Loading…
Loading…
2,531 results • Best match
Construction of paver road with retaining wall and road crossing culvert from Adivasi Colony Govt. UP School towards Makar Melana Padia at Bagurai Adivasi Sahi in Ward No.8
Construction of Box Cell culvert over Nagarpal Nallah on Jhumpura - Ukhunda road at 7/910 km in the district of Keonjhar under State Plan for the year 2024-25
Providing Storm Water Drainage connectivity from near Jagannath Mandir and Z Padmanabha near NH-16 underpass up to final outfall at existing culvert near KIA Showroom on NH-16
Repairing of CC drain with road from Upendra Prusti house to Siba Mishra house,one culvert and Drain from Babulu Das house to Raju Meher in ward no 11
Box Cell Culvert
Road and culvert
Construction of Boxcell culvert (3/87/0 m) over local nallah at 8/150 km on Road from PWD Road to Keshpur via Thanagaon, Jadirahula, Kharianala, Padampur
FDR TO BAINSIRIA SARANGPUR ROAD FOR THE YEAR 2020-21 (CONSTRUCTION OF BOXCELL CULVERT OF 1 SPAN X 6.00 M X 2.00 M AT 1.200 KM)to 2.485 km and 2.590 km to 3.090Km)
Construction work
Construction of C.C road with drain with culvert from Balaji Kirana Store to Singh Babu house via Gouro Bag house east Lane 4 at Hill town in Ward No. 16
S/R to RD road to Ragadipada road such as repair of boxcell culvert 2X6X3 m with hand railing, WBM, Gr-III and OGPC, Sealcoat for the year 2025-26
Construction of Box cell culvert 3/63/0 m at 0/000 km on Ranital Sabrang Road in the District of Balasore under State Plan for the year 2024-25.
SR to Sadingia to Rangapadar road such as repair to Box cell culvert (2x6x5) at Ch 3.500Km. and at 4.300Km. for the year 2023-24 in the district of Kandhamal
Construction of Retaining wall including RCC Drain with cover slab from Loyala School road to Siva Mandir (Rt. Side) culvert drain adjacent to Loyala School Pond in ward no 20
Construction of RCC Box cell culvert (2x6x3 Mtr.) at 6/750 Km of Kundheigola to Chadeimara road in the District of Deogarh under State Plan for the year 2022-23.
Construction of 4.00 Mtr x 3.00 mtr RCC Box cell culvert each at Ch.6/400 km and 19/500 km at Saradeipur-Nimapara Road for the year 2020-21
S R to Naranpur Sankarpur Bauripada Road from ch 19 192 km to 19 692 km and Construction of culvert at ch 19 300 km for the year 2022 23
Excavation of earth settled waste from the back side of Teli Sahi of Ward 03 to Mediri Sahi of Ward 15 passing through Puruna Bazar Sahi Culvert at Ward 04
CONSTRUCTION OF R.C.C. DRAIN WITH COVER SLAB FROM AMALAPADA ROAD NITIA SWEET STALL TO MAHENDRA SINGH BHATIA CLOTH STORE UPTO FISH MARKET CULVERT IN WARD NO.-7 FOR 2025-26.
Construction of Paver block road and RCC Culvert i) from Purnachandra Barik house to Nagendra Mandal house ii) Ashok Bisoi house to Ranjit Biswas house Block_B in ward no 04
WMM Pot hole repairing with berm dressing from the Road Balram Township D type end culvert to Karnapur Village ( Railway Level Crossing ) near Balram Township of BOCP under Hingula Area
Construction of RCC drain and culvert from Plot No 1042 midpoint of East Side to Plot No 1045 south corner point Over Main Drain No.5 at Laxmi Sagar Village
ANNUAL MAINTENANCE TO POTHOLES REPAIR ON HASANPUR TO MADANPUR ROAD FROM 0/000KM TO 3/330KM AND 1 NO. 1000MM DIA H.P. CULVERT SINGLE ROW FOR THE YEAR 2023-24
S/R to Berhampur Govindpur road such as jungle clearance and painting to trees and culvert parapets from 12/00 km to 25/00 km for the year 2025-26.
