Loading…
Loading…
5,458 results • Best match
Providing and laying 25mm thick bituminous concrete with Paver Finisher in KM 3/00 to 4/00, 6/00 to 7/00, 7/00 to 8/00 and 8/00 to 9/00
Periodical maintenance on Kheel to Pangna road VR- 0075 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 4/00 to 5/500)
(SH Providing and Laying 30 mm thick Bituminous Concrete and Hot Thermoplast line in km. 0/0 to 2/0, 5/0 to 7/0 and 10/0 to 14/0) 8.00 km)
Link road Tuklera Laleen road VR003610102 KM 1/00 to 2/00 Link road Ser to Talasi road VR003910101 KM 0/00 to 1/00 SH Providing and laying 25mm thick Bituminous concrete
Periodical Renewal on Kaloha Pragpur Dhaliara Dada Siba Sansarpur terrace road SH. Providing and laying 30mm thick bituminous concrete with paver finisher in km 38.200 to 40.350 MDR46 during the year 2019-20
Providing and laying renewal coat using Bituminous Concrete 25mm thick i/c rectification of surface and Thermoplastic Paint Strip between KM RD 45/0 to 46/0 and 54/0 to 59/0
Construction of HPC at RD 2/370, Removal of slips, P/L GSB, G-II, G-III, 50mm thick DBM, 30mm thick single layer Bituminous concrete and 2.5mm thick (10cm wide) Thermoplastic paint
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 5/0 TO 7/0 AND 0/0 TO 1/0 RESPECTIVELY) (UNDER PMGSY WITH PAVER FINISHER). DRRP NO. HP-03-03 VR00005, VR0007.
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 25/0 to 26/0 27/0 to 28/0 33/0 to 34/0 35/0 to 36/0 ) 4.00 km
Periodic maintenance of Chamba Tissa Road Km 32/250 to 62/0 for the year 2021-22 Providing and laying bituminous concrete and const. of PCC drain at 50/0 to 51/0).
P/L 30mm thick bituminous concrete on Sandhole to Cholangarh Road Km. 97/0 to 98/0, Saroun to Dayol Road Km.78/0 to 79/0 and 82/0 to 86/0)
Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/000, 1/000 to 2/000, 2/000 to 3/000 and 3/000 to 4/000
Providing and Laying 25mm thick Bituminous Concrete along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 1/00 to 3/00) Under AMP 2025-26.
Providing and laying built-up spray grout, tack coat, bituminous concrete 30mm thick and thermoplastic strip in km. 3/00 to 4/00, 4/00 to 5/00, 5/00 to 6/00).
Providing and laying built-up spray grout, tack coat, bituminous concrete 30mm thick and thermoplastic strip in km. 0/00 to 1/00, 1/00 to 2/00, 2/00 to 3/00).
Providing and Laying 25mm thick Bituminous Concrete along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 4/700 to 6/00) Under AMP 2025-26.
cross drainage structure Metlling Tarring GSB WBM Tarring Cement Concrete Pavement interlocking Concrete Block Pavement drain Road side furniture parapets etcetra. including five year Routine maintenance Under NABARD RIDF XXXI
SH Providing and laying metalling tarring km 0/0 to 0/640
SH Providing and laying Metalling Tarring km 0/0 to 1/0
C/O RCC H-pipe culvert, P/L soling wearing tarring etc.
P/L metaling tarring works bw km. 3/360 to 3/855)
Metalling and Tarring of road in km. 0/700 to 1/300
Providing and laying Metalling/ Tarring at RD. 0/0 to 0/600)
Metalling and Tarring, C/O road side drain and Parapets) Under SCSP
(SH- Mettaling and Tarring work at RD 0/00 to 1/120)
C/O R/Wall, B/Wall hume pipe culvert metalling and tarring.
C/O hume pipe culvert, metalling and tarring and U shape drain.
Providing and laying soling and metaling Tarring in Km 4 to 5
Providing and laying Metalling Tarring in km 1/00 to 1/500
Providing and laying Metalling Tarring in Km 1/090 to 1/590
Providing and Laying WBM, G-II G-III and Tarring work etc
SH Metalling Tarring works etcetera in km 0 0 to 0 600
Metalling and Tarring in Km 0/0 to 1/600) Under SCSP)
C/o Road metaling and tarring etc. from near piple tree to MATA Bagla Mukhi Mandir Chanwari Kehnwal in G.P. Tilli. (SH- P/L Kharnaja stone soiling, cement concrete, steel work etc. in out side area Under VKV-2024/2069,2025/149 AN 2025/181. (Deposit w
Construction of Link Road from NH-503 to Ghartheru via Baba Tilla up to Bagli km 00 to 5.500portion km 1.300 to 3.500SUB HEAD Formation Cutting C.o Retaining Wall 900 mm Dia Hume pipe culvert CC pavement PCC Drain P.L GSB and Metalling and Tarring fr
C/O Retaining wall etc. at various roads under Manpura section).
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 5/0 ans 0/0 to 0/890 Respectively DRRP No. HP-03-03 VR005 and VR0004 Under PMGSY) with paver finisher
(SH-Providing And Laying 50mm thick penetration macadam in essential reaches and 30mm thick bituminous concrete in km 4/0 to 5/0).under Addl. Annual Maintenance plan (AMP) for the year (2021-22).
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 1/00 to 2/00
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 5/00 to 6/00 , 6/00 to 7/00 and 7/00 to 8/00
Periodic Renewal on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road SH. Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 60.200 to 60.800 MDR-46 during the year 2019-20
Providing and Applying (RS-I) and 30mm thick bituminous concrete at Km 7/495 to 9/495and C/O R/Wall at RD 10/040 to 10/059 and 10/152 to 10/160).
Providing and laying 25mm thick bituminous concrete with paver finisher complete in Km 0/840 to 1/000, 1/000 to 2/000, 2/000 to 3/000 and 3/000 to 3/750
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 20/0 to 21/0 24/0 to 25/0 26/0 to 27/0 and 28/0 to 29/0 ) 4.00 km
Providing and laying 30mm thick bituminous concrete pavement Nagrota to Lakerehri road in Km 1/000 to 2/000 and Kufri Patialkar Khas Thana Chhinwar Rounkhar road in Km 5/000 to 5/300
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 16/00 to 17/00
Improvement of Banali to Pong Dam road Km. 0/0 to 2/165 (SH. Providing and laying 30mm thick bituminous concrete with paver finisher in Km. 1/0 to 2/160 under Industrial Corridor
Periodic maintenance of Chamba Tissa road KM 32/250 to 62/0 for the year 2021-22 Providing and laying bituminous concrete and C/o PCC Drain at RD 59/0 to 62/0
SH Providing and laying WBM G.III, 25mm thick bituminous concrete at various RDs between Km. 39.000 to 40.000, 40.000 to 41.000, 41.000 to 42.000, 56.000 to 57.000, 57.000 to 58.000 and 58.000 to 59.000