Loading…
Loading…
897 results • Best match
Const of(1) RCC Box culvert (3Nos Box culvert)(1No 3m x 3M single cell and 2 Nos 1m x 1m single cell) at Namphake Gaon Road 2)RCC Box culvert at Hapjan Parbat TE(3) RCC Boxculvert(C/D No2/1)on Sishumara Betoni Road under MMPPNA under SOPDG for 25-26
Construction of ICBP road from Dongapeta PWD to Saragaon Dwimuguri via Naoduba village road with 2 Nos. RCC Box Culvert over Sara river from Ch.0.00 Km to Ch.1.50 Km (Length 1.500 Km) under SOPD-G for the year 2022-23 of District Chirang. PKG NO.16_4
Const. of earth filling and sand gravelling alongwith one Box Culvert at Kunthaibari village
Re-Const of1)RCC box Culvert No.1/1 (3/44/0)on Dolopapathar to Krishnapur Deorigaon Rd 2 RCC box Culvert No.1/1 (3/33/0) on 2no Phulbari Sonari Chuburi Rd3) RCC box Culvert No.2/1 (2/44/0) on Borbam Pathar to Khagori gaon link Rd under MMPNA fr 25-26
DPRD/BTC/SOPD/Udl-36/2022/8
Conversion of Culverts from Cast-in situ to precast slabs by diamond cutting and lifting and cleaning of existing pre-cast culverts in Guwahati Refinery
Construction of 3.00m span RCC Slab Culvert at Ch. 400m on MB Road Chamuapara 6.00m span RCC Slab Culvert at Ch. 500.00m on Chintagaon to Bananguri Road under Mukhya Mantrir Path Nabikaran Aachani for the year 2023-24 Under Mangaldai LAC.
Civil Works of Storm Water Drains and Culverts for NREP Project at Numaligarh Refinery
Construction of road with RCC Box Culvert at Polashguri under BTC for the year 2025-26
DPRD/BTC/SOPD/Udl-15/2024/08
RCC Hume Pipe Culvert, Site No 1 Breast wall, Site No 2 Breast wall, Site No 3 Breast wall, Site No 1 Precast RCC hume pipe Drainage, Site No 2 Precast RCC hume pipe Drainage
Construction of 6.00 m Slab Culvert( Two Numbers) at Chainage 19950.00 m,20798.00 m at D1 Canal and 10.00 m Slab Culvert( One Number) at Chainage 4530.00 m at D2 Canal for ERM, Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
MMPNA/2023-24/264_Periodic Renewal of Road from Amaranagar to Indranagar Ch. 0.00m to Ch. 2500.00m Reconstruction of RCC Box Culvert at Ch 1710.00m Joypur to Langlacherra Road Borthol Road to Langlacherra 7 No. Basti Construction of Box Culvert No
Reconstruction of Dangarkuchi Betbari road (Provision of slab Culvert and repairing in stretches under SOPD (FDR) for 2019-20
Construction of Double barrel Box Culvert at Ch. 1950.00 M of Main canal of Rupahi I/S.
Restoration of Gossaigaon Bashbari Road RCC Box Culvert No.25/1 under SOPD (FDR) for 2019-20.
Construction of 1 (one) RCC Slab box culvert near Asaban Bibi house at West Duramari Tapuchar village
MMPNA/2023-24/212_Periodic Renewal of i) Sonabil to Malijan (Construction of double cell box culvert 2.00m by 2.00m at ch 5940.00m), ii)Guwalabasti to meatsupply via ganesh guwala LP school (construction of double cell box culvert 2.00m X 2.00m at ch
Construction of RCC Box Culvert with approach road at Soraigaon village under BTC for the year 2025-26.
Widening and strengthening of Subansiri R/B embankment from 37th Km to 41st Km including construction of causeway in Mudaibeel area.
