Loading…
Loading…
84 results • Best match
Bituminous surfacing of approach road to Auto section at Gevra Project of Gevra AreaBituminous surfacing of approach road to Auto section at Gevra Project of Gevra Area
Scheme for Construction of Bituminous Road of length 1300 meters and width 3.40 meters including Clearing and Grubbing, WMM Base, Prime Coat, Tack Coat, Bituminous Macadam, Bituminous Concrete, Road Marking and Earthen Shoulders from Magazine to D1 a
Providing and Laying of Bituminous Concrete Topping and Guard Wall OverApproach Ramps Ash Dykes at NTPC Farakka.
R and M of Township Bitumen Road and Pathways at KSTPS
R and M of Township Bitumen Road (Branch Road) at KSTPS
REPAIR AND MAINTENANCE AND CONSTRUCTION OF BITUMEN ROAD AT PLANT FORNTPC KORBA STPS
Repair and Maintenance of Bituminous Road at NTPC Farakka.
Construction of Bitumen Road, RCC Retaining Wall and RCC Drain at stage-Iash dyke of NTPC Kaniha.
Re-carpeting of Bituminous road within premises of Central Workshop Korba.
Development of Peripheral Bituminous road development along toe drain atash dyke NTPC, BgTPP
Re-carpeting of existing Bituminous road in of Premises of CEWS, Gevra.
Re-carpeting of Bituminous road at SBS colony under CWS-CS Korba.
SPL REPAIR TO LT UG CABLE AND CONNECTED ITEMS NEAR BLACK TOP GROUND AND RCTC INSIDE VIJAY DURG UNDER GE(VD) KOLKATA
Repair/Renovation of black top approach road to Magazine building from main road near Shakti Nagar Barrier at Gevra Project of Gevra Area
Repairing of Berm to protect main transporting black top road and road marking, stud from Jarhi chowk to Thana chowk (6.00 km) at Bhatgaon Area.
Resurfacing of balance colony Road (Bituminous Road) By black tapping at SBS colony CWS, Korba.
Resurfacing of Bituminous road and level correction at AIIMS Raipur Residential Complex, Kabir Nagar, Raipur.
Repairing and straightening approch bituminous road mines colony of Kumda Sub Area of Bishrampur Area.
R and M of Bituminous Road Inside Township and outside Peripheral Roads andMisc. Civil works at NTPC-SSTPS area
Development of Bituminous Road from Coal India Chowk to MTK (01) at KOCP of Kusmunda Area
Construction of bitumen Road from Store R and I office to rail trackbetween IDCT-3 and IDCT 4/5 and from stage-IV TP-30 to road at ESPStage-III along the rail track in Plant at FGUTPP.
Repairing of approach bituminous road from PWD Junction to Gate No-1 at Amgaon OCP of Bishrampur Area.
Repairing of Approch Bituminous road from PWD junction to Gate No.1 at Amgaon OCP of Bishrampur Area.
S-CPG1-67 REPAIR AND RECARPETING OF BITUMINOUS ROAD AT TOWNSHIP AND PLANT AREA OF NTPC MAUDA
Repairing of bituminous road from Kabir chowk to KB-2 (CISF Check Post barrier) at KOCP of Kusmunda Area.
Resurfacing, recarpeting of bituminous road near Suhana hotel to jagannathpur HP petrol pump at Jagannathpur OCP of Bhatgaon Area.
Conversion to Bituminous Road of the Existing Top at Lagoon I and Lagoon III in Ash Dykes at NTPC Lara
Construction of Bituminous Road from 6 and 7 Incline to 10 number Incline at Rajgamar Sub Area under Korba Area.
Patch Repairing of existing Bituminous Road from NH - 43 to Ketki Under Ground Mine of RGK Sub Area of Bishrampur Area.
Construction of Bitumen Road and Pipe Culvert and allied works for Augmentation of Fuel and Flux Crushing Facilities Package No 064 for Bhilai Steel Plant at Bhilai Chhattisgarh
Repairing of Bituminous road from Main road (Kharsia-Dharamjaigarh State highway) to workshop at Dharam colony of Chhal sub Area (3nd Call).
