Loading…
Loading…
5,458 results • Best match
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 2/00 to 3/00
AR and M/O to Chailla Neripul Yashwantnagar Kumarhatii road in Km. 75/375 to 86/450 (SH P/L GSB, WMM, Surface dressing and Bituminous Concrete at Rds. 82/435 to 82/535)
(SH P/L 30 mm thick Bituminous Concrete Paver Block CC 1 3 6 under Paver Block and CC for Edging 1 4 8 on various road under M.C. Dalhousie ( i.e .5 no roads)
Construction of Baridhar Garudnag Deothal Chontru road km 0/000 to 4/500 (SH- Tarring in km 0/000 to 2/000 ,V-shape drain in km 0/000 to 2/000 and 900mm dia RCC hume pipe culvert at RD 1/250,1/850,) W P
Construction of link road H/Basti bum to Galah , Galahi, Hambot , Hatwar km 0/00 to 2/00 SH Metalling and Tarring work in km 0/00 to 0/026, 0/270 to 0/650, 0/720 to 0/855 and 0/925 to 1/208
Widening and Tarring of Shallaghat Kothi Kolka Chamyawal road Km 0/0 to 11/960 (SH - Formation defiance i/c retaining walls, CD works, GSB, WBM Grade-II and III, MT works interlocking paver block pcc parapets, V shape drain Singh board in Km stone i
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Providing and laying Base course G-II, G-III, P/L Metalling and Tarring in Km 0/0 to 3/0)
Construction of Helipad at Sanghnai Tehsil Ghanari Distt Una SH Const of approach road for Helipad by providing and laying GSB WMM and Tarring in km 000 to 0700 and Retaining wall at RD 0500 to 0650, protection wall including drain from RD 00 to 026
C/O link road from Loharli to Harizan Basti Mohalla Dharamshala in Gram Panchayat Loharli Km. 0/0 to 2/100 (SH. Construction of 2.75/5.00 mtr wide Jeepable road Cutting/Filling, GSB, WMM, Metalling and Tarring in Km. 0/300 to 1/000 and Retaining wal
Construction of Link road Pirsaluhi (Kangra) to Kitpal (Hamirpur) km 0/000 to 5/740 in District Kangra (HP)(SH Formation cutting, passing places,C/o R/walls, CD works, P/L GSB,WMM,tarring work,side drain and parapets, , road sign board, C/o 102.511 m
Restoration of rain damages on Jia Manikaran Road Km. 1/610 to 35/110 (SH- Balance work of Metalling and Tarring , V-shaped drain,U-shape drain at Various reaches in Km 1/610 to 35/110 under CRF (Job No CRF-HP-2023 -24/188)
Providing metalling and tarring of road from Bayal (Batching plant near steel bridge) to Village Koyal in project affected area of Rampur HPS Km. 0/00 to 8/700. (SH- M/T works, side drain, Parapets and protections walls at various Rds. in Km. 5/060
Construction of link road from Bhella to Klatha km 0/00 to 3/400 ( SH- Removal of Formation Deficiency, C/o Retaining structure, P/L cross drainage works, Metalling Tarring, Side drainC/o essential parapets and P/L Road signage etc. in km 0/0to3/400
P/L G-II and Tarring in Km 0/400 to 1/300
Providing and laying metaling and tarring in Km.10/000 to 11/000
SH Providing and laying Metalling and Tarring km 0/0 to 0/615
Providing and Laying Tarring work, and V-Shape drain at printing Press complex
Maintenance of WBM, P/L Tarring in K.M. 1/00 to 1/930
P/L metalling and tarring in Km. 0/580 to 0/685) MMGSY
SH Providing and laying Tarring work in Km 0/0 to 0/850
Providing and laying Metalling Tarring of helipad Thermoplastic and construction of earthen shoulder
SH- Providing and laying Metalling Tarring in Km 1/00 to 1/900
SH Providing and laying metalling tarring in km 0/0 to 1/400
P/L GSB,WMM and Metalling tarring Km.2/500 to 4/0
P/L Gr-II and Tarring in km 0/300 to 1/035
(SH- Providing and laying tarring in Km. 0/200 to 1/420) SCSP
P/L G.S.B., W.M.M. AND TARRING IN KM. 0/0 TO 0/500)
SH- Providing and laying metalling tarring in Km 0-0 to 7-00
P/L GSB G-II, G-III and Tarring work at Various Reaches)
Metalling and Tarring on approaches of kalthari Khad bridge and Sikandra Nallah Bridge
Left out work of retaining walls, metalling and tarring on Sandole side appoach
P/L Soling, wearing and tarring in Km 0/00 to 1/00
Providing and Laying Tarring in between road Km. 0/0 to 1/500.
SH Construction of Footpath, drain and metalling tarring on open space Right Side
(SH- P/L soling, wearing and tarring in 0.500Km. Length at deferent RDs)
Construction of Passing places, Side drain, Parapets, Cement concrete pavement and tarring work
P/L Tarring in km. 2/0 to 3/0) Under SCSP Head
P/L wet mix Macadam Tarring in km. 1/0 to 1/850)
Providing and laying Metalling and Tarring in Km. 0/0 to 1/500
Providing and laying metalling and Tarring at RD 1/205 to 1/955
P/L soling AND Metalling tarring in km 0/0 to 0/800
Construction of Passing places, Side drain, Parapets, Cement concrete pavement and tarring work
Providing and Laying Tarring in Km. 0/0 to 1/0) (Under SCSP).
SH Metalling/Tarring km 2/600 to 3/100 and cement concrete pavement
P/L soling and metalling tarring in km 5/970 to 6/300)
Providing and Laying, Metalling and Tarring in K.M. 0/00 to 0/335
SH P L G-2,G3 and Tarring between km ./0 to 0.500)
Providing and laying metalling and tarring in Km 26/0 to 26/945
including thermoplastic paint egde line Vshape drain at essential RDs under PMGSY for the year 2022 23