Loading…
Loading…
5,458 results • Best match
P/L 30mm thick bituminous concrete in km 1/000 to 2/000,3/000to 4/490 i/c interlocking paver block at km 1/150 to 1/195 and Thermoplastic paint strips)
Periodical maintenance on Balindi Kanda road VR-00130 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 0/0 to 2/00)
Providing and laying G - III, SS - I, and 30 mm Thick Bituminous concrete, in km 72/00 to 73/00 and 73/00 to 74/00) MDR road (Under AMP 2024 - 2025)
P/L 30 mm thick Bituminous Concrete on Palion to Majri Road Km 1/0 to 4/0 and Jabbal Kanoti to Upper Surla Kathana Road Km 0/0 to 5/800
Providing and laying BUSG Bituminous concrete in Km 0-0 to 4-0 Providing and laying Hot applied thermoplastic edge line and construction of PCC Hill side drain in 400 mtr length
Providing and laying BUSG, Bituminous Concrete in Km.4-0 to 7-040, providing and laying Hot applied thermoplastic edge line and construction of PCC Hill side drain in 300 mtr Length
Providing and Laying bituminous concrete 30mm thick in Km 3/00 to 4/00, 2/00 to 4/00 respectively with paver finisher) (DRRP No-HP-03-03 - VR 0056 and 0098)
Providing and laying Built up spray grout , 30 mm bituminous concrete, and Road marking in km 0/0 to 1/0, 1/0 to 2/0 and 5/0 to 6/0.
Providing and laying G - III, SS - I, and 30 mm Thick Bituminous concrete, in km 102/00 to 103/00 and 103/00 to 104/00) MDR road (Under AMP 2024 - 2025)
SH P/L 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat, Tack coat and thermoplastic layer on VR Road. Link road Amroh to Jhaniara km 0/0 to 1/0
Periodic Maintenance on Balindi Kanda road VR-0067 (SH Providing and Laying 30 mm Bituminous concrete including profile correction, Thermoplastic paint and V-Shape drain in Km 2/00 to 4/00)
R/R damages on Bhojanagar Neri Kalan road Km. 0/00 to 9/500.(SH Repair of Pot holes in Bituminous Concrete Km. 0/00 to 9/500)Under PDNA .2nd call
R/R damages on Joharji Mallah road Km. 0/00 to 27/465.(SH Repair to Pothhole in bituminous concrete at various reaches between Km. 3/00 to 8/00) Under PDNA
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Providing and laying Base course G-II, G-III, P/L Metalling Tarring in Km 0/0 to 3/0)
Const of link road from Jawar Mairi road Near Ravi Dass Mandir to Khalmba in GP Jawar km 000 to 0980 SH Formation cutting including Rwalls Hume pipe culvert at RD 0227 and GSB WMM and Tarring between km 000 to 0500 under SCCP
Const of and MT link road Pangloo to Mairi via Mayur Gwalsar Sanoh road including 1 No Bridge portion Gwalsar to Sanoh km 000 to 2000 SH PL GSB WMM and Tarring ic Const of Sub granular between km 0500 to 1500 under MNP
Construction of road from NH to Govt. High School Tanda via Saheed Capt. Vikram Batra College to connect SC Basti road Km 0/00 to 3/500. (SW- Metalling Tarring at various RD 1/290 to 1/900 and 2/045 to 2/220 (SCSP).
Construction of road from Plakh to Charuri and Malhari to Duhag km. 0/0 to 3/555 including bridge over Duhag khad SH Formation cutting, Retaining walls, Cross Drainage Works, GSB, WBM II, WBM III, Tarring, Drain, Parapet and Const. of 43.20 mtr. spa
C/O link road from Badhiana to Chiggar Km 0/0 to 2/500 (SH- Providing and laying complete Metalling/ Tarring in Km 0/0 to 1/0 and V-shape drain in Km 0/0 to 0/390 and 0/500 to 0/805 )
Repair and Restoration of Rain Damages link road Govt High School Gagret to Harijan Basti Kaloh to Gagret Oel Ispur road Km 000 to 2300 SH Relaying due to road crust damage Metaling and Tarring and Drain between Km 0500 to 0850 Under PDNA 2023
A.R and M.O NH-305 Sainj-Luhri-Aut road Km. 0.0 to 53.00 (SH. Providing and laying tarring work in Km. 0.00 to 1.700, construction of U shape drain in Km. 0.160 to 0.480 and construction of slab culvert 2.0 m span at RD 0.300.