Construction of RCC drain and road crossing culvert and laying of RCC slab over existing open drain from RI Office side towards Subham Hospital back side in Ward No.11
SR to Dadaki to Duduki via Ramadi road such as reconstruction and renovation of RCC culvert 1x2.00x2.00m at Ch 5.450Km. for the year 2023-24 in the district of Kandhamal
Repair to Boxcell culvert on Barkul to Chasangara via Routarapalli road_Road_Railing and guard post,Both side appron concreting and repair to both approaches3.000 to 3.200 -R.A- 3.650 to 3.750 -L.A-
S/R to PWD road ( Rana sankha) to Rajib Nagar via Arachandi road(Protection work to boxcell culvert) at 0.330km in the district of Cuttack for the year 2024-25
Earth Work, Concrete Work
CANAL WORK
S/R to the road Balimela junction to Tunnel camp via dyke road such as protection work like floor, apron, cut off wall etc.to the culverts at Ch 4.87 Km, Ch 4.97Km, Ch 5.8Km, Ch 6.0Km, Ch 7.4 Km and Cause ways at Ch 18.40Km and Ch 18.45 km
Construction of Box cell culvert over local nallah at 18/050 km on Harichandanpur to Daitari Road (ODR) in the district of Keonjhar under State Plan for the year 2025-26
FDR to Road works (Such as Construction of Box-cell Culvert ) of Dhobadiha to Matiagad Road At 4750km for 2020 21.NH-6 to Dhalabani Road At -8 100km for2020-21.
Construction of Box Cell Culvert with approaches over Rengali Canal on Nandabara - Barapada Batto Road (ODR) from Ch. 3/567 km to Ch. 4/044 Km in the district of Keonjhar
Construction of Box Cell Culvert at Ch.1.250 Km on the road from Mausima Square to Lingaraj Temple Rath Road CRDP in the District of Khordha for the year 2022-23.
Improvement to Hirimimunda to Jhadiaguda MMSY road such as new boxcell culvert 6x3m double span and toe wall protection to boxcell at 2200 mtr under SR for the year 2022 23
Construction of Boxcell Culvert of size (3x3x3m) on Gandabahali to Liad at Ch.0/830 Km in Sinapali Block in the District of Nuapada for the year 2022-23 (Balance Work)
S/R to Sanagarh to Baunsagarh road for 2023-24 (such as repair to Box Cell culvert of size (1X8X4)mtr at Ch-0/460 KM and construction of Retaining wall)
Construction of Bridge (Box Cell Culvert 5/53m) over Gamaria Nallah at 2/969Km on Agarpada Kupari road in the district of Balasore under State Plan for the year 2023-24.
Improvement to communication facility (metaling) from RD 4300Km to 6840Km of SLMC along with construction of a multi box Cell Culvert at RD 3499M (R/B) and slope protection toe wall.
PWD Road to Jaba via Mantriamba, Mundiguda and Dhanibad Road _Road_RCC Culvert (1X4X3)Potholes repair by WBM GR-III, PMC and Sealcoat._At 5/900 km 3/900 to 7/800
S/R to Sarangada-Nuagaon-Balliguda Road (S.H-1) such as Construction of Box Cell Culvert 3x3 AND RCC Retaining wall with Drain at 79.110 km for the Year 2023-24.
Repair to ULB Road from FM Golei to Town PS via- Fandi Chhak such as construction of 2Nos Box Cell Culvert at 0.450 km and 1.10km for the year 2019-20
Construction of paver road and Renovation of drain from Municipality Market side culvert towards Basanta Padhi house via Kishore Behera and Santosh Malik house at Netaji Nagar in Ward No.10
Strengthening and widening of Road from Saraswati Vidyamandir junction to Traffic Post No. 2 junction (Towards Village Hensmul) along with drains and Culvert at specific location under Bhubaneswari OCP , Jagannath Area.
Special Repair of Bridge and approaches for the Construction of RCC Culvert at 2nd Km on Saliha to Tongopani part -II Road ch.1/870 Km for the year 2024-25
Construction of Box cell Culvert cut and cover over SH-61 (Baripada-Chitrada- Amarda Railway Station Road) at Chainage 31.500 km in the District of Mayurbhanj for the year 2024-25
S/R to Gaiguhala square to Turubudi road such as jungle clearance and painting to trees and culvert parapets from 0/0 to 2/00 km for the year 2025-26.
Renovation of RCC Drain from Old NAC Office back gate to the culvert near the house of Biranchi Swain at Patapur Patana Main Road in Ward no. 13 of NAC Daspalla