Electrical Sleeves-IS:11654, IS:5831 (Q4), PVC Copper cable 1 core and multi core Circular Sheathed cable with Rigid Conductor as per IS:694 (Q3), Paint brushes (Q3), Enamel, Exterior, (A)Undercoating, (B) Finishing-IS:2933 (Q3), hand held search ... PVC Copper Cable , ... Flexible conductor as ... Aluminium conductor with ... PVC Copper Cable (Heavy ... PVC Copper cable single ... flexible Conductor as ...
Supplying drawing testing and commissioning 0.85 km 11 KV AB Cable XLPE insulated of size 120 sqmm along existing poles from Thannimoodu junction to Mlanthadom junction at Electrical Section Vakayar under turnkey basis
Supply and Stringing 11kV Covered Conductor_as per EN 50397_1_2020_under Electrical Section Chempu
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE DESIGN, MANUFACTURING AND SUPPLY OF MATERIALS, ERECTION, TESTING AND COMMISSIONING OF THE WORK RE CONDUCTORING OF 22.15 KM 11KV OH LINE TO COVERED CONDUCTOR AT KASARAGOD CIRCLE UNDER RDSS ON TURNKEY BASIS
PROVIDING DEDICATIED FEEDER FOR KWA MEVALLOOR PLANT BY STRINGING OF 150M 11KV COVERED CONDUCTOR OVER RIVER AND LAYING OF 800M 11KV UG CABLE UNDER ELECTRICAL SECTION PERUVA (LINE EXTENSION-OYEC IN FAVOUR OF EXECUTIVE ENGINEER ( 2146862500167 ))
Supply of 11kV AB Cable with accessories and Constructing 24.22kM of HT OH line with ABC on existing PSC pole or A pole supports on TURNKEY basis at different locations under Electrical Division Ponnani
Supply of 11kV AB Cable with accessories and Constructing 16.4 kM of HT OH line with ABC on existing PSC pole or A pole supports on TURNKEY basis at different locations under ED Tirurangadi
Development of Distribution Infrastructure at KOLLAM Dt of Kerala under the Revamped Reforms based and Results linked Distribution Sector Scheme Reconductoring 39.60 Km11 KV OH Line with Covered Conductor under Ele. Div Punalur under Ele circle ktra
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6466632 Dated : 18-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6417259 Dated : 04-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6427094 Dated : 08-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6433709 Dated : 09-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6432815 Dated : 09-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 ... category XLPE Cable for ...
Reconductoring work using covered conductor on 33kV Pallivasal Marayoor feeder including supply of Covered conductor and accessories under Electrical Section Marayoor
Malappuram Package No.6 - Supply and Construction of 11 kV Lines using Covered conductor Raccoon for the Development of Distribution Infrastructure on a Turnkey Basis under the Dyuthi Special Scheme at Various Locations under the EC,Manjeri(Retender)
Construction of Academic staff College for Kerala University of Health sciense (Kuhs),T richur including internal water supply,sanitary Installations,Drainage Internal Roads & paths ,strom water drain,Under ground sump ,septic tank ,internal ... ,ligthning conductors ,cubicle ...
Supply of 11kV AB Cable with accessories and constructing HT Feeder 4.7km with ABC of size 3x120sqmm,1x95sqmm,insulated messenger wire on existing PSC or A pole supports on TURNKEY basis under Electrical Section, Adimali.
Supply of 11kV AB Cable with accessories and Constructing 2.7 km of HT overhead line with ABC on existing PSC pole/A pole supports on TURNKEY basis under Electrical Section, Alathiyur in Electrical Division, Tirur.
Meter Board, TPN SDF, LED Lamps, ELCB, Fuse unit, Neutral link, Power cable, Cable termination, Pipe earthing, G I Wire, G I Pipe
PVCconduit,wiring,TVcable,Earthing,Aluminium power cable,MCB DB, MCCB,PVC Cable management system, heavy duty exhaust fan, fittings,sine wave inverter etc.
construction cable trench and cover slab and connected earth mat work.
