtration Plant, along with Construction of Pump Room, Construction of 0.20 lacs glns cap. Sump Tank, Compound Wall each under WSS Fatehpur Khass, WSS Khablan-B , WS
Construction of 04 Nos. (Four Nos.) 10000 gallons per hour capacity Rapid Sand Filtration Plant along with Construction of Pump Room, Construction of 0.50 lacs glns cap. Sump Tank, Compound Wall each under WSS Gurdan Bala, WSS Saaj, WSS Rajdhani To
Construction of GSRs 5000 Gls GSR (one Number),10000 Glns(Six Number),20000 Glns GSR (Zero number) ,Pump Room(Two Number),Spring Cover ( two number) including compound wall, entrance gate,R.M pipe network for Water supply scheme Balnoi under JJ
Insulation of Feeder No 4 of Receiving Station Balhama and Feeder No 2 of Receiving station Pampore 1st passing in front and along the compound wall of the IOCL Campus by way of replacement of overhead conductor by Overhead XLPE cable.
GE S U 62 2021 22 REPAIR TO SECURITY WALL COMPOUND WALL PATH DRAIN AND MISC WORK IN MD ACCN SINGLE LIVING OFFICE COMPLEX OF HQNC CAMP HRDC A MESS AND TA COY UNDER AGE BR II GE SOUTH UDHAMPUR
Construction of GSRs 5000 Gls GSR (seven Number),10000 Glns(one Number),20000 Glns GSR (one No) ,Pump Room(one Number),Spring Cover (zero number) including compound wall, entrance gate, pipe network for Water supply scheme Paloon Hattian under J