Loading…
Loading…
2,143 results • Best match
Optical Fibre Splicing Machine (V2) as per TEC 88090:2012 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6475405 Dated : 24-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Electric Motorized Treadmill (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6812587 Dated : 22-10-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6592524 Dated : 25-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Layer 2 Access Switch (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Plotter Paper Roll (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6472199 Dated : 21-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
Plotter Printers (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Cat - 6 UTP Ethernet Cable for Wifi Indoor use (MTNL) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6290492 Dated : 19-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
SPECIAL REPAIR TO BUILDING, CONSTRUCTION OF OPEN PLINTH, PROVN OF SIGN BORD AND CERTAIN REV AND MINOR WORKS UNDER AGE BR-V AND AGE EM-V OFFICE OF GE NORTH BATHINDA
Estimate for Construction of Pump House building for providing Lift Irrigation Facilities to the area of villages Rampur Jhajjar etc in Changer area of Shri Anandpur Sahib
Renovation of M.C Office Building at Killianwali M.C Killianwali Distt. Sri Mukatsar Sahib
Repair, Maintenance & Operation of 125 KVA DG Set installed at GST Bhawan Building, Rishi Nagar, Ludhiana. SH: Replacement of Old ceiling fans with energy efficient BLDC Celing Fans and Exhaust Fans Subwork/Packages: Electrical Work
Construction of Public Toilets Normal at 1. Court Road, 2. Ram Bagh, 3. Street Vendor Zone, Near Shanti Bhawan, Purani Sabji Mandi, 4. Near Kamnoj Cinema at Jhugi Basti, 5. New Sabji Mandi.
Construction of Entry Pavilion Front Boundary Wall Satsang Hall and Covered Corridor connecting Main Mandir Bhawan alongwith Renovation and Repair of Areas Surrounding Rajrajeshwari Mandir at Shri Kali Mata Mandir Patiala Phase II
Hiring of various types of Labour and Supply of Material of electrical services for various sites under the jurisdiction of ADA Amritsar and PUDA Bhawan at SGRD Urban Estate, Amritsar. (FY-2026-27)
RETROFITTING OF VIKAS BHAWAN (CONSISTING OFFICE OF CDPO, AGRICULTURE OFFICER, SOIL CONSERVATION OFFICER, HORTICULTURE OFFICER, FOOD and CIVIL SUPPLY, EMPLOYMENT OFFICER, PUNSUP OFFICE AND LABOUR OFICER ) FOR PERSONS WITH DISABILITY AT PHAGWARA, DISTT
S/R for Vit-Te-Yojna Bhawan for providing New Furniture items for repairing the damages caused due to fire in the building in Plot No. 2, Sector 33-A, Chandigarh (1st floor)
OPERATION OF FIRE FIGHTING SYSTEM INSTALLED IN THE BUILDING OF VIT-TE-YOJNA BHAWAN, PLOT NO. 2B, SECTOR 33-A, CHANDIGARH FOR THE PERIOD OF 01 YEAR FROM DATE OF ALLOTMENT (LABOUR ONLY)
Construction of Building of DPO Khanna, District Ludhiana.
Construction of the Infrastructure facilities and other related works/buildings i.e. Academic building, residential buildings, student facilities, campus development etc. in campus of Central University of Punjab at Village Ghudda, Distt. Bathinda (Pb.) on EPC Basis
SUPPLY INSTALATION TESTING AND COMISSIONING OF 10 HP VRV SYSTEM WITH 2 YEAR DEFECT LIABILITY PERIOD AND FIVE COMPERHENSIVE MAINTAINANCE AFTER DEFECT LIABILITY PERIOD OF 2 YEARS IN VIT BHAVAN, SECTOR 33, CHD, AND OTHER ALL OTHER EFFECTS CONTINENT THER
Improvement of various intersection, T points and Mid Section by fixing road safety furniture, speed calming and central median of Lion Bhawan club, Bhai Bala road, DMC cut and Arora palace/Dana Mandi Chowk.
Construction of street with storm water pipe and interlocking tiles house of Mangal Singh, House of Bhadur , House of Satwinder Singh, House of Jagan Nath, House of Nagge Singh ward no 19 , Nirnkari Bhawan
CONSTRUCTION OF UGSR (100000 LTR FOR FIRE FIGHTING AND 50000 LTR FOR MULTIPURPOSE) WITH PUMP CHAMBER AND RAIN WATER HARVESTING SYSTEM IN YUVA BHAWAN IN SECTOR 42 CHANDIGARH AND ALL OTHER WORKS CONTINGENT THERETO.
REPLACEMENT, INSTALLATION, TESTING AND COMMISSIONING OF DAMAGED/ BURNT OUT INDOOR UNITS ALONG WITH ASSOCIATED LOW SIDE WORKS AT VIT-TE- YOJNA BHAWAN, PLOT NO. 2, SECTOR-33, CHANDIGARH AND ALL THER WORKS CONTINGENT THERETO.