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Providing and laying Base course G-II, G-III, P/L Metalling Tarring in Km 3/0 to 6/0)
Construction of Balance work of Kaloha Shantla road Km 0/00 to 16/720 (Section Km 8/0 to 16/720) Stage-II Under Nabard RIDF-XXV (SH. Construction of Retaining wall, Cross Drainage work, Cement concrete pavement, Metalling and Tarring, Road side PCC
C/O Pucca road along canal from village Doiyonwala to Kheri Km. 0/0 to 2/915 under Mukhya Mantri Sadak Yojna. (SH- C/O retaining walls, C/O causeway, providing cross drainage works and Metalling and Tarring in Km. 0/0 to 2/915)
C/O Link road to Village Bathol in Km 0/00 to 1/250 (SH C/O V-Shape drain, C/O essential Parapets, P/L Open Graded Premix Carpet with seal coat in Km 0/00 to 0/315 and 0/360 to 1/240 and P/L Thermoplastic edge line at Rds 0/00 to 1/240)Under SCDP
C/o link road to village bathol km 0/0 to 2/745 (Sh P/L gr 1 11 111 premix carpet and seal coat in km 0/0 to 1/250 hume pipe culvert with wing wall at Rd 1/615 to 1/645, 1/720 to 1/745 and v shape drain in km 0/0 to 1/745 under SCCP
(SH-Providing And Laying 50mm thick penetration macadam in essential reaches and 30mm thick bituminous concrete in km 1/700 to 2/600).under Addl.Annual Maintenance plan (AMP)for the year (2021-22).
P/L 30mm thick bituminous concrete in kms 4/0 to 4/550 and 4/600 to 5/0 including 80mm thick ISI marked paver block in kms 4/550 to 4/600
Annual Maintenance plan for Kheel Ka Mour Subathu road in km 0/0 to 6/00 SH Periodical renewal coat with 30 mm thick Bituminous Concrete at Rd 2/00 to 5/00
SH Providing and laying bituminous concrete 25mm thick in km 0/00 to 5 500 paver finisher Package No HP 03 133) Addl Km Under PMGSY Incentive 2024 25 with five year maintenance
Providing and layin g BUSG, Bituminous Concrete in Km.6/0 to 8/0, providing and laying Hot applied Thermoplastic edge line and const. of PCC Hill side drain in 200 mtr Length
P/L 30mm thick bituminous concrete in kms 3/960 to 5/200 i/c paver block G-III in pol holes and C/O drain at RD 4/250 to 4/350
Annual Maintenance Plan for the year 2023-24 for rural PMGSY Road) Providing and laying 30mm thick bituminous concrete on link road Dangar to Patta via Dakhuit Km.0/00 to 2/000)
Providing and laying 30mm thick bituminous concrete and PCC drain in K.M. 65/0 to 66/0, 66/0 to 67/0, 67/0 to 68/0 and 72/0 to 73/0
Periodical maintenance on Kheel to Pangna road VR- 0075 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 0/00 to 2/00)
Providing and Laying 25mm thick Bituminous Concrete along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 1/00 to 3/00) Under AMP 2025-26.
Periodic maintenance of Chamba Tissa Road Km 32/250 to 62/0. for the year 2021-22 Providing and laying bituminous concrete and const. of PCC drain at 51/0 to 52/0)
Periodical maintenance on Churag to Patti road VR- 007629 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 0/00 to 1/00)
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km2/00 to 3/00 ,3/00 to 4/00 and 4/00 to 5/00
Periodical maintenance on Churag to Patti road VR- 007629 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 1/00 to 2/00)
Providing and Laying bituminous concrete 30mm thick in Km 0/0 to 1/800 and 1/00 to 2/00 respectively with paver finisher) (DRRP No-HP-03-03 - VR 0115 VR 0151 )
P/L 30mm thick bituminous concrete in kms 0/0 to 2/195 I/c paver block, G-III in pot holes and C/O drain at RD 0/400 to 0/500
Providing and laying BUSG for correction layer bituminous concrete in kilometer 3-0 to 5-200 and construction of PCC hill side drain at various reaches at kilometer 3-0 to 5-200
Sarkaghat to Makehar Road 4.0 to 6.0 and Kharoh to Paplog Road Km 0.00 to 1.0 under AMP for the year2025-26 . (Providing and laying 25mm thick bituminous concrete in various (VILLAGE ROADS)
Providing and laying BUSG for correction layer, Bituminous concrete in kilometer 3-0 to 5-0 and construction of PCC hill side drain at various reaches at km 3-0 to 5-0
Providing and Laying bituminous concrete 30mm thick in Km 2/00 to 3/500 and 0/00 to 2/00 respectively with paver finisher) (DRRP No-HP-03-05 -VR 0079 and VR0108 )
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 0/00 to 1/00
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 0/0 to 1/0 1/0 to 2/0 and 2/0 to 3/0)
Periodical maintenance on Churag to Patti road VR- 007629 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 3/00 to 4/00)
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 2/00 to 3/00