Construction/Repairing of BT Road At Prachi Flex to Nilkanth chowk W- 15,16, Gandhi chowk to Nirajchandrakar Shop 17,18,27, Vijay Sao house to MohariBhata Nahar W28, Ruprela Shop to Old Bazar to Kabristan W14,19 Dr. Vishwas house to khatri house to subhash nagar W22,23, Gulshan chowk to Ayodhya nagar Road W03,04, Transformer chowk to Shatrughan Yadav house W4,5,6 Mahasamnund
Construction/ Repairing of BT Road Dassera Maidan to Mandi gate w23,24,25,30 Vithoba Talkies to Shastri chowk w15,16,27 and Jagat Paan center to shiv chowk Ward 08,11 Mahasamund
Laying of paver block work in side shoulder of existing bituminous road of non-residential area of CISF, RTC, Utai, Dist. Durg, Bhilai, during 2023-24.
Widening and Bituminous Carpeting of Gevra-Kusmunda bye pass road of Gevra Area for 4590 metre bituminous road and 1400 m Cement Concrete Road with Box Culvert .
Construction/Repairing of BT Road At Ekta chowk to Imlibhata nahar W- 02,03,10, Gulshan chowk to Nurani chowk to Tiwari building to Atal Awas 04,05,06, Dhelu Khan house to Pawan Patel house W22,23, Khallari Mandir to Bhaleshwar Road Ward 29 Mahasamnund
Repairing and re surfacing of bituminous road from GM square to welcome gate and officers colony to DAV School i/c RCC drain and PCC shoulder for some portion at AHQ Korba Area.
Construction/Repairing of BT Road Pipal chowk to Dhobi Kuan W18, Nahar to Gaura choura to neha Ata chowk W 25, Gandhi chowk to rakeshchandrakar house w17,18 Hira chopda house to Pipal chowk W15,18, Beside Gurudwara Gali W 13 Mahasamund
PROVISION OF BITUMINOUS ROAD OF LENGTH 237 METRE FROM MAIN ENTRANCE GATE TO BUILDING NO T-42 AND ADJOINING AREA IN TA Bn LOCATION AT NAYA RAIPUR MILITARY STATION UNDER AGE(I) NAYA RAIPUR
Cleaning and sweeping of bituminous road by brooming from colony gate to sharda mandir road junction at Gare Pelma IV/2 and 3 (For 730 days) (Excluding Sunday and PHD, Net Working day- 610 days)
Repair and renovation of entrance by providing CC approach road, 02 Nos entrance gates, CC approach road, shifting of existing bituminous road and boundary wall at CHP and Wharfwall under Bhatgaon Sub Area of Bhatgaon Area.
Strengthening of Bituminous Road from NH43 to Amgaon OCP of Bishrampur Area for coal transportation for the mines Amgaon OCP, Ketki UG, Raher UG and Gayatri UG leading Jainagar siding and Kumda Siding with Length of 22.40 Kms including DLP of 5 years
Improvement of service Road connecting RSD weighbridge to RSD Goods Complex near WRS colony Raipur. (This work Primarily involves the Bituminous road surfacing i.e flexible pavement work of existing dilapidated road connecting RSD weigh bridge to RSD Goods Complex near WRS Colony Raipur.)
Bitumen Road work at Sunaliya Bridge to Power House Raod Fatak (Under Bridge Road) at Korba
Bitumen Road work near Shree Medico to Dadar Nalal Culvert (Hanuman Mandir) Under R.S.S. Nagar Zone
Construction of BT road (50m x 7m), CC road, material stacking platform inside DSD, Raipur. Construction of store office (4m x 6m) at DSD Raipur, Chain Link Fencing (100m) and pipe line wok at DSD Raipur.
Vacuum Blood Collection Tube Red Top (Q3), Vacuum Blood Collection Tube Black Top (Q3), Vacuum Blood Collection Tube Grey Top (Q3)
Bitumen Road work at Power House Road Fatak to Old Bus Stand (Under Bridge Raod) at Korba
CONSTRUCTION OF BT ROAD AT DSVCKV PREMISES ANJORA DURG
Construction of BT Road Froma Gandhi chowk to Bazar chowk