Loading…
Loading…
897 results • Best match
Construction of RCC Slab Culvert on Simaluguri Muslim Suba on Kajiamati to ranipukhuri Road Construction of RCC Slab Culvert on Puroni Goirabari to Dangdupur Road Construction of 4.00 m RCC Slab Culvert on Muamari to Karkabari road under Mukhya
Construction of CC Block road from Pachim Nepalpara to Pub Nepalpara LP School with 2 Nos. of HPC and 1 Nos. of slab culvert under CMs Goodwill Mission Project under RIDF-XXXI of NABARD for the year 2025-26.
MMUPPNA_RIDF_XXX_24_25_02 Upgradation of (i) Road from Rangirkhari Netaji Statue point to SMCH Point, Silchar including box culvert and RCC covered Drain, (ii) NH-37 Road from Tarapur Over bridge (E D Colony) to ISBT, Ramnagar, Silchar under Mukhya
PROVN OF DRAINAGE LANE NEAR BLDG NO P 75 P77 P81 P82 HARDSTANDING INTERLOCKING TILES NEAR BLDG NO P01 BOX CULVERT FOOTPATH WITH CHEQURRED TILES AND SPL REP TO BLDG NO T60 BCD AND P89 UNDER GE NARANGI
Construction of Box Culvert of Size ,2.00x2.00m, L-12.00m by 3.00x3.00m, L-20.00m, near India club point on Nh-53 ,Slichar Badarpur Section, at Silchar Town under CIDf at Silchar Town under CIDF for the year 2018-19
MMPPNA_RIDF_XXXI_25_26_486 Improvement of Road from (1) Bhereki Kachamari PMGSY Road to Borlung High School with RCC Box Culvert (2) Khanamukh Namsai to Phulbari H. S. School Road via Gumpha temple under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA
Improvement of Road from Anandapur to Jiadanga Road in State Govt. Good Will project under SOPD-G for the year 2020-21 (Providing E/W in widening, GSB, WBM-III, ICBP including RCC Box Culvert- 1No), Gossaigaon LAC
SUPPLY AND STACKING OF PRECAST CONCRETE DRAIN AND PRECAST CONCRETE BOX CULVERT BETWEEN KM 183.00 TO KM 222.00 ON BALIPARA-CHARDUAR-TAWANG ROAD IN SECTOR OF 90 RCC UNDER 42 BRTF (P) VARTAK IN STATE OF ARUNACHAL PRADESH
SUPPLY AND STACKING OF PRECAST CONCRETE DRAIN AND PRECAST CONCRETE BOX CULVERT BETWEEN KM 0.00 TO KM 6.500 ON SHAKTI-BTK-KUMROTSAR ROAD IN SECTOR OF 127 RCC UNDER 42 BRTF (P) VARTAK IN STATE OF ARUNACHAL PRADESH
LIFTING PRECAST SLABS OF CULVERTS, AREA CLEANING BENEATH PIPELINES, PAINTING OF PIPELINES PASSING UNDER CULVERTS AND REPLACING PRECAST SLABS ON CULVERTS INSIDE GUWAHATI REFINERY.
MMPNA/2023-24/106_Periodic Renewal of Jotte Balijan Road from Ch. 5.00Km. To 6.17 and 9.40km to 13.23 km ( including 4by4m 3 cell box culvert) under MUKHYA MANTRI PATH NABIKARAN AACHANI for the year 2023-24 under Gohpur LAC
MMPPNA_23_24_317 (i) Construction of Road from Kumbha PWD Road to Hmarpunjee (Ch. 0.00m to Ch. 420.00m), (ii) Construction of Box Culvert No. 2/1 (15.005.00m) at Ch. 1817.00m and approaches on road from Kumbha PWD Road to Lailongcherra Khasiapunjee
STBR/SOPD-G/Raha -08/26 Construction of (i) Raha Chaki to Khaigarh (Including Girls HS Approach Road), (ii) Madhapara Ghilani PWD Road to Garangati RCC Bridge, (iii) RCC Slab culvert No. 1/1 and approaches on Kuwariati to Dhemajigaon Road (iv) Road
Construction of 1) Road from Rangia Goreswar Road to Khairabari Road via Lakhi Mandir including cross-drainage works (L_0.440 Km), 2) Road from Mazusuba Chowk to Rati Mahantas House (L_0.500 Km), 3) 2.50 m span slab culvert No. 4/1 with approaches an
MMPPNA_23_24_105, Construction of Jamuguri Gerubari road Sonali Chowk to Phuhurabari from Ch 0.00 m to 1000.00 m, 2.Construction of Bogoribari to Anthaibari Road from Ch 0.00 m to 1580.00 m, 3.Construction of Slab Culvert at West Adarsha gaon to N
RIDF-XXVII/Hojai/02 Improvement/Construction of Roads (i) Lanka Railway Station to Forest Bazar via Lanka Bheta G.P. and Padumpukhuri G.P. and Bordolong G.P. of 91 Hojai LAC (ii) Padumpukhuri GP to Ali Singa Road with minor bridge/ Slab Culvert 6/1
MMPNA/2023-24/160_Periodic Renewal to Namkatoni road Thana Tiniali to Na-Satra, proposed length 1.10 km Bursensua to pomua missing gaon road Pohardia to BurasensuaConstruction of 3.00m X 3.00m RCC single cell box culvert, L0.80 KM , Bongaon to Phul
Construction of CC Cover Drain with RCC slab and Box Culvert for feeder road from Ch-102.552 to Ch-105.602 km of NH-15 under SOPD for the year 2019-20 under Rangia NH Division in the state of Assam
SOPD_G_20_21_228 Construction of road by ICBP (1) Dhupabar Satra road, (2) 3rd Km Borangabari Kalyani Mandir road to Napamua (including 3 cell Box Culvert), (3) Jalukbari Itapara road, (4) NH-15 to Rangalial SC village Road, (5) Kanaklata Path to Dor
CRD/ 2023-24/1 Construction of patrolling path with earth filling and sand gravelling along with a number of box culvert from Laopani river to Bhur river Part-I under Runikhata Range of Chirang Forest Division in Chirang District, BTR, Assam.