PROVIDING AND INSTALLING FIRE SAFETY SIGNS, RRL HOSE PIPE, CAST IRON VALVES, SLUICE VALVES, MS PIPE AND OTHER ACCESSORIES AT BLOCK-A AND B, PUNJAB BHAWAN, NEW DELHI AND ALL OTHER WORKS CONTINGENT THERETO.
ANNUAL MAINTENANCE FOR VRV AIR CONDITIONING SYSTEM IN THE BUILDING OF VIT TE YOJNA BHAWAN, SECTOR-33A, CHANDIGARH FOR THE PERIOD OF 01.10.2020 to 30.09.2021 I.E. FOR ONE YEAR FROM THE DATE OF START.
C/o Office Cum Residential Accommodation (T-II, T-III & T-V Qtrs) of Officers and Staff of Defence Estates Office Circle Pathankot including development . SH:- T-II /10 Nos. Qtrs, T-III/4 Nos. Qtrs., T-V/1 No. Qtr & Office Building i/c development & internal electrical installations work.
CONSTRUCTION OF PRE ENGINEERING BUILDING FOR BORDER GUARDING FORCES, CUSTOM, IMMIGRATION and LPAI STAFF AT PTB COMPLEX, DERA BABA NANAK, KARTARPUR SAHIB CORRIDOR, PUNJAB ON DESIGN and BUILD BASIS
Providing and Laying of Sewerage Lines for Replacement of Existing Sewer and Construction of House Connections and all other works contingent thereto in Guru Arjun Dev Colony and Back Side of Geeta Bhawan at Rajpura
PROVIDING AND LAYIG 250 MM I/D SEWER LINE FROM 899 TO 901 CORNER AND 901 CORNER TO BAL BHAWAN ALONG WITH CONSTRUCTION OF MANHOLES AT PHASE-4, SAS NAGAR AND OTHER WORKS CONTINGENT THERETO
ANNUAL COMPREHENSIVE MAINTENANCE AND OPERATION OF DIGITAL SCROLL, VARIABLE REFRIGERANT FLOW (VRF) TYPE HVAC AIR CONDITIONING SYSTEMOF 218 HP FOR THE YEAR 2021-22 (FROM 01.04.2021 TO 31.03.2022) AT PUNJAB BHAWAN BLOCK-B, NEW DELHI.
as per title
Estimate for providing Repair Maintenance and Renovation of office building Kandi Area Dam Circle Hoshiarpur.
R and R work of Division office building situated at 220KV S/S, BBMB, Dhulkote
construction of auditorium work at 5th floor c wing Hospital Building in premises of HBCHRC Mullanpur New Chandigarh Dist Mohali Punjab 140901
Annual maintenance and Mechanized cleaning of PUDA Bhawan Civil PH and electrical works including the cost of consumables housekeeping material tool and plants required machinery etc and Operation and maintenance of pumping machinery and other relate
Annual Comprehensive Maintenance and Operation of Digital Scroll, Variable Refrigerant Flow (VRF) type HVAC Air conditioning system of 218 HP for The year 2020-21 (From 01.04.2020 to 31.03.2021) at Punjab Bhawan Block-B, New Delhi
ANNUAL MAINTENANCE OF OPERATION OF FIRE FIGHTING SYSTEM INSTALLED IN THE BUILDING OF VIT-TE-YOJNA BHAWAN, PLOT NO. 2B, SECTOR 33-A, CHANDIGARH FOR ONE YEAR FROM THE DATE OF ALLOTMENT (2026-27). Labour Component
Custom Bid for Services - Supply, Installation and Configuration of comprehensive Server based Antivirus (Endpoint) Software and regular management/updation on 1600 (One Thousand Six Hundred) networked Computers installed in RCF/Kapurthala and RCF TK.. Similar Category Customized AMC/CMC for Pre-owned Products Facility Management Service - Manpower Based Software Support Services 2.0
High End Desktop Computer (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6316042 Dated : 18-06-2025 Bid Document 1/11 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Financial Document Required Yes Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 42 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/RCF/KXH Rail Coach Factory Kapurthala (Pfa) Splitting
Layer 2 Access Switch (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6669517 Dated : 16-09-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
CAT 6 Information outlet (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6286237 Dated : 17-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Desktop Computer
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Dehumidifier (Q2) MSE Exemption for Years of Experience and Turnover
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6477133 Dated : 21-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
All in One PC (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7083778 Dated : 08-01-2026 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Financial Document Required Yes Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 42 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/RCF/KXH Kapurthala, Indian Railways, Rail Coach Factory Kapurthala, Ministry of Railways (Pfa) 2/13
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7051603 Dated : 29-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Interactive Panels with CPU (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6838200 Dated : 03-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No