Design Supplying Laying Termination Testing and Commissioning of 10.5km 110kV 3 Nos Single Core 630 sq mm Al Conductor XLPE UG Cable and Single run Single Mode 24 fibre OFC from 110kV GIS Substation Kollam to Kottiyam Substation
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6082107 Dated : 24-03-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5981642 Dated : 21-02-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6082706 Dated : 24-03-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6125625 Dated : 09-04-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5965263 Dated : 18-02-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5931701 Dated : 10-02-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6577234 Dated : 16-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6981659 Dated : 10-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6582668 Dated : 19-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reconductoring with LT ABC and using rabbit conductor
Supply and stringing of 5.2 kM 33kV covered conductor equalent to ACSR DOG in already erected 14mtr A poles and lattice towers in connection with bay addition and interlinking of 33kV kallettumkara and Prappukara Substations for N-1 stanard
Reconductoring of 1800m 11Kv line using ACSR 99 Sq mm covered conductor under ES Kottayam (East) and Kuruppanthara_ Construction of new 11kv OH line under ED Pallom and Vaikom Under Kottayam Circle Under Kottayam District Of Kerala Under RDSS.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5765814 Dated : 31-12-2024 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 206500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Raising the height and strengthening of existing towers Loc 1 to 10 and inserting one number D30 tower with 4 point 5 M extension between loc 2 and 3 and reconductoring with ACSR DOG conductor of 66KV Carborandum tap feeder
Supply of 11kV AB Cable with accessories and Constructing 11.68 kM of HT overhead line with ABC with insulated messenger wire on existing PSC pole A pole supports on TURNKEY basis at different locations of ED Tirur
C-DAC CUTE Traffic Controller, Traffic Controller Cabinet, 300mm RED LED aspect 24 V DC with inbuilt voltage current regulator 400 mA Max. including dust and water proof Polycarbonate housing and clamps, 300mm AMBER LED aspect 24V DC with inbuilt ... 1.5sqmm PVC insulated Armoured ... Armoured copper cable for ... data, Control cable 6 ... 0.5sqmm PVC insulated Un ... armoured copper cable from ... 2.5sqmm PVC insulated Armoured ... Armoured copper cable for ...
Providing bypass arrangement for 110kV SC line using Covered Conductor of size 100sqmm in 4 reaches of approximately 3km each for restoration of 110kV supply in tandem with the work of up gradation of 12km 110kV Mylatty to Vidyanagar SC line
Design, Manufacture, Supply, Laying, Testing and Commissioning of 2.3 km, 110 kV, 4 runs single core 300 sqmm Al. conductor, Lead sheathed XLPE UG cable with 24 fibre OFC and accessories from 110 kV SS, Melattur to proposed Traction SS, Melattur
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) ... (Q3), PVC Insulated Copper Cable Single ... Flexible Conductor (V2) ...
JB for Wind Sensor, Power cable (2 core 1.5 Sq mm) overall shield, Two pair STP Data cable (2 X 2 X 0.75) overall shield
REMOTE OPERATED WATER MONITOR, FRLS INSULATED COPPER CONDUCTOR WIRES
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7005184 Dated : 15-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Copper plate, Copper strip, Copper Rod lighning arrestor, Insulated copper wire, Ring fit Push Fit GI Perforated Pipe, Heavy duty PVC pipe, Extension Board with indiviudal switch, Ladder, Copper clad rod, 3 Core Electrical cable, Steel guide wire, ... Braided copper wire , ...
Supply of 11kV AB Cable with accessories and constructing HT Feeder-1.7 km with ABC of size 3x120sqmm, 1x95sqmm insulated messenger wire on existing PSC or A pole supports on TURNKEY basis at different locations under Ele. Division Thodupuzha
RDSS - Loss Reduction Transmission works under THRISSUR District - Reconductoring and Standardization of 33 kV line using Covered Conductor and ACSR DOG conductor on Turn key contract
Reconductoring 3.85 km Three phase bare conductor with LT ABC
Extension of 11kV OH line for providing power supply to M/s. Rosewood Industries LLP, Santhinagar under Electrical Section Omassery, Kozhikode District