SOPD_G_19_20_57_G Construction of Road from RCC Box Culvert No. 1/1 over Hajokhorong Jan on Seuj Path to Mission compound approach road under PWD Golaghat and Khumtai Territorial Road Division, under SOPD-G for the year 2019-20, Golaghat LAC.
CRD/ 2023-24/2 Construction of patrolling path with earth filling and sand gravelling along with a number of box culvert from Laopani river to Bhur river Part-II under Runikhata Range of Chirang Forest Division in Chirang District, BTR, Assam.
Construction of black topping and metalling of road from Khutabagra-I to Khutabagra-II under CMs Goodwill Mission Project under RIDF-XXXI for 2025-26 Providing ICBP from Ch.0.00m to Ch.1020.00m including of RCC Box Culvert. TN_67KOK_RIDF-XXXI-16
Construction of road from Jainari to Gagraguri Village by providing SDBC including 4 four nos. of RCC Box Culvert from Ch. 0.00Km to Ch. 1.78km Length 1.78km under CMs Goodwill Project in BTC area for the year 2023-24. TN_26_26
SOPD_SIG_20_21_35 Widening of road from Amlaputty to Addl. Chief Engineer office by construction of Box culvert, RCC Drain, and retaining wall etc, (Ch. 800.00 to 1990.00 m) under Signature Project of SOPD-G (State Priority Scheme) for the year 2020-
BADP_Katigorah_17_18_01 Construction of Road from Saraspur to Leverputa Pt-II via Khelma Pt-III including 2 Nos of RCC Bridge over Gumrah River and Allarang Nalah Box Culvert (2.00m) for development of model village Khelma Pt-II under BADP for the
MMPPNA_23_24_291 (i) Construction of Road and Both Side Covered Drain at Saratpally Starting from Renu Singh petrol Pump to Pratap Das house via Saratpally Bazar with one box culvert near Tri-junction of Saratpally Bazar Ch. 0.00m to Ch. 1000.00m)
Const. of 2 Cell RCC Box Culvert at Syamthaibari
MMPNA/2023-24/31_Periodic Renewal of Road from NH-15 at Howajan to Arimoraghat road (PMGSY) and construction of RCC Slab Culvert No-3/1 on Nayanpur Tatibahar road to Dhalpur Simaluguri road Via No-3 Nimuri road under MMPNA 2023-24 under Bihpuria Lac
MMNPPNA_23_24_48 (i) Construction of road from CH.R.N Road to Goreswar 30 Bedded Hospital via Goreswar College Road (Ch 0.00 M to 500.00 M) at Ward No-3 as Gaurab Path (ii) Construction of RCC Slab Culvert and CC Drain at starting point of Rangia
Construction of road from Chapaguri Amteka Main Road near Bidhan Roys house to Manikpur Bazar Tiniali along with 1 No. RCC Cell Bridge and 3 Nos. Box Culvert under Bhabanipur VCDC (Length-2.9 KM) in Chirang District under CMs Goodwill Project in BTC
Additional OR to Diphu-Manja Road (NH-329) under Bakulia NH Division, Diphu for the year 2020-21 (Strengthening of Subgrade in Subgrade Failure Stretches with Cement Treated Sub-Base(CTSB) including construction of a Box Culvert at Km 12 Plus 600
Const. of Chirang and Baksa District connecting road from Bogidwara Muslim Basti to Hakuwa River via Abdaguri and Londonpara village road from Ch.0.00Km to Ch.2.00Km (Length - 2.00Km) with 1 No. RCC Box Culvert under SOPD in BTC area in Hakuwa VCDC,
Restoration of flood damaged road from Mothambil and Nasraibil to Dolgaon Road under SDRF for the year 2021-22 (Providing Earth work and GSB Works from Ch.350.00m to 1050.00m including construction of 3x3-5 Cell RCC Box Culvert).Pkg No.178_5
Retaining Wall at km 32.050 to 32.110 on NH-15 (Construction of Gabion Wall from Ch 32.050 to 32.105 km And Construction of Box Culvert at 34th km on NH-15 under Annual Plan 2021-22 (Job No - 15/AS/2021/22/220
