Loading…
Loading…
1,696 results • Best match
Supply of 11kV AB Cable with accessories and constructing HT Feeder 7 km with ABC of size 3x120sqmm,1x95sqmm-insulated messenger wire on existing PSC or A pole supports FROM GAVI TO PACHAKKANAM on TURNKEY basis under Electrical Section, Vandiperiyar
Shifting of 13.7km 33kV line, 720mtr 11kV line and 5.48km 3phase/1phase line with all materials excluding the supply of poles and conductors under Electrical section, PEERMADE
External works Compound wall Paver block Pathway Sump tank Septic tank Rain water harvesting Shed for Generator Bore well Landscaping Solid Waste Treatment LT Cable laying External lighting Water Pumps DG Electrification etc
External works Compound wall, Paver block Pathway, Sump tank, Septic tank, Rain water harvesting, Shed for Generator, Bore well, Landscaping, Solid Waste Treatment LT Cable laying, External lighting Water Pumps DG Electrification etc
Nylon Polymer Sling 1 meter-5 Ton capacity, Nylon Polymer Sling 1.5 meter-5 Ton capacity, Nylon Polymer Sling 2.0 meter-5 Ton capacity, Nylon Polymer Sling 3.0 meter-5 Ton capacity, Nylon Polymer Sling 1.0 meter-8 Ton capacity, Nylon Polymer Sling ... of conductors used ... Moose Conductor , ... of conductors used ... Lapwig Conductor , ...
Reconductoring with LT ABC and rabbit conductor under Kokkad Exchange Transformer
Indoor Court finishing, Demolition - Security Cabin, New change room, RCC Kerb, Entrance Gate, Compound wall, Chainlink Fencing, single arm, Wiring, MCCB, MCB, DBS, Earthing, LT Cable, Laying, Termination, Light Fixtures,Poles, Lift Electric, Lift
External works for Compound wall Paver block Pathway Sump and Septic tank Rain water harvesting Shed for Generator Tube well Landscaping Solid Waste Treatment LT Cable laying External lighting Water Pumps DG Electrification etc
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6410278 Dated : 03-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 17375 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GM FIN Name of A/c Holder: Fertilisers And Chemicals Travancore Ltd. Account Type : Cash Credit Account No : 57017844467 IFS CODE : SBIN0070158 Name of Bank : State Bank of India Branch : Udyogamandal District : Ernakulam State : Kerala. (Fact) 2/8 Splitting
Supply of 11kV ABC with accessories and Constructing 4.4 km of HT overhead line with ABC of size 3 x 120 sq mm and 1 x 95 sq mm (insulated messenger wire) on existing PSC pole or A pole supports on TURNKEY basis at different locations under ED TSR(W
1. Construction of 11 KV ABC - 4 KM 2. Insertion of HT PSC Pole-45 nos. 3. Fitting and erecting HT DP Using PSC Pole-4 Nos. 4. Installation of AB Switches- 2 Nos
Purchase of DLP projector with remote control and ceiling mount kit,10meter HDMI cable with termination box and face plate,15meter Power cable,3meter male to male HDMI cable.
KSEBL-Constructing 1.6 km 11kV line from Ezukumon-Mookenpetty using Covered Conductor
SPL REPAIR FOR CONVERSION OF LT OH LINES TO LT UG CABLES AT 260 FD WKSP AREA, PROVN OF 30 CEILING FANS AT VARIOUS DEPT AT MH AND PROVN OF LIGHTENING CONDUCTOR FOR BLDG NO P-223 USED AS LPG GODOWN AT PMS UNDER GE (ARMY) TRIVANDRUM
Supply of 11kV AB Cable with accessories and Constructing 11Km of HT OH line with ABC of size 3 x 150 sq.mm plus 1 x 120sq mm (insulated messenger wire) on existing PSC pole / A pole supports on TURNKEY basis from Kattoor Substation to Perinjanam
Copper to fiber conversion
NVR 64 Channel, 32 Channel NVR 5MP, IP Bullet Camera 5MP CP PLUS with Weather proof Cover, PTZ Camera 5MP 300 Mtr IR Range, POE Gigabyte Switch 16 Port, 10TB Hard Disk, RJ45 connector, Syntex Box with PDU, Camera Housing, Camera Pole, Server Rack, ... 2Core Power Cable , ... core power cable , ... 2Core Power Cable , ...