Reconstruction of Dangarkuchi Betbari road(Provision of slab culvert and repairing in stretches) under SOPD(FDR) for the year 2019-20
Construction of Padumoni Village Road with 2x2x2 Box culvert under SOPD-G for the year 2019-20, Lakhimpur LAC
MAINT/SOPD-G/2025-26/70_1Improvement of GWC road from Barpeta Patbaushi Keoutkuchi Road to Mailkuchi,2Improvement of GWC road from Tetelirtal Chariall to Dakhin Tetelirtal Road with 1000 mm Dia Hume Pipe Culvert ,3Improvement of GWC road from Barpe
DPRD/BTC/(SOPD)Udl-25/2022/09
Construction of C.C. Block with Box Culvert Ramen house to Dukhi house via football field at Magurmari Pt-II village.
Construction of RCC Box Culvert with approaches at Dungripar Road under SOPD-G for the year 2019-20, Udharbond LAC
Custom Bid for Services - Pre Monsoon maintenance and Cleaning of all Culverts and Drains
ADDN / ALTN TO SEWAGE LINES, DRAINS AND CULVERTS AT AFS UNDER GE (AF) JORHAT.
Construction of 20 nos. of Culverts in DPNP under Soraipung and Margherita West Range
DPRD/BTC/SOPD/Udl-139/2020/8
Construction of Nepali Basti village road from Dantak road to Min Bahadur house with 1 No. RCC Box Culvert under Gurubasha
Construction of RCC Box Culvert (2 Nos) with approaches at BaliganjRoad under SOPD-G for the year 2019-20, Udharbond LAC
REPAIR DRAIN AND GATES BOUNDARY WALL, CULVERTS FOOTPATH, WALKING PLAZA AT LICHUBARI UNDER GE JORHAT.
Please refer NIT
DPRD/BTC/(SOPD)Udl-09/2024/09
Construction of RCC Box Culvert 5.00mX5.00m (Double Cell) at Ichacherra Diguncherra Road under SOPD-G for the year 2019-20, Udharbond LAC
Cutting and cleaning of railway culvert near railway siding and drain upto Samukjan culvert at Tikak Colliery
Recovery and Restoration of RCC Slab Culvert 6.00m span Dahalachuba to People Holy under NDRF(PDNA-2022) in Udalguri District for the year 2025-26.
Recovery and Re-construction of RCC Slab Culvert at Natun Bazar to NC Fata Simulu Road under NDRF(PDNA-2022) for the year 2025-26.
Recovery and Restoration of RCC Slab Culvert on No.1 Bainara to Barnadipar under NDRF(PDNA-2022) in Udalguri District for the year 2025-26.
REPAIR OF FENCING, FOOTPATH, CHEQUERED TILES, CULVERTS AND MISC WORK AT SMQ AT AF STN DIGARU
Desiltation and cleaning of various drains and culverts at different locations of Ledo and Tirap Colliery
REPAIR OF FENCING, FOOTPATH, CHEQUERED TILES, CULVERTS AND MISC WORK AT SMQ AT AF STN DIGARU
REPAIR TO FENCING, HARDSTANDING AND CULVERTS ETC MISC WORK IN DOMESTIC AREA AT AF STN TEZPUR
RIDF-XXVII/Sonitpur/01 Construction of (i)Dipota Bimaljan to Mowamari via Kholakhuti Kachari gaon (L 5.30km) by way of DBM, BC and Culvert works ,(ii)Road from Bhitor Paruwa to Harigaon (L 1.890 km) by way of ICBP and H.P culverts ,and (iii) Road fr
DPRD/BTC/6th ASFC-II/Bak-15/2024/24
Construction of RCC slab Culvert at Asrabari Centre to Milaipur connecting road near Geremsha Basumatary s house at Mazbat Forest Range under Dhansiri Forest Division Udalguri
Recovery and Restoration of Mougaon Hatibandha Bhuyahat road by construction of RCC Slab culvert under NDRF(PDNA-2022) in Udalguri District for the year 2025-26.
Construction of Culvert under SOPD Scheme Development of National Park and Wildlife Sanctuaries