Construction of road from Ulubari LP school to Babulal Boro house via Tarani Boro house, Bhobla Daimary house with 3 nos box culvert approximately 3.5 km at Tanabari under Salbari VCDC, Baksa under CMs Goodwill Mission Project for the year 2023-24. T
Restoration to Road from 2 No. Gormora Chapori to Chakalaghat Ali (Const. of Box Culvert 5m X 5m) in beach portion for the year 2020-21 under SDRF in Golaghat and Khumtai Territorial Road Division. Pkg.No. SDRF/20-21/GKTRD/KHM/02
STBR/SOPD-G/Rangapara-04/09 Construction of i)Namgaon Line Road,ii) Panipota 5 no line road,iii)Baithavanga Main road to Gobinbasti and iv)RCC Box culvert at No 1 Gerguajuli Middle Line under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA)
Construction of Box culvert at Thulungapuri village near Phungkha Brahmas house
Construction of road from NH-31C to Sijuguri via Chinamari by providing SDBC including 5 five nos. of RCC Box Culvert from Ch. 0.00 Km to 3.10 Km Length 3.10 Km of District Kokrajhar, Assam under CMs Goodwill Project for the year 2023-24. TN_26_25
MMPPNA_22_23_207 Construction of road from (i) Arimara to Padigaon from Ch. 0.00 m to 1389.00m, (ii) R.C.C. Box Culvert with Approach on Oiramghat PWD Road to Jumpani 3m x 3m Triple Cell-2 Nos. (Uriamghat Nepali to Kemi), (iii) NH-515 at Adi Leku
Construction of R.C.C. Box Culvert at Ch-750.00 m and approach road at Krishna Nagar to Barogatha Road under SCSP for the year 2021-22 in 114 Jonai (ST) LAC under Jonai Territorial Road Division in Dhemaji District. (Package No-JT/SCSP/2020-21/01)
SOPD_G_24_25_14 Construction of RCC Drain from (Ch. 260.00m to Ch.460.00m, Ch.470.00m to Ch.770.00m RHS) and (Ch. 458.00m to Ch. 1658.00m LHS) and Construction of one no of Box culvert size (2x 5.00m X 5.00m) at Ch.250.00m and its Approach at Silchar
Construction of ICBP road from Salbari to No.1 Batabary via Gandagagab, 1 No. Box Culvert from Ch.0.00 Km to 1.00 Km (Length 1.00 Km) under AOP, BTC for the year 2022-23 of Chirang District, Assam (LAC-31th Sidli ST).PKG NO.16_10
STBR/SOPD-G/Barchalla-01/35 Construction of (i) Ghat Gaon Road via Arasuti jungle LP school (ii) RCC Box Culvert No. 1/1 at Santipur to Sarsubari Road including approaches under SOPD-G for the year 2025-26 of District Sonitpur (Barchalla LAC)
Restoration of Bodo High School to Maj Gaon Road (PMGSY) by construction of RCC Box Culvert and causeway approaches under SOPD (SDRF) for the year 2020-21. (Package No. SDRF/SBRC/GOH/02)
Contst. of road from Khaothong Chowk to Mebla Boro house via Bijaypur village from Ch.0.00 Km to Ch.2.00 Km (Length-2.00 Km) with 2 Nos. RCC Box Culvert under SOPD in BTC area in Barpather VCDC, Chirang District for the year 2025-26. TN_133_08
Raising of NH-15 from Ch 402.400 km (Bhajugaon) to Ch 403.900 km (Jiadhal) (Total Length 1.500 km) along with providing with 3(three) nos of Box Culvert in the state of Assam under Annual Plan 2023-24. (EPC Job No. 15/AS/2023/24/249)
SOPD_G_20_21_227 Construction of road by ICBP (1) Dubia Railway Station road (From Ch. 0.00 to 369.00 m), (2) Dubia Borigaon road, (3) Pahukata to Tihulabari road, (4) Cross drainage work (Box Culvert 3.00 m x 3.00 m, 3 cell) at 5/2 and 5/3 Baisistha
Civil, Sanitary and Water supply and Electrical Work and Road Work