This involves dismantling old yard equipment, installing new 12.5MVA110/11kV TFR and bay equipment,laying 11kV UG cable and control cable providing interconnection between equipment, providing equipment and structure earthing etc at 220kV SS Brahmapm
Amplifier, speaker, projector, bass cabiet, hdmi cable 15m, power cable 15m, projector ceiling mount, projector screen, dual desk, steel almirah, executive chairs, podium desk, Installation sound system BOQ Title ITEM BOQ
Copper to fiber network conversion
TENDER FOR AVAILING HT SUPPLY FROM 66 kV SUBSTATION AT CYBER PARK BY LAYING 3x300 SQ.MM HT CABLE, ERECTING RMU WITH METERING PANEL WITH METER, RECONNECTING THE EXISTING CABLE TO THE NEWLY ERECTED RMU AND COMMISSIONING THE SAME AT CYBERPARK, KOZHIKODE
AS PER BOQ AND TENDER DOCUMENTS
Construction of Additional block for Boys Hostel for IIIT Pala, Kottayam under Phase II including internal water supply, sanitary installation, drainage, development work and internal electrical installations, external service connection, internal ... Lighting conductors , ...
Construction of 11.18km 110kV DC line as LILO arrangement of 110kV Ambalathara- Mylatty feeder from Periyattadukkam to proposed Kuttikol substation in Kasaragod district using 110kV DC/MC towers and AL-59 conductors.
Reconductoring of Alappuzha - Pathirapally 66 kV SC Feeder with Wolf conductor under LMS Cherthala
PVC Flat Cable, Aluminium conductor with PVC Insulation and sheath as per IS: 694
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
Ceiling fan capacitor, Ceiling fan regulator open type, 20 Watt LED bulb, Wall fan MPP square type Capacitor, Copper wire 1 Sqmm, Copper wire 1.5 Sqmm, Copper wire 4 Sqmm, Copper wire 6 Sqmm, Street light timer Analog 240 Watt, MCB Double Pole 32 ... Core copper wire , ...
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
PVC Flat Cable, Copper Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
11 KV GRADE, 3 CORE, 300sq mm, stranded Aluminium conductor, XLPE cables - 500 MTR (Q3)
C/o Administrative Building for CRCK, NIEPMD including internal sanitary Installations, Water supply, Drainage, Internal roads, storm water drain, 2 Nos Septic tank, 2 Nos UG sump, Compound wall, Gate and Security cabin, Internal Electrical ... Lightning conductors , ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7035728 Dated : 19-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 17375 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GM FIN Name of A/c Holder: Fertilisers And Chemicals Travancore Ltd. Account Type : Cash Credit Account No : 57017844467 IFS CODE : SBIN0070158 Name of Bank : State Bank of India Branch : Udyogamandal District : Ernakulam State : Kerala. (Fact) 2/8
DISMANTLING OF EXISTING PANELS, SUPPLY INSTALLATION TESTING AND COMMISSIONING OF SUB PANELS, RE ROUTING THE EXISTING POWER CABLE FROM MSB PANEL TO CHILLER 2, RE TERMINATION OF EXISTING LT & INCOMER OUTGOING CABLES EARTH CONNECTIONS ETC
Shifting of HT and LT line Transformers DP structures Excavation of pits for poles and stays fitting and erecting of poles stringing ACSR conductors HT and LTmFitting of AB switches providing stays DPs and earthing
Drawing 1.5 km 66kV covered conductor from Sasthamcotta substation to Loc.7 of 1 STKP feeder
Fitting and erecting of HT A type pole 67 Nos Stringing 11kV covered conductor 3.9 km
Reconductoring of 41.85 KMs of 11KV OH line using HT Covered Conductor AAAC 99 Sq Mm
LT ABC Stringing,Erecting pole,Dismantling existing ACSR rabbit conductor under eyyakuzhy and kuruvikkad Transformer area.
Drawing 11kV Covered Conductor(0.75km) from Bheem Nagar TRFR towards west upto Muppattichira under ES Oachira
Stringing of HT Line with Covered conductor 850mts Fitting and erecting one 100kVA Transformer 1 No
Drawing dedicated 11kV feeder using Covered conductor from Kuruvilangad Substation to Avarma under Electrical Section, Peruva
AS PER BOQ AND TENDER DOCUMENTS
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3) ( ( 3 3 ))
HT rerouting of 11kV Kallepully feeder from Amritha School to Kizhakkethara with HT 99sqmm AAAC covered conductor